• Title/Summary/Keyword: Supply Function Model

Search Result 256, Processing Time 0.029 seconds

Application of a Watershed-Based Land Prioritization Model for the Protection of Drinking Water Reservoir (상수원 보호를 위한 유역기반 토지관리 우선순위 모델 적용)

  • Lee, Jee Hyun;Choi, Ji Yang;Park, Seok Soon
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.5
    • /
    • pp.397-408
    • /
    • 2004
  • Due to the growing impact of non-point source pollution and limitation of water treatment technology, a new policy of water quality management, called a source protection, is now becoming more important in drinking water supply. The source protection means that the public agency purchases the pollution sensitive area, such as riparian zone, and prohibit locations of point and non-point sources. Many studies have reported that this new policy is more economical in drinking water supply than the conventional one. However, it is very difficult to determine location and size of the pollution sensitive zone in the watershed. In this paper, we presented the scientific criteria for the priority of the pollution sensitive zone, along with a case study of the upstream watershed of the Paldang Reservoir, Han River. This study includes applications of the analytical hierarchy process(AHP) and a watershed-based land prioritization(WLP) model. After major criteria affecting water quality were selected, the AHP and geographic analysis were performed. The WLP model allowed us to include both quantity and quality criteria, using AHP as the multi-criteria method in making decision and reflecting local characteristics and various needs. By adding a travel-time function, which represents the prototype effectively, the results secured adaptability and scientific objectivity as well. As such, the WLP model appeared to provide reasonable criteria in determining the prioritization of land acquisition. If the tested data are used with a validated travel-time and AHP method is applied after further discussion among experts in such field, highly reliable results can be obtained.

A Study on the Development of Optimal Renewal Planning Model in Water Supply Facilities Connected to Future Financial Plan of Water Providers (수도사업자의 장래 재정계획과 연계한 상수도시설의 최적 개량계획 수립 모델 개발 연구)

  • Lim, Sanghyun;Shin, Hwisu;Seo, Jeewon;Kim, Kibum;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.2
    • /
    • pp.149-159
    • /
    • 2017
  • It is considered necessary to renewal a considerable number of water supply facilities in Korea because they began to be intensively buried in the period of rapid economic growth. Accordingly, local water providers are required to take measures against this situation, but they have currently been caught in a vicious circle of the lack of budget spent in renewing water supply facilities because county-based small-scale local water supply cannot afford to cover annual expenditures with their revenues from water rates. Therefore, this study developed an optimal renewal planning model capable of achieving a balance of financial revenue and expenditure in local water supply using nonlinear programming and furthermore of minimizing the total cost incurred during the analysis. To this end, this study selected the water supply area located in County Y as a research area to build the financial revenue and expenditure and used Solver function provided by Microsoft Excel to use nonlinear programming. As a result, this study developed an optimal renewal planning model minimizing incurred costs in consideration of 6 items in the financial revenue and expenditure. The optimal renewal plan was modeled according to the available annual budget. As a result, this study proposed SICD, a scenario to minimize total costs from the perspective of water suppliers, and SITS, a scenario to minimize the increase in water rates from the perspective of consumers. It can be said that the method proposed in this study is the core of the optimal financial and renewal plans as a final stage of asset management for water supply facilities. Therefore, it is considered possible for local water providers to use the method proposed in this study according to circumstances for the asset management of water supply facilities.

Estimation of Optimal Target Amount for Efficiency Improvement Program of DSM (효율향상 프로그램의 최적 수요관리목표량 산정)

  • So, Chol-Ho;Park, Jong-Jin;Kim, Jin-O;Cho, Joong-Sam
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.842-843
    • /
    • 2007
  • In this paper, the proper rebate level can be decided in programs of energy savings by solving an optimization problem with an objective function, which satisfies a maximum value of total energy savings. And then, each prevalence amount is estimated by using virtual Bass model which is a function of rebate level, instead of the conventional Bass model. Finally, by cost/benefit analysis of the estimated prevalence amounts, the priority order is obtained for the investment of each program. The priority order obtained in this way may result the improvement of investment efficiency for DSM(Demand-Side Management) programs and the reasonable plan decision for supply and demand in power system.

  • PDF

Analytical and experimental study on aerodynamic control of flutter and buffeting of bridge deck by using mechanically driven flaps

  • Phan, Duc-Huynh;Kobayshi, Hiroshi
    • Structural Engineering and Mechanics
    • /
    • v.46 no.4
    • /
    • pp.549-569
    • /
    • 2013
  • A passive control using flaps will be an alternative solution for flutter stability and buffeting response of a long suspension bridge. This method not only enables a lightweight economic stiffening girder without an additional stiffness for aerodynamic stability but also avoid the problems from the malfunctions of control systems and energy supply system of an active control by winglets and flaps. A time domain approach for predicting the coupled flutter and buffeting response of bridge deck with flaps is investigated. First, the flutter derivatives of bridge deck and flaps are found by experiment. Next, the derivation of time domain model of self-excited forces and control forces of sectional model is reported by using the rational function approximation. Finally, the effectiveness of passive flap control is investigated by the numerical simulation. The results show that the passive control by using flaps can increase the flutter speed and decrease the buffeting response. The experiment results are matched with numerical ones.

A Combined Approach of Pricing and (S-1, S) Inventory Policy in a Two-Echelon Supply Chain with Lost Sales Allowed (다단계 SCM 환경에서 품절을 고려한 최적의 제품가격 및 재고정책 결정)

  • Sung, Chang Sup;Park, Sun Hoo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.2
    • /
    • pp.146-158
    • /
    • 2004
  • This paper considers a continuous-review two-echelon inventory control problem with one-to-one replenishment policy incorporated and with lost sales allowed where demand arrives in a stationary Poisson process. The problem is formulated using METRIC-approximation in a combined approach of pricing and (S-l, S) inventory policy, for which a heuristic solution algorithm is derived with respect to the corresponding one-warehouse multi-retailer supply chain. Specifically, decisions on retail pricing and warehouse inventory policies are made in integration to maximize total profit in the supply chain. The objective function of the model consists of sub-functions of revenue and cost (holding cost and penalty cost). To test the effectiveness and efficiency of the proposed algorithm, numerical experiments are performed with two cases. The first case deals with identical retailers and the second case deals with different retailers with different market sizes. The computational results show that the proposed algorithm is efficient and derives quite good decisions.

A Study on the Generation Expansion Planning System Under the Cost Based Pool (CBP 시장 체제하에서의 전력수급계획 수립 체계에 관한 연구)

  • Han, Seok-Man;Kim, Bal-Ho H.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.5
    • /
    • pp.918-922
    • /
    • 2009
  • The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning cannot use cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning process in the power markets. This system is composed of Regulator and GENCO's model. Regulator model used multi-criteria decision making rule. GENCO model is very complex problem. Thus, this system transacted the part by several scenario assuming GENCO model.

Optimal Design of Branched Water Supply System with GIS (GIS를 이용한 분기형 관로의 최적설계)

  • Kim, Joong-Hoon;Yeon, Sang-Ho;Geem, Zong-Woo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.4 no.2 s.8
    • /
    • pp.55-61
    • /
    • 1996
  • The objective of this paper is to show an optimal design model for branched water supply system which also can find the optimal location of pumping stations using linear programming. GIS is utilized in this model to better handle the data and the results front the optimization. The developed model considers hydraulic influences of some appurtenances such as supply tunnels and a filtration plant The model also considers tunnel construction cost which should be treated differently from pipe construction cost Different from other models presently available, the model guarantees a nonnegative pressure at every junction node in the system. The objective function includes annual operation cost (electricity rate) ill addition to initial construction cost, thus producing a more reasonable decision. The model selects the optimal diameter not in the form of continuous number but in the form of commercial discrete diameter (pipe size) using the pipe lengths as decision variables instead of pipe diameters. The model not only determines the optimal pumping head for each pumping station but also finds the optimal location and number of pumping stations. GIS is used to handle hydraulic and budgetary data automatically and to visualize the results for the of optimal design of the system. The model has been applied to an existing water supply system. 'The results show that the optimization model with the aid of GIS is helpful in the decision-nulling process for the design of more economical systems, and can be dot into practice successfully.

  • PDF

A Study of Prediction of Daily Water Supply Usion ANFIS (ANFIS를 이용한 상수도 1일 급수량 예측에 관한 연구)

  • Rhee, Kyoung-Hoon;Moon, Byoung-Seok;Kang, Il-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.6
    • /
    • pp.821-832
    • /
    • 1998
  • This study investigates the prediction of daily water supply, which is a necessary for the efficient management of water distribution system. Fuzzy neuron, namely artificial intelligence, is a neural network into which fuzzy information is inputted and then processed. In this study, daily water supply was predicted through an adaptive learning method by which a membership function and fuzzy rules were adapted for daily water supply prediction. This study was investigated methods for predicting water supply based on data about the amount of water supplied to the city of Kwangju. For variables choice, four analyses of input data were conducted: correlation analysis, autocorrelation analysis, partial autocorrelation analysis, and cross-correlation analysis. Input variables were (a) the amount of water supplied (b) the mean temperature, and (c)the population of the area supplied with water. Variables were combined in an integrated model. Data of the amount of daily water supply only was modelled and its validity was verified in the case that the meteorological office of weather forecast is not always reliable. Proposed models include accidental cases such as a suspension of water supply. The maximum error rate between the estimation of the model and the actual measurement was 18.35% and the average error was lower than 2.36%. The model is expected to be a real-time estimation of the operational control of water works and water/drain pipes.

  • PDF

Monopsony Power of General Hospitals in Nurse Labor Market (간호사 노동시장의 수요독점에 대한 연구 - 종합병원을 중심으로 -)

  • Jeong, Hyun-Jin;Yang, Bong-Min
    • Korea Journal of Hospital Management
    • /
    • v.5 no.2
    • /
    • pp.40-58
    • /
    • 2000
  • Nurses are medical personnel, who play a key role in supporting patient care, so it is important to supply them adequately in balance with ever increasing medical demand. But there appears severe shortage of nurses in some hospitals because of their uneven distribution, especially in small sized-hospitals and rural-hospitals. As nationwide distorted distribution of nurses in Korea is just like what monopsony model(a kind of market structure model) tells us, it is attempted to explain this situation of nurse labor market in Korea on the basis of monopsony model and presented in this paper. Specifically, determinants of nurse wage and the level of their relative employment were examined, and monopsony impact on their wage and the level of relative employment controlling those determinants were studied. Major results of this study arc as follows. The most important determinant of nurse wage level in this study was the wage level of a local community where each hospital located Hospital owner's characteristics an educational function of each hospital were also important factors. With these factor controlled, it was found that monopsony power of each hospital was negativel associated with nurse wage level as expected. 1% increase in monopsony power of hospital(measured by Herfindah-Hirschman Index) reduced nurse wage by $5,674{\sim}19,19$ won(in Korean currency). With regard to the level of relative employment, the most important determinant wa the capacity for supplying nurses of the local community. Again, hospital owner characteristics and educational function of each hospital were also important. With these factors controlled, it was found that monopsony power of each hospital was negative associated with the number of nurses per bed, as expected. 1% increase in monopsony power of each hospital(again measured by Herfindah-Hirschman Index) reduced the number of nurses per 100 bed as much as $0.46{\sim}0.67$. In conclusion. structural factors of nurse labor market influence the instability of nurse labor supply in Korea. Further consideration for these market structural characteristics needed for policy making related to nurse resource allocation.

  • PDF

Pogo Suppressor Design of a Space Launch Vehicle using Multiple-Objective Optimization Approach (다목적함수 최적화 기법을 이용한 우주발사체의 포고억제기 설계)

  • Yoon, NamKyung;Yoo, JeongUk;Park, KookJin;Shin, SangJoon
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.25 no.1
    • /
    • pp.1-11
    • /
    • 2021
  • POGO is a dynamic axial instability phenomenon that occurs in liquid-propelled rockets. As the natural frequencies of the fuselage and those of the propellant supply system become closer, the entire system will become unstable. To predict POGO, the propellant (oxidant and fuel) tank in the first stage is modeled as a shell element, and the remaining components, the engine and the upper part, are modeled as mass-spring, and structural analysis is performed. The transmission line model is used to predict the pressure and flow perturbation of the propellant supply system. In this paper, the closed-loop transfer function is constructed by integrating the fuselage structure and fluid modeling as described above. The pogo suppressor consists of a branch pipe and an accumulator that absorbs pressure fluctuations in a passive manner and is located in the middle of the propellant supply system. The design parameters for its design optimization to suppress the decay phenomenon are set as the diameter, length of the branch pipe, and accumulator. Multiple-objective function optimization is performed by setting the energy minimization of the closed loop transfer function in terms of to the mass of the pogo suppressor and that of the propellant as the objective function.