• Title/Summary/Keyword: Systematic Safety Inspection

Search Result 58, Processing Time 0.026 seconds

Structural evaluation of an existing steel natatorium by FEM and dynamic measurement

  • Liu, Wei;Gao, Wei-Cheng;Sun, Yi;Yu, Yan-Lei
    • Structural Engineering and Mechanics
    • /
    • v.31 no.5
    • /
    • pp.507-526
    • /
    • 2009
  • Based on numerical and experimental methods, a systematic structural evaluation of a steel natatorium in service was carried out in detail in this paper. Planning of inspection tasks was proposed firstly according to some national codes in China in order to obtain the economic and reliable results. The field visual inspections and static computation were conducted in turn under in-service environmental conditions. Further a three-dimensional finite element model was developed according to its factual geometry properties obtained from the field inspection. An analytical modal analysis was performed to provide the analytical modal properties. The field vibration tests on the natatorium were conducted and then two different system identification methods were used to obtain the dynamic characteristics of the natatorium. A good correlation was achieved in results obtained from the two system identification methods and the finite element method (FEM). The numerical and experimental results demonstrated that the main structure of the natatorium in its present status is safe and it still satisfies the demand of the national codes in China. But the roof system such as purlines and skeletons must be removed and rebuilt completely. Moreover the system identification results showed that field vibration test is sufficient to identify the reliable dynamic properties of the natatorium. The constructive suggestion on structural evaluation of the natatorium is that periodic assessment work must be maintained to ensure the natatorium's safety in the future.

Suggestion for the Maintenance Program of the Sea Dike Using Geophysical Methods (지구물리학적 방법을 이용한 방조제 유지·관리 체계 제안)

  • Yong, Hwan-Ho;Cho, In-Ky;Song, Sung-Ho
    • Geophysics and Geophysical Exploration
    • /
    • v.16 no.4
    • /
    • pp.275-283
    • /
    • 2013
  • The sea dike is the most important facility of reclamation projects, and plays an important role in securing freshwater in the reservoir. Systematic research on practical approaches and data analysis techniques are lacking even though some geophysical methods such as electrical resistivity and self-potential surveys are included within the inspection processes. Hence, geophysical methods were considered for improvement of precision safety diagnosis methods after problems in the maintenance system have been identified, such as safety checks and precision safety diagnoses. In addition, geophysical methods customized according to variations in ambient environmental limiting factors such as pore pressure changes by tidal fluctuation, compaction characteristics of the fill materials, and the surface condition of the embankment were suggested.

Reliability-Optimal Design Method of High-Speed Railway Bridges Based upon Expected Life-Cycle Cost (기대생애주기비용에 기초한 고속철도교량의 신뢰성-최적설계 방안)

  • Lee, Woo-Sang;Bang, Myung-Seok;Han, Sung-Ho;Lee, Chin-Ok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.102-110
    • /
    • 2010
  • The reliability evaluation may be a efficient method for estimating of the quantitative structural safety considering the effect of uncertainties included in high-speed railway bridges. The expected life-cycle cost(LCC) based upon the reliability evaluation will reasonably offer the safety level and design criteria of high-speed railway bridges. Therefore, this study determined the expected life-cycle cost and optimal design method of high-speed railway bridges on the basis of the result of the numerical analysis and reliability evaluation. For this, after creating various design method based upon the standard design of high-speed railway bridges, the numerical analysis is conducted on each of the alternative design methods. The reliability evaluation by the design strength limit state function is conducted considering the effect of external uncertainties on the basis of the numerical analysis result. The expected life-cycle cost of high-speed railway bridges is calculated on the basis of the reliability evaluation result by each of the alternative design methods. Also, the optimal design method is determined using the calculated expected life-cycle cost. In addition, The result of reliability evaluation and expected life-cycle cost of optimal design method are examined considering the effect of internal uncertainties. It is expected that the result of this study can be used as a basic information for the systematic safety evaluation and optimal structure design of high-speed railway bridges.

Study for Progress Rate of Standard Deviation of Irregularity Based on Track Properties for the Railway Track Maintenance Cycle Analysis (궤도 유지보수 주기 예측을 위한 구간 특성에 따른 궤도틀림 표준편차 진전정도 분석)

  • Jeong, Min Chul;Kim, Jung Hoon;Lee, Jee Ha;Kang, Yun Suk;Kong, Jung Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.31-40
    • /
    • 2012
  • The irregularity of railway track affects not only the comfort of ride such as noise or vibration but also the safety of train operation. For this reason, it is an interesting research area to design a reliable and sustainable railway track system and to analyze the train movement mechanism based on systematic approaches considering reasons of track irregularity possible in a specific local environment. Irregularity data inspected by EM-120, an railway inspection system in Korea includes unavoidable incomplete and erratic information, so it is encountered lots of problem to analyse those data without appropriate pre-data-refining processes. In this research, for the efficient management and maintenance of railway system, progress rate of standard deviation of irregularity is quantified. During the computation, some important components of railways such as rail joint, ballast, roadbed, and fastener have been considered. Probabilistic distributions of irregularity growth with respect to time are computed to predict the remaining service life of railway track and to be adapted for the safety assessment.

A Study of Evaluation System of NATM Tunnel using Delphi and AHP (델파이 및 AHP 기법을 활용한 NATM 터널의 평가체계 연구)

  • Park, Kwang-Rim;Chung, Jee-Seung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.6
    • /
    • pp.25-34
    • /
    • 2017
  • Since the 30-year-old facility is expected to surge from 10.5% to 23.9% in 10 years, the new evaluation system is needed to establish efficient maintenance system for securing the safety and extending the life span of existing facilities. In this study, Delphi and AHP(Analytic Hierarchy Process) was conducted to provide a systematic new evaluation system for the NATM tunnel, which is the most frequently constructed structure of the existing tunnel. Since the existing assessment systems are limited in scope of evlauatuon criteria, the survey was conducted in conjunction with closed questionnaires on existing items and open questionnaires for eliciting new items. In results, suitable evaluation factors were derived for the NATM tunnel through the validation of the survey results. Also after calculating weighted value of the derived assessment item using AHP technique, a new evaluation system is proposed to meet the characteristics of the NATM tunnel, so that they can be used as reference materials for revising and supplementing detatiled guidelines in the future.

A Study on Trends of Key Issues in Port Safety at Busan Port (부산항 항만안전 주요 이슈 동향에 관한 연구)

  • Jeong-Min Lee;Do-Yeon Ha;Joo-Hye Kim
    • Journal of Navigation and Port Research
    • /
    • v.48 no.1
    • /
    • pp.34-48
    • /
    • 2024
  • As global supply chain risks proliferate unpredictably, the high interdependence of port and logistics industry intensifies the risk burden. This study conducted fundamental research to explore diverse safety issues in domestic ports. Utilizing news article data about Busan Port, we employed LDA topic modeling and time-series linear regression to understand key safety trends. Over the past 30 years, Busan Port faced nine major safety issues-maritime safety, import cargo inspection, labor strikes, and natural disasters emerged cyclically. Major port safety issues in Busan Port are primarily characterized by an unpredictable nature, falling under socio-environmental and natural phenomena types, indicating a significant impact of global uncertainty. Therefore, systematic policies need to be formulated based on identified port safety issues to enhance port safety in Busan Port. Additionally, there is a need to strengthen the resilience of port safety for unpredictable risk situations. In conclusion, advanced research activities are necessary to promote port safety enhancement in response to dynamically changing social conditions.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Study of the Effective Management and Care System on in-Use Fire Fighteris Turnout Gear (소방복 유지관리시스템의 효율화 방안)

  • Son, Bong-Sae;Choi, Kye-Youn
    • Fire Science and Engineering
    • /
    • v.25 no.3
    • /
    • pp.72-77
    • /
    • 2011
  • This study aims to provide fundamental information required to establish an efficient maintenance and management system for fire fighting clothing which takes into account the domestic fire protection environment and situation. There aren't any detailed regulations and appropriate pre-inspection systems which would be required for proper maintenance of fire fighting clothing, as well as any test methods to determine the life spans of fire fighting clothing properly. Thus, this study tries to analyze the problems in use of fire fighting clothing and its maintenance situation and summarize overseas maintenance situation for fire fighting clothing. As a result, it is found that domestic fire fighting clothing is washed, repaired, and stored without any systematic management regulations. It is also found that the life spans of fire fighting clothing are determined, based on part of overseas management regulations on fire fighting clothing. Therefore, it is imperative to set up efficient management regulations and test methods for fire fighting clothing which would be required for efficient use of the fire fighting budgets and the life safety of fire fighters.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Remanufacturing Process Design for Automotive Alternator (자동차 교류발전기의 재제조 프로세스 설계)

  • Roslan, Liyana;Azmi, Nurul Ain;Jung, Won
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.179-188
    • /
    • 2011
  • This paper outlines a systematic guideline for remanufacturing process using the Failure Mode and Effect Analysis (FMEA) method in order to estimate the reliability and quality of the remanufactured alternator. The method is just a tool to help, but the remanufacturer must determine the optimal remanufacturing process and specific inspection and production that will turn the alternator as-good-as new and place the product into the market with reliability and quality equal to a new product. FMEA is a method that is widely used in industry and has shown its value and effectiveness in the above remanufacturing case study. Actions taken often result in a lower severity, occurrence or detection rating. Redesign may result in lower severity and occurrence ratings while inserting validation controls and maintenance can reduce the detection rating. The revised ratings are recorded with the originals on the FMEA template form. After these corrective actions and revisions have been established, evaluation of the ranks can be repeated, until the redesign and control parameters comply with safety standards.