• Title/Summary/Keyword: Supply plan process

Search Result 159, Processing Time 0.026 seconds

Multiagent Enabled Modeling and Implementation of SCM (멀티에이전트 기반 SCM 모델링 및 구현)

  • Kim Tae Woon;Yang Seong Min;Seo Dae Hee
    • The Journal of Information Systems
    • /
    • v.12 no.2
    • /
    • pp.57-72
    • /
    • 2003
  • The purpose of this paper is to propose the modeling of multiagent based SCM and implement the prototype in the Internet environment. SCM process follows the supply chain operations reference (SCOR) model which has been suggested by Supply Chain Counsil. SCOR model has been positioned to become the industry standard for describing and improving operational process in SCM. Five basic processes, plan, source, matte, deliver and return are defined in the SCOR model, through which a company establishes its supply chain competitive objectives. A supply chain is a world wide network of suppliers, factories, warehouses, distribution centers and retailers through which raw materials are acquired, transformed or manufactured and delivered to customers by autonomous or semiautonomous process. With the pressure from the higher standard of customer compliance, a frequent model change, product complexity and globalization, the combination of supply chain process with an advanced infrastructure in terms of multiagent systems have been highly required. Since SCM is fundamentally concerned with coherence among multiple decision makers, a multiagent framework based on explicit communication between constituent agents such as suppliers, manufacturers, and distributors is a natural choice. Multiagent framework is defined to perform different activities within a supply chain. Dynamic and changing functions of supply chain can be dealt with multi-agent by cooperating with other agents. In the areas of inventory management, remote diagnostics, communications with field workers, order fulfillment including tracking and monitoring, stock visibility, real-time shop floor data collection, asset tracking and warehousing, customer-centric supply chain can be applied and implemented utilizing multiagent. In this paper, for the order processing event between the buyer and seller relationship, multiagent were defined corresponding to the SCOR process. A prototype system was developed and implemented on the actual TCP/IP environment for the purchase order processing event. The implementation result assures that multiagent based SCM enhances the speed, visibility, proactiveness and responsiveness of activities in the supply chain.

  • PDF

Development of a Concentration Prediction Model for Disinfection By-product according to Introduce the Advanced Water Treatment Process in Water Supply Network (고도정수처리에 따른 상수도 공급과정에서의 소독부산물 농도 예측모델 개발)

  • Seo, Jeewon;Kim, Kibum;Kim, Kibum;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.5
    • /
    • pp.421-430
    • /
    • 2017
  • In this study, a model was developed to predict for Disinfection By-Products (DBPs) generated in water supply networks and consumer premises, before and after the introduction of advanced water purification facilities. Based on two-way ANOVA, which was carried out to statistically verify the water quality difference in the water supply network according to introduce the advanced water treatment process. The water quality before and after advanced water purification was shown to have a statistically significant difference. A multiple regression model was developed to predict the concentration of DBPs in consumer premises before and after the introduction of advanced water purification facilities. The prediction model developed for the concentration of DBPs accurately simulated the actual measurements, as its coefficients of correlation with the actual measurements were all 0.88 or higher. In addition, the prediction for the period not used in the model development to verify the developed model also showed coefficients of correlation with the actual measurements of 0.96 or higher. As the prediction model developed in this study has an advantage in that the variables that compose the model are relatively simple when compared with those of models developed in previous studies, it is considered highly usable for further study and field application. The methodology proposed in this study and the study findings can be used to meet the level of consumer requirement related to DBPs and to analyze and set the service level when establishing a master plan for development of water supply, and a water supply facility asset management plan.

A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members (PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구)

  • Jun, Young-Hun;Shin, Eun-Young;Yun, Won-Gun;Kim, Kyong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

A Study on the system Applied Air-Vent to Complex Lay Poly-Urethane Waterproofing Material and Air-Permeability Buffer Sheet of Disconnection Type (Web기반을 활용한 자재 조달 시스템 개선방안)

  • Lee, Im-Bae;Kim, Hong-Hyun;Yoon, Su-Won;Min, Kyung-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.141-145
    • /
    • 2008
  • Because of world financial crisis, The Korea domestic construction industry has been damaged hugely on material supplying work. A current domestic material supply system can't react properly on a great rise of foreign exchange rate and raw material price, so the system has a problem which is not properly supplying material. To solve this problem, a more innovative material supply work system is seriously needed than ever. So this study wants to improve material supply system for supplying material right time, right place through applying a web-based system. Applying this, overall process of material-supply-work can be done on a web-based system for immediately understanding change of ordering and warehousing by material-supply-schedule to a domestic construction field.

  • PDF

Consistency in the Basic Plan on Electricity Demand and Supply and Social Costs (전력수급기본계획의 정합성과 사회적 비용)

  • LEE, Suil
    • KDI Journal of Economic Policy
    • /
    • v.34 no.2
    • /
    • pp.55-93
    • /
    • 2012
  • In Korea, energy policies are actualized through various energy-related plans. Recently, however, as high-ranking plans, which are very vision-oriented, continually set higher sector-by-sector goals, subordinate action plans, which require consistency, encounter distortions in their establishment process. Also, each subordinate action plan reveals limitations in terms of securing flexibility of the plan in responding to uncertainties of the future. These problems pose potential risks such as causing huge social costs. In this regard, with an aim to provide empirical evidence for discussions on improving the procedure for developing and executing Korea's energy plans, this study mainly analyzes the Basic Plan on Electricity Demand and Supply-one of the most important subordinate action plans-in order to explain the problems of the Basic Plan in a logical manner, and potential problems that could occur in the process of sustaining consistency between the Basic Plan and its higher-ranking plans. Further, this paper estimates the scale of social costs caused by those problems assuming realistic conditions. According to the result, in the case of where maximum electric power is estimated to be 7% (15%) less than the actual amount in the Basic Plan on Electricity Demand and Supply, the annual generation cost will rise by 286 billion won and (1.2 trillion won) in 2020. Such social costs are found to occur even when establishing and executing the Basic plan according to the target goal set by its higher-ranking plan, the National Energy Master Plan. In addition, when another higher-ranking GHG reduction master plan requires the electricity sector to reduce emissions by additional 5% in the GHG emissions from the right mix in electricity generation with 'zero' cost of carbon emission, the annual generation cost will rise by approximately 915 billion won in 2020. On the other hand, the analysis finds that since economic feasibility of electric powers in Korea varies significantly depending on their type, Korea is expected to face very small potential social costs caused by uncertainties over the future price of carbon dioxide in the process of establishing the Basic Plan.

  • PDF

Operational Problem Analysis and Improvement Plan in the Smart Factory Promotion Process

  • Lee, Seong-Hoon;Lee, Dong-Woo
    • International journal of advanced smart convergence
    • /
    • v.11 no.4
    • /
    • pp.273-278
    • /
    • 2022
  • Uncertainty is increasing around the world due to COVID-19 and Ukraine crisis. In this situation, each company is making countless efforts to survive. In Korea, smart factory projects targeting small and medium-sized businesses with difficulties have been continuously promoted. As for the smart factory business that has been promoted so far, the base expansion of the smart factory is also steadily increasing as the number of companies carrying out the project is increasing. It was also found that it contributed to productivity improvement and quality improvement. Despite these positive aspects, difficulties and operational problems are also appearing in the process of promoting smart factories. In this study, we investigated and analyzed operational problems and difficulties in the process of promoting smart factories. In addition, improvement plans for problems were presented according to the contents of this analysis, and improvement plans were presented by classifying them into introduction and supply companies, considering that the smart factory business is formed in the form of a consortium between introduction and supply companies.

The Improvement Plan of a Cash Transportation Structure (현금수송구조의 개선방안)

  • Hong, Weon-Yong
    • Korean Security Journal
    • /
    • no.1
    • /
    • pp.409-423
    • /
    • 1997
  • Cash is apt to cause a accident in circulation process regardless of a time, a place and a subject due to its particularity. I propose a good service through circulation harmony by remodeling the system of the structure of cash supply and demand. And I propose accident prevention countermeasure by removing a caxh accident by the simplification, specialization and soientification of money business. I discuss the present condition and the points of cash transportation structure in Chapter 2 and the improvement plan of cash transportation structure in Chapter 3, and conclude in Chapter 4.

  • PDF

A Basic Study on the Uniformity of Apartment Dwelling and Handling Measure (주거 획일화와 극복방안에 대한 기초적 연구)

  • Choi Jung-Min
    • Journal of the Korean housing association
    • /
    • v.17 no.4
    • /
    • pp.25-36
    • /
    • 2006
  • The aim of this paper is to study on the background and the reasons of the uniformity of housing type and planning, and to find ways of coping with the related problems, focusing on the uniformity of apartment housing and it's excessive typical planning. In this process, I try to take suggestive hints from the case of Japan which already made an issue of uniformity of housing type and promoted the handling measure for the problem in a national level. The result includes that supplied apartment housing in Korea occupies about 80% of total housing supply each year, and the reasons for the increased apartment housing supply are attributed to many interactive influence factors. One of the influence factors is ascribed to mass housing system where many academic theories have supported the system under the interdisciplinary cooperation. In the case of Japan too many supplied condominium housing provoked the uniformity problem, however, the establishment of HOPE plan and a special association board oriented to the study of regional housing planning under Architectural Institute of Japan have considerably relaxed the uniformity problem.

A Study on SCM Connection using the Rosetta-net Standard (로제타넷표준을 적용한 SCM 연계에 관한 연구)

  • 서장훈;김용범;김우열
    • Journal of the military operations research society of Korea
    • /
    • v.29 no.1
    • /
    • pp.43-56
    • /
    • 2003
  • This paper is intended to investigate the Build-up Method of SCM(Supply Chain Management) Connection applying EC Standard. SCM helps companies plan and supply to meet customer demand. SCM is the only solution available today that enables an organization to strategize, plan and execute a company's buy, make, move, store, fulfill and service business processes across multiple enterprises for total profitability. The research of modern scientists has thrown new light on the subject. However, the study of SCM for EC Standard has been strangely neglected by critics. Consequently, existing SCM systems, which require to introduce the functions of EC, need to be changed. Summarizations of the main points that have been analyzed in this paper are as follows:. the sharing information for connection and the Rosetta-net standard of the existing SCM system(Order management module(PIP 3A4) of the Rosetta-net specifications for connection by the Rosetta-net). Finally, it shows the process of the gateway for connecting among the existing SCM systems.

The Designing of Production Planning Module for Advanced Planning System with Respect to Supply Chain of the Shipbuilding Industry (조선산업의 공급망을 고려한 APS 생산계획 모듈 설계)

  • Nam, Seunghoon;Ju, Su Heon;Ryu, Cheolho;Shin, Jong-Gye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.353-362
    • /
    • 2016
  • As ships become larger and construction of offshore plants increases recently, the amount of outsourcing has increased accordingly in the shipyard. Consequently, the system integration in terms of SCM (Supply Chain Management) of information and material flows has become much more important. Especially, since the SCM in the shipbuilding industry is operated in accordance with the production planning in connection with design, purchasing and production process which are the main components of the supply chain, the best production plan has to be established over the whole scheduling activities from the long-term planning to the short-term planning. The paper analyzes the characteristics of the SCM and the production planning system and suggests the need and the direction of APS (Advanced Planning System) development specialized in the supply chain management only for shipbuilding industry. Furthermore, propose a new SCP-Matrix (Supply Chain Planning Matrix), which is the basis of the APS development, appropriate for the shipbuilding industry and draw the core function of the APS module for the practical production plan.