The applicability of stainless steel type 316N to the PZR surge-lines of OPR1000 and APR1400 is investigated. So far, strainless steel type 347 has been used for the OPR1000 surge-lines. The degree of improvement in the leak-before-break(LBB) and component design margin is evaluated when stainless steel type 347 is substituted by type 316N. For the study, the tensile and J-R tests on type 316N and type 347 stainless steels were performed at 316 and the microstructure of both types was examined. Stainless steel type 316N shows the higher values on the stress-strain curves, J-R curves and stress intensity, Sm, compared to those of type 347. Therefore, stainless steel type 316N ensures the higher LBB and component design margins. As a result, this study shows that stainless steel type 316N could substitute type 347 for the surge-lines of OPR1000 and APR1400.
The Journal of the Korea institute of electronic communication sciences
/
v.10
no.8
/
pp.927-934
/
2015
In this paper, in order to prevent impulse surge PoE(Power Over Ethernet) communications error caused by natural phenomenon in industrial sites, countermeasure design of impulse surge of PoE communications equipment is suggested by designing dual impulse surge protection circuit. In order to analyze characteristic of impulse surge noise signal, surge generating device which meet international standard IEC 61000-4-5 is invented. And this device shows that surge signal is weakened by designing dual PoE power supply protection circuit by connecting surge generating device to the PoE data transfer line.
As transmission systems has been complicated and various, cases of transmission systems which is made up with underground cable line only or overhead transmission line with underground cable line have been increased. When transmission lines with different types of cable, it is more likely to be vulnerable to the surges. This paper analyzed these surge in 154kV transmission line by means of EMTP (Electro Magnetic Transient program).
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.3
/
pp.492-499
/
2011
This paper describes that the evaluation on operation practicality of Al conductor cable will be used instead of Cu conductor cable. Analysis is divided into two kinds of cases as transmission and distribution. To evaluate that Al conductor line has the insulation strength indeed safely, various analysis and calculation such as single line-to-ground fault current, lightning surge and allowance current were carried. Model was established based on real combined transmission and distribution is being used in utility with EMTP. The analysis results on Al and Cu conductor line were compared each other. It was proved that Al conductor line can be operated instead of Cu conductor line without special insulation problem in transmission and distribution, in electrical view point such as overvoltage and allowance current.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.1
/
pp.51-57
/
2016
This paper presents the voltage characteristics of the various faults after lightning surge hits the overhead grounding wire close to the transformer's secondary side. Based on the modeled distribution system, the cases of the various faults occurred by lightning surge are simulated using EMTP/ATPDraw and maximum overvoltage and RMS voltage according to the distances from the transformer are investigated. As a result, it is seen that the voltage characteristics of faults caused by lightning surge is different depending on the fault type and the voltage characteristics can be used to detect the fault type caused by lightning surge.
This paper describes the analysis results for the protection of lightning surge at 154 kV substation. We found that the surge arrester is needed at the inlet structure. The maximum overvoltage is about 1,500 kV at the circuit breaker without the surge arrester at the inlet structure. This value can be lower than 600 kV by installing the surge arrestor at the inlet structure. In addition to the incoming surge from transmission line, the shield wire should be considered to prevent the shielding failure by the direct lightning stroke.
This paper analyzes transient behavior due to switching overvoltage in 22.9kV combined distribution systems. Computer models are consisted of distribution overhead line model, underground cable model and surge-arrester model in this paper. The computer models are made by EMTP/ATPDraw simulation and Line constants are calculated by ATP_LCC. This paper analyzes the various parameters affecting. These factors include closing angle and cable length.
Kim, Nam-Yeol;Lee, Jong-Beom;Jang, Seong-Hwan;Gang, Ji-Won
The Transactions of the Korean Institute of Electrical Engineers A
/
v.51
no.10
/
pp.502-509
/
2002
In the analysis of lightning surges, transmission towers are usually simulated by ATPDraw. The modeling of transmission towers is an essential part of the traveling wave analysis of lightning surges in transmission lines. The tower model is applied to the 154kV transmission tower of which surge performance characteristics are measured Tower surge response is computed using nonuniform, single-phase line models for both transmission tower and ground wire. The overvoltage will effect to the underground transmission line. The underground cable is combined by duct and trefoil type, and the each arrester is placed on the leading-in tube and outgoing tube. This paper analyzed the effect of lightning overvoltage on the underground cable system.
In this paper, a fuzzy inference control system is proposed for a turbojet engine with fuel flow control input only. The proposed control system provides a practical fuel flow control method to prevent surge or flame out during engine acceleration or deceleration. A fuzzy logic is designed to obtain the fast acceleration and deceleration of the engine under the condition that the operating point should stay between the surge line and flame out control line. With using both engine rotating speed error and surge margin as fuzzy input variables, the desired engine rotating speed can be achieved to rapidly follow the engine control line without engine stall. Computer simulation using the MATLAB is realized to prove the proposed control performance to the turbojet engine which is linear modelized using DYGABCD program package.
We observed an Ellerman bomb(EB) and its associated surge using the Fast Imaging Solar Spectrograph(FISS) and the broadband TiO filter of the 1.6 meter New Solar Telescope at Big Bear Solar Observatory. As is well-known, the EB appears as a feature that is very bright at the far wings of the H alpha line. The lambdameter method applied to these wings indicates that the EB is blue-shifted up to 6km/s in velocity. In the photospheric level below the EB, we see rapidly growing "granule-like" feature. The transverse velocity of the dark lane at the edge of the "granule" increased with time as reached a peak of 6km/s, at the time of the EB's occurrence. The surge was seen in absorption and varied rapidly both in the H alpha and the Ca II 8542 line. It originated from the Ellerman bomb, and was impulsively accelerated to 20km/s toward us(blueshift). Then the velocity of the surge gradually changed from blueshift of 20km/s to redshift of 40km/s. By adopting the cloud model, we estimated the temperature of the surge material at about 27000K and the non-thermal velocity at about 10km/s. Our results shed light on the conventional idea that an EB results from the magnetic reconnection of an emerging flux tube and pre-existing field line.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.