• Title/Summary/Keyword: Successful completion

Search Result 155, Processing Time 0.026 seconds

Improved Scheme to Manage Engineering Man-hour in a Plant Project (플랜트 프로젝트에서의 설계시간 관리 기법 개선 방안에 관한 연구)

  • Shin, Ji-Roh;Moon, Seung-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.5 no.1
    • /
    • pp.51-59
    • /
    • 2009
  • The global plant construction market has grown dramatically since 2000. As the market grows, domestic EPC contractors are expanding to meet its needs and have made great strides in terms of economic indicators from a decade ago. Larger projects involve a number of risk factors, such as volatile oil prices, however, and thus require quantitative and elaborate project management techniques for the ultimate success of a project's profitability. In addition, many Korean companies face difficulties in predicting potential risks and problems due to a lack of experience in dealing with the global market trend toward projects based on the Cost-re(Cost Reimbursable) contract as opposed to those based on the LSTK(Lumpsum Turnkey) contract. This study will examine methods and types of man-hour management according to plant project contract types. Further, it will explore the man-hour management system for successful completion of projects by satisfying the client's needs and enhancing the convenience in engineers' using the system. Additionally, this study will analyze the current system and identify its problems to address potential problems.

  • PDF

A Study on the Horizontal Management of the Fisheries in the Northeastern Pacific (북태평양 어업의 호리존탈.매니저먼트에 관한 연구)

  • 이재후
    • The Journal of Fisheries Business Administration
    • /
    • v.17 no.1
    • /
    • pp.41-76
    • /
    • 1986
  • The northeastern Pacific and eastern Bering Sea supports large and divers finfish and shellfish compelxes. The North Pacific fishing grounds are largest fish production total 30.89 percent of the world in 1983. Recent action by the around countries extending their fisheies jurisdiction to 200 mile has provided a new environment. The new approch to fisheries management has resulted in an arormous expansion in tile demand for scientific information. These are no longer limited to biological concerns. Emphasis has been focused recently on the need to understand the economic, social, politics and philosophy characteristics of a fishing and how they will be affected by management decisions. The horizontal management and portfolio management for fisheries has increased interest in complex biological models and the coupling of these models with economic, politics and phyisophy components. Successful completion of this task will require and expanded understanding of oceanographic, biological, economic, social, politics and philosophic process associated with fisheries. Particular attention should be devoted to acquiring information an data processing for Korean trawl fishery, stock assessment in the areas. The need for international collaboration in management must be stressed. Some northeast Pacific and eastern Bering Sea fish stock migrate over long distances and political boundaries. Further, nearly all the fish stocks are harvested by several nations. The features require cooperation and coordination of research activities. The horizontal management will be made a way these activities for the around countries in the sea. Strongly, tile proposed again, Pacific International Council for Exploration of the Seas, PICES will interest between all users of the area's fisheries.

  • PDF

Support Vector Machine Model to Select Exterior Materials

  • Kim, Sang-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.238-246
    • /
    • 2011
  • Choosing the best-performance materials is a crucial task for the successful completion of a project in the construction field. In general, the process of material selection is performed through the use of information by a highly experienced expert and the purchasing agent, without the assistance of logical decision-making techniques. For this reason, the construction field has considered various artificial intelligence (AI) techniques to support decision systems as their own selection method. This study proposes the application of a systematic and efficient support vector machine (SVM) model to select optimal exterior materials. The dataset of the study is 120 completed construction projects in South Korea. A total of 8 input determinants were identified and verified from the literature review and interviews with experts. Using data classification and normalization, these 120 sets were divided into 3 groups, and then 5 binary classification models were constructed in a one-against-all (OAA) multi classification method. The SVM model, based on the kernel radical basis function, yielded a prediction accuracy rate of 87.5%. This study indicates that the SVM model appears to be feasible as a decision support system for selecting an optimal construction method.

A Study on Predicting Construction Cost of School Building Projects Based on Support Vector Machine Technique at the Early Project Stage (Support Vector Machine을 이용한 교육시설 초기 공사비 예측에 관한 연구)

  • Shin, Jae-Min;Park, Hyun-Young;Shin, Yoon-Seok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.153-154
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So many method and techniques have developed that can estimate construction cost using limited information available in the early stage. Among the techniques, Support Vector Machine(SVM) has received attention in various field due to its excellent capacity for self-learning and generalization performance. Therefore, the purpose of this study is to verify the applicability of cost prediction model based on SVM in school building project at the early stage. Data used in this study are 139 school building cost constructed from 2004 to 2007 in Gyeonggi-Do. And prediction error rate of 7.48% in support vector machine is obtained. So the results showed applicability of using SVM model for predicting construction cost of school building projects.

  • PDF

Degradation Monitoring of Visible Channel Detectors on COMS MI Using Moon Observation Images (달 관측 영상을 이용한 천리안위성 기상탑재체 가시채널 검출기의 성능감쇄 분석)

  • Seo, Seok-Bae;Jin, Kyoung-Wook
    • Korean Journal of Remote Sensing
    • /
    • v.29 no.1
    • /
    • pp.115-121
    • /
    • 2013
  • The first geostationary satellite in Korea, COMS (Communication, Ocean, and Meteorological Satellite), has been operating properly since its successful completion of the IOT (In Orbit Test). COMS MI (Meteorological Imager) acquires Earth observation images from visible and infrared channels. This paper describes a method to compute the degradation of the COMS visible detectors and the result of the degradation during the two years of the operation. The visible channel detectors' performance was determined based on the comparison between the instrument-based measurements and ROLO model-based values. The degradation rate of the visible channel detectors of COMS MI showed a normal condition.

A Study on the Electronic Payment and Settlement System in EU (유럽의 전자결제제도에 관한 연구)

  • CHOI, Byoung-Kwon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.67
    • /
    • pp.69-95
    • /
    • 2015
  • The main purpose of this study is to analyse what are the key financial innovations in the euro area electronic payment systems. TARGET2 is the RTGS-system provided through the Eurosystem. It is used for settling central bank operations, for large interbank transfers in euro and also for other euro-denominated transfers. The specific features of TARGET2 include processing in real time, settlement in central bank money and immediate finality. In addition, the SEPA is a payment-integration initiative of the European Union for simplification of bank transfers denominated in euro. In particular, the main innovations consist of the completion of the phased migration to the TARGET2 infrastructure, and the introduction of a single retail payment market in euro - the SEPA and its products, schemes and frameworks. As the study analyse, the key innovations consist of the TARGET2 introduction, SEPA establishment and migration towards the T2S system. These innovations will lead to a better understanding of the payment and settlement systems' behavior in stress situations and to enhance the stability of the euro area financial system. Moreover, the successful integration of the European payment and settlement infrastructures will further contribute to the integration of the European financial markets, as well as to their higher competitiveness.

  • PDF

The Introduction of Converter Station Construction for HVDC Link Project between Jindo and Jeju (진도~제주간 직류연계 사업을 위한 변환소 건설 개요)

  • Lee, Jong-Seok;Moon, Bong-Soo;Kang, Won-Tag;Kim, Kyeong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.357_358
    • /
    • 2009
  • According to the 4th BPE(Basic Plan for long-term Electricity Supply and Demand), Electricity demand of Jeju island in 2012 will be reached to 682MW. Jeju island will be faced with severe shortage of electricty, also needed to find transport route to supply green energy which will be made from "Carbon free island" energy policy toward land at that time. For that reason, The plan which construct 400MW size HVDC connection line was decided for potential supply stabilization and transportation of green energy. KEPCO organized special construction office not only to observe the successful project completion which aims 2011 December but also to build up professional manpower. KEPCO is putting spur to the HVDC project these days. Construction site of converter stations has been already confirmed and contracts of cable, converter have done as per turn-key early this year. On this report, we would like to discuss about project scheme, main characteristics of system, and the furture progress plan of "Jindo~Jeju HVDC construction project expecially converter station part" which is being pushed by KEPCO.

  • PDF

Generation of lsoresponse Time Regions in Visual Tasks (시각작업시 등반응시간영역의 생성)

  • Jung, Eui-S.;Chung, Min-K.;Kee, Do-Hyung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.2
    • /
    • pp.53-64
    • /
    • 1993
  • Successful completion of a visual task in a predetermined time is very crucial to many operations such as piloting an aircraft. Although existing ergonomic interface models often provide a function of vision tests, it determines only the visibility at any given location. To complement this problem in existing models, the isoresponse time region considering the factors related to visual tasks is presented. Using a multiple regression model, equal response time regions were obtained within which mean response time is expected to be the same and is asymmetrical in shape. Among the factors considered, expectancy significantly decreased response time, and when cued, the effects of field heterogeneity, target uncertainty, density, size contrast and peripheral position on search time were less significant than those in unexpected cases. Response time and error rate, gender and visual acuity were not significantly correlated, and response time and age was positively correlated. These results are expected to be directly applicable to designing various visual tasks in real-life situations.

  • PDF

NPP Site Selection : A Systems Engineering Approach (시스템즈 엔지니어링 기법을 이용한 원자력발전소 부지 선정 방법에 대한 연구)

  • Pwani, Henry;Kamanja, Florah;Zolkaffly, Zulfakar;Jung, J.C.
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.9 no.1
    • /
    • pp.55-63
    • /
    • 2013
  • Nuclear power plant site selection is a complex process and its successful completion is a critical milestone in the NPP development cycle. Proper siting of NPP will ensure public health and safety, environmental conservation, reduced project failure risks and a smooth NPP development process among other benefits. The objective of this paper is to demonstrate the application of systems engineering to the problem of NPP siting in Kenya. The siting process demonstrated in this paper includes stakeholder need analysis where stakeholders are identified and their needs concerning NPP site are elicited and converted into system functional requirements. A value model is then developed and potential sites iteratively subjected to three types of criteria i.e. exclusionary criteria, avoidance criteria and suitability criteria. This process is used to identify the candidate sites. An additive value model; multiple objectives Decision Analysis (MODA) is then used to calculate candidate solutions values. The site with the highest solution value score is selected. Sensitivity studies using different criterion weight sets (thereby reflecting different viewpoints) can be conducted to assess their effect on the selection of a preferred site and thereby lend additional credibility to the decision process.

A Study on the Systems Engineering Management Plan for the Korean High-speed Electric Multiple Unit 400km/h Experimental (차세대 고속열차 개발을 위한 시스템엔지니어링 관리계획 연구)

  • Lee, Tae Hyung;Choi, Sung Hoon;Kim, Sang Soo;Park, Choon Soo;Kim, Ki Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.17-24
    • /
    • 2007
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperiment) project starts in 2007. It is required to control and balance the systems engineering activities throughout the project life cycle for a successful completion of the project. The Systems Engineering Management Plan(SEMP) is the primary, top level technical management document for the integration of all engineering activities within the context of, and as an expansion of, the project plan. A SEMP should be prepared for each project and regularly updated as development progresses. This paper proposes the systems engineering management plan for the HEMU-400X project.

  • PDF