• 제목/요약/키워드: Supercritical once-through boiler

검색결과 12건 처리시간 0.02초

화력발전소 기동시 터빈 바이패스 시스템과 터빈 제어에 관한 고찰 (A Study on Turbine Control and Turbine Bypass Control during Startup of Thermal Power Plants)

  • 최인규;박두용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.1664_1665
    • /
    • 2009
  • Many years ago, most of thermal power plants built in this country were of subcritical pressure, of medium or small size, of constant pressure operations and of drum type steam generators with circulation type boilers. But, nowadays almost all of them were of high efficiency, of supercritical pressure, of big capacity, of sliding pressure operations, and of once through type steam generator. It has such advantage as the reduction of startup duration, but it control system and operation method are very complicated. It has a big difference in operation method of turbine and boiler. The feedforward control needs to be introduced to prevent such problems as thermal shock during the transit from normal operation into bypass operation. This paper introduces the turbine control and turbine bypass control during startup of thermal power plants.

  • PDF

변압 관류형 초임계압 화력발전소 전범위 시뮬레이터 개발 (The development of full-scope replica simulator for variable supercritical pressure once-through fossil power plants)

  • 이중근;안연식;정훈;이용관;한병성
    • 제어로봇시스템학회논문지
    • /
    • 제4권3호
    • /
    • pp.392-399
    • /
    • 1998
  • A full-scope replica type simulator whose MCR(main control room) has the same features and operation functions as MCR of the reference power plant has been developed for a fossil power plant. This simulator was developed with the model of Poryung Fossil Power Plant #3,4 which is the standard model of the Korean fossil power plant. It is the first localized simulator for the supercritical, variable boiler pressure type fossil power plant. The simulator provides various kinds of accidents which are in normal plant operation and thus enables operators to recover or reduce possible damages. To design and develop this kind of simulator, we need to integrate high technologies such as system analysis, plant operation and system integration of mechanics, physics, computer science. CASE(Computer Aided Software Engineering) tools were used to develop the dynamic model. This simulator will greatly contribute to the improvement of the safety and efficiency of the fossil power plant by implementing operator training. In this paper, the outline of software and hardware configuration and characteristics of the simulator are described, and the results of 30%, 50%, 75%, 100% load operation test will be discussed.

  • PDF