• 제목/요약/키워드: System operation line

검색결과 1,499건 처리시간 0.024초

비축대칭 제품의 냉간단조 공정설계시스템의 개발 (Development of Process Planning System for Cold Forging of Non-axisymmetric Parts)

  • 이봉규;권혁홍;조해용
    • 소성∙가공
    • /
    • 제11권5호
    • /
    • pp.405-413
    • /
    • 2002
  • A process planning system for cold forging of non-axisymmetric parts of comparatively simple shape was developed in this study. Programs for the system have been written with Visual LISP in AutoCAD. Shape of the product must be drawn with the solid line and the hidden line, and with the plane and front view, as well. At the plane, the system recognizes the external shape of non-axisymmetric portions - the number of the sides of the regular polygons and the radii of circles inscribing and circumscribing the polygon. At the front view, the system cognizes the diameter of axisymmetric portions and the height of the primitive geometries such as polygon, cylinder, cone, concave, convex, etc. The system perceives that the list developed from the solid line must be formed by the operation of forward extrusion or upsetting, and that the list developed from the hidden line must be formed by the operation of backward extrusion. The system designs the intermediate geometries again by considering clearance between workpiece and die, and then finally the billet diameter, in reverse order from the finished product, on the basis of volume constancy and using the operations, the forming sequence, the number of operations and the intermediate geometries which were already designed. The design rules and knowledges for the system were extracted from the plasticity theories, handbook, relevant reference and empirical knowledge of field experts. Suitability of the process planning was analyzed using SuperForge of FVM simulation package. The results of analysis showed good formability.

전압안전성 온라인 감시시스템의 개발방안 (The Development Plan of Voltage Security On-Line Monitoring System)

  • 전동훈;권석기;안광원
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1173-1175
    • /
    • 1998
  • This paper presented the development plan of voltage security on-line monitoring system (VSECOMs). VSECOMs consists of voltage security monitoring system and data management system. VSECOMs has the function of bus voltage watch. voltage stability analysis, and voltage security assessment. EMS data on-line acquisition, PSS/E file conversion, and overall data management. VSECOMs is designed with client/server structure. We will seek stable operation of KEPCO's power system by installation of VSECOMs in EMS of KEPCO.

  • PDF

13[kV]급 수력발전기 고정자 권선의 운전 및 정지 중 진단시험 현장적용 평가 및 분석 (Site Evaluation and Application of the On-line and Off-line Test for the 13[kV] Class Hydropower Generator Stator Windings)

  • 장정호;이동근;이흥호
    • 조명전기설비학회논문지
    • /
    • 제25권11호
    • /
    • pp.73-82
    • /
    • 2011
  • The solid insulation system of stator windings in high voltage rotational machines is usually aging in accordance with long time operation. The partial discharge test have been known to check whether insulation deterioration exist or not, and the PD test can effectively diagnose a solid insulation condition regardless of during operation(on-line) or not(off-line). The on-line PD measurement have proven to be a successful technique in monitoring stator insulation condition nowadays. This paper describes the characteristics of comparing the on-line PD measurement data using PDMS-HG(Partial Discharge Monitoring System for Hydro-electric Generator) installed in field with the off-line diagnosis measurement data(insulation resistance, winding resistance, PI, ${\Delta}tan{\delta}$ and PD) on hydro generator(13[kV]) stator windings. These results make good use of managing rotational machines through evaluating the solid insulation condition of stator windings.

재고설비규모를 위한 최적분배 모델의 연구 (A Study on the Optimum Allocation Model for Inventory Capacity)

  • 최진영;정기호
    • 산업경영시스템학회지
    • /
    • 제5권6호
    • /
    • pp.1-6
    • /
    • 1982
  • The objective of this thesis to Provide a better insight into the effect of the amount of in-process storage has on the efficiency of production line with variable operation times. It is assumed that the material enters the line at the first work station and is then processed progressively through the line until it exits at the last work station, a finite amount of in-process storage is provided before all but the first work station of the line and the operation time of the work stations are statistically independent and follow exponential distribution. Under the above assumption, optimum allocation model is developed and following two approaches are used : 1) Given the available storage capacity, optimum allocation which minimizes the number of items in the line. 2) Given the available storage capacity, optimum allocation which. maximizes the utilization factor of the line. In a balanced three stage line, the production line efficiency is maximized under both categories when the second in-process storage is larger than the first.

  • PDF

전력용 변압기 온라인 유중가스 진단기준치 및 알고리즘에 관한 연구 (Study on the Criterion and Algorithm for On-line Dissolved Gas of a Power Transformer)

  • 권동진;곽주식;곽희로;김재철;진상범
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제54권5호
    • /
    • pp.206-212
    • /
    • 2005
  • In this paper, criterion and algorithm for on-line dissolved gas of a Power transformer are studied. For the initial diagnosis of a power transformer, the on-line dissolved gas analysis is one of the most important and acceptable item to preventively diagnose a power transformer. But the criterion and algorithm of this item are not established yet in korea. In this paper, criterion and alarm level of the on-line dissolved gas analysis are based on the analysis of on-line data of operating transformers, Korea industrial standard and operation manual for a power transformer as well as accumulated data of the preventive diagnosis systems which have been operated at nine substations of Korea Electric Power Co.(KEPCO) since 1997, Therefore, the criterion and alarm level proposed in this paper are to be well suitable and are adaptable for the domestic operational environments and conditions of the power transformer. Considering that the conventional diagnosis system is capable only of accumulating and monitoring data of the power transformer operation, the criteria and the algorithms make it possible to accomplish an ultimate goal of the preventive diagnosis system. It is expected, therefore, that they will have a beneficial effect on broad applications of the preventive diagnosis system and the achievement of manless substation system in the future.

표준전동차용 열차자동운전장치 (ATO) H/W 개발 (Development of Automatic Train Operation System H/W for KOREA Standard EMU)

  • 이수길;한성호;안태기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 B
    • /
    • pp.1457-1459
    • /
    • 2000
  • The ATO(Automatic Train Operation System) system is equipment for automatic and driverless operation of electric train with minimum control of operator. In this paper, we made ATO system with national technic and passed type test. We are convinced of reliability and safety of the ATO system on the seoul metro 7 line.

  • PDF

1선 지락 사고 시 3 권선 변압기에 적용된 초전도 한류기의 동작 특성 분석 (Analysis of Transient Characteristics of a SFCL Applied Into Third-winding Transformer in a Single Line-to-ground Fault)

  • 최혜원;최효상;정병익
    • 전기학회논문지
    • /
    • 제62권7호
    • /
    • pp.1033-1037
    • /
    • 2013
  • Coercion transformer is commonly used in the electrical grid which in three phase of distribution system. The accident of the electrical grid is divided into a single, a double, a third line-to-ground faults and a double, a third line-to-line faults. A single line-to-ground fault accounts for nearly 75[%] among them. In this research, when a Superconducting Fault Current Limiters (SFCL) was applied to the three phase power system, operation in a single line-to-ground fault and limiting characteristics of fault current according to turns ratio of third winding were analyzed. When a single line-to-ground fault happened, secondary winding's circuit was open. Then third winding's circuit with a SFCL was closed. So fault current was limited by diverted circuit. At this time, we could find out that size of the limited fault current could be changed according to third winding rate. We confirmed that limiting operation of the fault current was carried out within one-period. These results will be utilized in adjusting the size of the SFCL.

비대칭 불평형 전압 운전시 유도전동기의 동작 특성 해석 (Analysis on the Operation Characteristics of Induction Motor Operated by Asymmetric Unbalanced Voltage)

  • 김종겸;손홍관;정종호;이은웅
    • 전기학회논문지P
    • /
    • 제53권2호
    • /
    • pp.58-64
    • /
    • 2004
  • Most of the loads in industrial power distribution systems are balanced and connected to three power systems. However, in the user power distribution systems, most of the loads are single & three phase and unbalanced, generating voltage unbalance. Voltage unbalance is a condition in a polyphase system in which the rms values of the line-to-line voltages or the phase angles between consecutive line-to-line voltages, are not all equal. Slight voltage unbalance generates a disproportionately high current unbalance at the motor stator winding. This paper presents a scheme on operation states of a three-phase induction motor under unbalanced voltages. The three-phase voltages applied to the stator winding of the studied induction motor are controlled by respectively adjusting the magnitude and phase angle of each phase. The voltage unbalanced factor(VUF) of the three-phase source voltages can then be varied to examine the different values of VUF on machine's operation characteristics.

배전계통 운영비용의 최소화에 의한 분산전원의 최적 용량과 위치결정 (Optimal Capacity and Allocation Distributed Generation by Minimization Operation Cost of Distribution System)

  • 배인수;박정훈;김진오;김규호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권9호
    • /
    • pp.481-486
    • /
    • 2004
  • In operation of distribution system, $DG_s$ Distributed Generations) are installed as an alternative of extension and establishment of substations and transmission and distribution lines according to increasing power demand. In operation planning of $DG_s$, determining optimal capacity and allocation gets economical pro(it and improves power reliability. This paper proposes determining a optimal number, size and allocation of $DG_s$ needed to minimize operation cost of distribution system. Capacity of $DG_s$ (or economical operation of distribution system estimated by the load growth and line capacity during operation planning duration, DG allocations are determined to minimize total cost with power buying cost. operation cost of DG, loss cost and outage cost using GA(Genetic Algorithm).

기존선 해빙시스템을 위한 해빙전류 예측기법 및 구성 절차에 관한 연구 (A Study on Deicing Current Estimation Technique and Configuration Process for Deicing System in the Conventional Line)

  • 권삼영;박영;정호성
    • 한국철도학회논문집
    • /
    • 제9권2호
    • /
    • pp.237-243
    • /
    • 2006
  • Deicing system is to melt frost or ice freezed in catenary line when the temperature is lower than $0^{\circ}C$ in winter. The principle of deicing system is to melt frost or ice by Joule heat of catenary impedance. The performance of deicing is dependant of deicing current determined by the length of deicing section, deicing impedance and current division ratio of catenary line and messenger line. So, we present technique for estimating deicing current and process for determination of deicing section in the conventional line. Deicing impedance is estimated using Carson-Pollaczek equation, and current division ratio of catenary line and messenger line is estimated using voltage drop, and deicing current is estimated using power system data of deicing system. For the determination of the final deicing section, we verified estimated value comparing with experiment value of deicing impedance and current division ratio of catenary line and messenger line using low voltage experiment. Finally, we verified the validity of estimation technique and process using a simulated test data of real deicing system operation in the Chungju Substation, Chungbuk line.