• Title/Summary/Keyword: TAB (Testing Adjusting Balancing)

Search Result 5, Processing Time 0.018 seconds

A Performance Evaluation of Zone Smoke Control Systems for Railway Underground Transit Passage by Smoke Control TAB (제연 TAB를 통한 철도 지하환승통로의 거실제연설비 성능평가)

  • Seol, Seok-Kyun;Kim, Joon-Hwan;Park, Min-Seok;Oh, Seung-Min;Ahn, Yong-Chul;Choi, Jun-Ho
    • Fire Science and Engineering
    • /
    • v.31 no.1
    • /
    • pp.1-9
    • /
    • 2017
  • This study conducted Testing, Adjusting, and Balancing (TAB), which is a type of field performance evaluation experiment of a zone smoke-control system, at a railway underground transit passage installed with a zone smoke- control system to find problems and improvements for ensuring performance. TAB for the smoke control system was classified into several procedures, such as design data review, duct leakage test, field measurement of the airflow rate, velocity of the fan and duct, and a smoke test. Through the duct leakage test, the system leakage ratio was examined to prove the duct sealing. The iImprovement of the smoke control airflow problems due to the lack of fan static pressure loss was the secured performance. The performance of the smoke control fan was secured by improvements of the smoke control airflow rate problems caused by the loss of static pressure in the intake duct. The smoke test in the smoke control zone confirmed that the damper operating schedule subject was influenced by natural wind or train wind.

Study on the Necessity of T.A.B for Ventilation and Safety facilities of Road Tunnel (도로터널 환기 및 방재시설 T.A.B의 필요성에 관한 연구)

  • Yeo, In-Chul;Kang, Byung-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.75-81
    • /
    • 2005
  • The Necessity of TAB for the facilities of Ventilation and Safety system in a road tunnel is studied. TAB is to test, adjust and balance a system. The study is to investigate the advantage which results from carrying out TAB, with the measurement of temperature, velocity and pressure. The method of measurement of these factors and TAB procedure are a]so explained.

  • PDF

A Numerical Study on the Operation of Cooling System in an Office Building (사무소용 건물의 냉방시스템 운전에 관한 수치적 연구)

  • Lee, Seung Woo;Min, Man Ki
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.17 no.6
    • /
    • pp.686-695
    • /
    • 1988
  • An algorithm and a computer program were developed for the operational simulation of office building cooling system. Using this computer program, the following results were obtained. ${\bullet}$ There is a critical number of coil rows in AHU with which the cooling system can be operated in maximum efficiency. ${\bullet}$ Energy conservation can be achieved in an office building through TAB(Testing Adjusting and Balancing) of zone air volumes.

  • PDF

기획특집 - T.A.B. 수행절차 및 수행 계획

  • An, Jeong-Ho
    • 월간 기계설비
    • /
    • s.232
    • /
    • pp.50-70
    • /
    • 2009
  • T.A.B란 공기조화설비에 대한 종합시험조정으로 시험, 조정 및 균형(Testing, Adjusting & Balancing)이라는 뜻이다. 이는 설계 목적에 부합되도록 모든 빌딩의 환경시스템을 검토하고, 조정하는 과정이다. 따라서 T.A.B기술은 공기 및 물이라는 유체의 흐름과 온 습도에 관련된 분야이기 때문에 시각적으로 그 성과를 알아보기 힘들고, T.A.B를 적용한 후 결과치를 정밀 분석해 판단할 수 있으며 T.A.B기술을 적용하지 않은 건물과 간접비교하는 방법으로 그 효과를 쉽게 알 수 있다. T.A.B기술을 적용할 경우 시공 중인 건물에 설계도서가 완료되기 전, 또는 장비의 구매발주 전에 T.A.B측면에서 모든 기술 도서를 면밀히 검토하게 된다. 그 중 일부에서 발견되는 문제점들 즉, 적정치 못한 용량 선정, 시스템 구성상 미비점, 불필요한 장비 선정, 누락 사항을 발견할 수 있다. 따라서 T.A.B 기술을 적용할 경우 향상된 품질의 시공이 가능해 준공 후 빈번히 대두되는 하자 문제가 현격히 줄게 되며 또한 운전경비 절감, 쾌적한 실내환경 조성, 장비수명 연장 등 효율적인 운전관리 효과를 얻을 수 있다. 우리나라 공기조화설비기술은 꾸준한 발전을 이루었고, 최근에는 도입 초기단계시 전혀 고려되지 않던 공조공간의 쾌적성 및 소음 방지 대책 등의 문제가 주요사항으로 부각되고 있다. 이에 따라 공조설비에 T.A.B실행의 표준화 정착과정에 있으며, 국내 학계 및 연구기관에서 공조설비에 대한 연구 및 T.A.B용역업체의 기술축적 등 T.A.B분야 발전을 위해 노력하고 있다. 본지는 T.A.B의 수행절차 및 수행계획, TAB 수행업체 등에 대해 알아본다.

  • PDF