Studied was a strategy of technology development for railway system in terms of railway network. First, The successful launch of the Korean HST system has not only decreased logistics burden but also significantly transformed the Korean trunk-line railway network, revolutionizing the logistics and technology sectors and reinvigorating the Korean railway industry in one century. Korean railway industry sector is now investing to develop many different types of railway system(G7, Post G7, tilting train...) so that these kinds of various railway system development should be integrated with the National Inter-modal Transportation Network Plan. To secure sufficient capacity that is required by the National Railroad Plan, the railway industry needs to establish mid- and long-term train purchase and operation strategies in compliance with railway construction and operation policies. During a railway construction planning, train operators, based on their train operation strategies, should come up with measures to closely cooperate with project operators from the planning stage through to the opening of a railway system. To be more precise, train operators should establish long-term train procurement plans reflecting both long-term national railroad network plans and plans for each railway line in order to suggest appropriate roles and schedules for each line. Also, based on the long-term railway plan, directions should be decided concerning the research and development of trains in advance.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.51
no.6
/
pp.290-295
/
2002
The present assignment in installing the number of switches for distribution line was made on the basis of a normal feeder capacity 7,000kVA in KEPCO(Korea Electric Power Corporation), Korea. But the normal capacity is revised to 10000kVA in 1998. Even increasing limit of the operating capacity of the distribution lines enables us to give some benefit for the operation flexibility and investment cost of the distribution system. It is disadvantageous in the viewpoint of supply reliability. In distribution systems, switches are equipped to improve the reliability of distribution systems by minimizing the outage section due to fault and maintenance. Utility generally improves the reliability by minimizing the length of outage section, which is caused by fault and maintenance, through switch equipment on distribution system. In order to cope with the changes such as operation capacity, it is necessary to study whether the present criteria is reasonable or not, also to confirm whether the present criteria of installing switches in line is improved or not. In this study, we proposes the number of switch per feeder on the basis of present operation capacity in distribution system.
In line with the expansion of electric railway, reducing carbon emission and optimal train operation are required by economical, eco-friendly and efficient management. Most of the energy consumption in electric railway is consumed by train operation. So it is important that minimize the energy consumption in train operation. An analysis of the operation performance of the new model vehicle which in South Korea, Korail introduced shows that the energy consumption is different in line with the skill level of the engine driver. In this study, the know-how of train operation of a skilled engine driver is systematized by using artificial intelligence, and the technique which supports engine drivers with train operation was offered. As a result of applying in South Korea, the Gyeongbu line by using simulation, it confirmed that the maximum 20% can reduce the energy consumption in comparison with unskilled engine drivers in case of applying the Expert System.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.4
/
pp.2324-2329
/
2014
The inspection of distance to go train control system conducted only when train is in main line or inspecting line, that affects low work efficiency and hazard elements to safe operation. Before or after train operation, the interface test between on-board and wayside signal system must be conducted. In this paper, onboard signal interface inspection system based on the real-time automatic analysis of onboard system status information that is transmitted to the wayside system and the operation status check of the onboard signal device operates as a virtual train information that is transmitted to the onboard system have been proposed. And after building the inspection system to the inspecting track of Daejeon Subway Line 1, Panam Depot, the verification algorithm of proposed interface test and the results was presented. therefore, it has enhanced work efficiency to do not carry train operation of a half hour in test line to test on-board system.
The Transactions of the Korean Institute of Power Electronics
/
v.8
no.6
/
pp.585-592
/
2003
The parallel operation system of UPS is used to increase reliability of power source at critical load. But parallel UPS system has a few defects, impedance is different from each other and circulating current occurs between UPSs, due to line impedance and parameter variation, though controlled by the same synchronization signal. According to such characteristic of parallel UPS, balanced load-sharing control is the most important technique in parallel UPS operation. In this paper, a novel power deviation compensation algorithm is proposed. it is composed of voltage controller to compensate power deviation that be calculated by using active and reactive current deviation between Inverters on synchronous d-q reference frame.
The purposes of this primary study are the selection of rail station and train operation management techniques for express-rail operation service at the convectional railway electrification. For these analyses, we used the KNR statistics and KROIS data of rail stations and train users by rail line. Therefore, we chose the important stations for express-rail operation of Kyongbu conventional rail line (esp. Seoul-Jochiwon section) through the rail transportation demand. and then, suggested primary operational management plan thorough the effects analyses of decreasing total travel time and increasing transportation demand by train speed-up. This study has some bounds and limits for proceeding, as it does, we excluded as followings: the conditionals of fate system, headways and train diagram, economic/financial analysis and technological assessment, and other railway technological infrastructures and a certain railcar specification, etc. . We propose to enlarge this study into a feasibility study of express or skip-stop operation service and compatible vehicle system decision considering with the best possible investment rail line, furthermore. in front of Kyongbu (Seoul-Busan) high-speed rail open in 2004, we have to try to progress the efficiencies of railway operation applying various train operation management plan.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.52
no.12
/
pp.641-648
/
2003
This paper proposes a novel UPFE based on H-bridge modules, isolated through single-phase multi-winding transformers. The dynamic performance of proposed system was analyzed by simulation with EMTDC, assuming that the UPFC is connected with the 138-kV transmission line of one-machine-infinite-bus power system. The proposed system can be directly connected to the transmission line without series injection transformers. It has flexibility in expanding the operation voltage by increasing the number of H-bridge modules.
Power system is becomming more and more complex and large. So system is stressed increasingly. This paper presents a method to select contingency ranking in power systems for EMS operation. Firstly, the proposed method is applied line outage using Thevenin equivalent circuit. Secondly, Contingency harmful to system is selected by loss variation between base case and fault. Thirdly, this paper prescribed simulated line sequence. Therefore this algorithm shows higher computation speed and effective memory use.
In an automated industry PLC plays a central role to control the manufacturing system. Therefore, fault free operation of PLC controlled manufacturing system is essential in order to maximize a firm's productivity. On the contrary, distributed nature of manufacturing system and growing complexity of the PLC programs presented a challenging task of designing a rapid fault finding system for an uninterrupted process operation. Hence, designing an intelligent monitoring, and diagnosis system is needed for smooth functioning of the operation process. In this paper, we propose a method to continuously acquire a stream of PLC signal data from the normal operational PLC-based manufacturing system and to generate diagnosis model from the observed PLC signal data. Consequently, the generated diagnosis model is used for distinguish the possible abnormalities of manufacturing system. To verify the proposed method, we provided a suitable case study of an assembly line.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.12
/
pp.2135-2142
/
2010
This paper studies the validity about a joint operation of neutral wire and overhead grounding wire in combined distribution systems. The overhead grounding wire and neutral wire are currently installed separately and grounded by common. However there is no any ineffectiveness or electrical problem in case of the proposed system, such system can be operated at real distribution system. Therefore this paper describes the suitability of a joint operation through lightning surge analysis on combined distribution systems. Lightning surge analysis is carried out by EMTP/ATPDraw to obtain the overvoltage of overhead line and underground cable in various conditions such as locations and current types of lightning stroke. Overvoltage gained by the analysis show that the insulation strength of the joint operation case is not stable compare with the current operation case.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.