Applied cases of advanced construction & engineering technology at Tower Palace III Project (타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례)

  • Wang In-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-213
    • /
    • 2003
  • Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

  • PDF

Revitalization Methods of EIFS for High-rise Residential Buildings through Using TACT and Gangform System with Hanging Scaffolding

  • Lee, Sang-Hyun;Yi, June-Seong;Shin, Seung-Woo;Kang, Hae-Min
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.4
    • /
    • pp.407-418
    • /
    • 2011
  • Recently energy management measures at the political level, for the purpose of reducing energy consumption in the building sector, are being actively introduced. As a practical method, the exterior insulation method, which is proven to effective in reducing the energy loss through walls, has been favored. In this study, detailed implementations are suggested to activate exterior insulation system which can improve the housing insulation performance. The newly designed Gang-form system with hanging scaffolding was suggested to revamp constructability for finishing outer wall. The research results are based on a multifaceted analysis of the current problems of exterior insulation systems, and on recommendations proposed by exterior insulation experts in the Charrette discussion. The study has indicates that the customized TACT schedule considering the site condition has shortened the construction period to 5 months from 7.5 months. Through utilizing the suggestions of this study, the prevalence of exterior insulation systems is expected to become widespread.

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

A study on the safety improvement and productivity's increase through continuous preventive maintenance. (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • YANG DOOJIN;LEE CHANGHO
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.131-141
    • /
    • 2004
  • This study deals with the procedure of safety improvement, productivity increase, and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind, the necessity, and the concept of preventive maintenance, and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss, comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

  • PDF

A Study on the Tact Management Using a Daily Report Information (작업일보 정보를 이용한 택트공정관리방안 연구)

  • Kim Sun-Kuk;Na Kwang-Soo;Kim Tea-Hui;Yu Jung-Ho;Lee Hyun-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.80-87
    • /
    • 2003
  • Recent construction projects, characterized by its complication and high-tech, requites highly efficient management efforts. Among others, labor management is very important due to various trades and increasing number of activities. Along with advanced information technology, Web-based construction site management systems are widely adopted in order to improve the efficiency of construction management. However, such information systems have mainly 2 (two) shortcomings. One is that the existing systems were developed and implemented not in subcontractor-centered way but in main contractor-centered way, though the daily construction information is mainly generated, gathered and reported by subcontractors. As a result, subcontractors seldom have access to such information systems. The other is that loss or omission of information may uclw during the information processing process, in which subcontractors have no direct access to such information system. This becomes a major reason of losing the reliability of the information in daily construction report. As a solution for these problems, this paper suggests a Web-based information system that is subcontractor-oriented and also suitable for tact schedule management.

Relationship between Self-esteem, Self-awareness, and Empathy of Nursing Students in Un-tact Era (언택트(Un-tact) 시대 간호대학생의 자아존중감, 자기인식, 공감과의 관계)

  • Ok-Hee Koo
    • Journal of Industrial Convergence
    • /
    • v.20 no.12
    • /
    • pp.49-57
    • /
    • 2022
  • This study was conducted to investigate the relationship between self-esteem, self-awareness, and empathy and to identify factors that influence empathy among 302 nursing students from a university in C city from March to May 2021. The collected data were subjected to t-test, ANOVA, correlation and multiple regression analysis. As a result of the study, empathy was 3.59 points out of 5, and gender and nursing department satisfaction were significantly different from empathy. The factors that had a significant effect on empathy were private self-awareness, public self-awareness, positive self-esteem, and gender, with the explanatory power of 22.9%. In order to increase the level of self-esteem, self-awareness and empathy for nursing students, it is necessary to establish a new curriculum that examines interest in their inner world. Development of various curriculum programs such as team classes that help promote interaction using small groups and role-playing classes that explore and experience one's own or others' thoughts and emotions are suggested.

Analysis of Large Bus Production System for the Introduction FMS (FMS도입을 위한 대형버스 생산시스템 분석)

  • 정영득;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2000.05a
    • /
    • pp.97-110
    • /
    • 2000
  • Production schedule and realization quantity of Large type bus [929(HD), 928, 928-A(SD), 937E/L, 937/L,] were analyzed in order to intruoduce FMS(Flexible Manufacturing System) appropriate for varities of customer desire and multi-item, small lot production. And this paper is aimed to propose introduction method of FMS, analyzing zig tools change times and idle times with production line and workers as an object. According to analysis results, only simple spec., depending on bus type, changed with decrease in production. For 929(HD), 928,928-A(SD), 937Eh, 937/L bus type, there was no harmony between schdule and realization. Therefore, it caused many difficulties in part supply. And there was loss of manpower and reduction of productibility due to idle time of process with bus type change. Production processes were operated inefficiently because tact time exceeded or shortaged of allow time.

  • PDF

The Effect of Un-tact Emotional Schema Group Counseling Program on the Improvement of Emotional Ability of Unmarried Couples with Relationship Conflict Experiences (비대면 정서도식 커플 집단상담 프로그램이 관계갈등경험이 있는 미혼 커플의 정서능력 향상에 미치는 효과)

  • Jang, Sung-Ho;Park, Jae-Seo;Hwang, Boon-Hong;Shin, Sung-Man
    • Journal of Digital Convergence
    • /
    • v.19 no.9
    • /
    • pp.373-383
    • /
    • 2021
  • The purpose of this research was to develop an un-tact group counseling program to deal with the conflicts in the relationship of unmarried couples and to verify the effect of the program for improving emotional cognition and emotion regulation of unmarried couples. The research procedure consisted of the program development step and the program verification step, and in detail, 8 steps of program development processes were established. The subjects of the research were 11 unmarried couples, and 4 group were organized. The group counseling program was conducted once a week (2 sessions), a total of 10 sessions for 5 weeks. The effect was analyzed quantitatively and qualitatively. As a result of quantitative analysis, the participant's relationship satisfaction was significantly improved and there was a significant change in some relationship emotional schemas of participants. As a result of qualitatively analysis through participant's program review, participant's emotional understanding and the couple relationship were improved, and the group effect of the couple group counseling was found. Finally, the significance and limitations of this study were presented.

A Case Study on the Local Culture Festival in the Contact-free Era (비대면 시대의 지역문화축제 사례연구)

  • Ahn, Hyeryung;Kim, Kenneth Chi Ho
    • Journal of Digital Convergence
    • /
    • v.19 no.11
    • /
    • pp.425-438
    • /
    • 2021
  • The purpose of this study is to analyze local cultural festivals hosted contact-free in the corona era and to suggest the direction for sustainable festivals in the post-corona era. To this end, by analyzing the cases of well-known festivals held contact-free in 2020 and 2021, we tried to get implications for the festivals in the post-corona era from there. As a result of this study, contact-free festivals had the following characteristics. First, the on-tact method, which produces and transmits a video or allows interaction through real-time participation, was prominent. Second, in order to compensate for the shortcomings of the contact-free method, various efforts have been made to enable on-tact experience by making and delivering experience kits in the case of experiential elements of the festival in advance. Third, communication was secured through real-time comments, and fourth, products were sold through the Internet and live commerce channels, and a certain effect was obtained. In particular, in the case of online festivals, there is a problem of loss of the sense of place of the festival, but there are cases of online festivals with more participation than offline festivals. It is judged that the problem of how to achieve this will become a reference material for the future development of contact-free festival contents.

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.