• Title/Summary/Keyword: Stress of shotcrete lining

Search Result 33, Processing Time 0.021 seconds

Numerical Study for Tunnel Shotcrete Lining Operated Stress Measurement Techique Development During a Construction (시공중 터널 숏크리트 라이닝 작용응력 측정기법 개발을 위한 수치해석적 연구)

  • Shin, Hyu-Seong;Kim, Dong-Gyou;Jung, Yong-Su;Hwang, Jae-Hong;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.754-761
    • /
    • 2008
  • In general, stress measurement of existent shotcrete lining be used by pressure cells. but, measuring instrument is lost by high pressure at shotcrete lining construction and pressure cell's measurement value have to low believability by natural conditions like curing temperature. In this study, proposed techniques to measure without utilizing sensitive stress sensor in natural condition at point that want stress of shotcrete lining after shotcrete lining construction. Executed numerical analysis to forecast stress level that interact in tunnel shotcrete lining, measured strain of hole by load action through hole in shotcrete lining. 3D FEM(finite element method) is enforced through various parameters curing time of shotcrete lining, thickness, load condition. Different model cases applied by parametic study. As analysis result, it could grasp development possibility of method that propose this time because it could examine corelation with strain by near hole of shotcrete lining and stress about load condition.

  • PDF

Numerical approach on relationship between deformation of artificial crack and stress acting on tunnel shotcrete lining (인공균열 주위의 변형과 터널 숏크리트 라이닝 응력간의 상관관계에 대한 수치해석적 검토)

  • Shin, Hyu-Soung;Kwon, Young-Cheul;Bae, Gyu-Jin;Kim, Kyung-Shin;Kim, Hong-Taek
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.64-71
    • /
    • 2009
  • The stresses acting on shotcrete lining of tunnel have been measured virtually by monitoring instruments installed during construction. However, the malfunction of instrument and the lack of consistency of signal have always been controversial, but re-installation of instrument after construction of tunnel lining is practically impossible. Therefore, authors have carried out the study to develop a new technique for estimating the stress acting on shotcrete lining during and after construction. In the technique, stresses of shotcrete lining can be estimate by the measurement of deformation of free face. Therefore, the relationships between the stresses of shotcrete lining and deformation of free surface are indispensable factor. In this paper, the parametric study using 2D FEM analysis was carried out to estimate the relationships between the stress level acting on the tunnel shotcrete lining and the deformation near the free face (e.g. artificial crack in this study). The distribution of stresses of shotcrete lining is also investigated in this study as the preliminary investigation for the large-scale tunnel lining test and detailed 3D FEM analysis.

  • PDF

Case Studies for the Stress Measurements on the Shotcrete Tunnel Lining (터널에서의 숏크리트 응력 측정 사례 연구)

  • Kim, Hak Joon;Kim, Mi-Ran
    • The Journal of Engineering Geology
    • /
    • v.24 no.1
    • /
    • pp.81-89
    • /
    • 2014
  • Stress measurements of shotcrete lining were performed to evaluate the stability of the primary lining and to determine the thickness and the construction timing of the secondary lining. The current situation of stress measurements of shotcrete and problems related to judging the safety of shotcrete linings are presented, based on the results of several case studies. An improved method of performing stress measurements on shotcrete lining is also presented. In evaluating the safety of shotcrete lining, the use of absolute values of measured stresses would improve the reliability of the measurements.

An Experimental Study on the Behaviour of Tunnel Excavated in a Homogeneous Ground by Two-Stage Excavation (균질지반에서 2단계로 굴착되는 터널의 거동특성에 대한 실험적 연구)

  • 김동갑;박승준;이상덕
    • Tunnel and Underground Space
    • /
    • v.14 no.5
    • /
    • pp.345-352
    • /
    • 2004
  • In a shotcrete support system, the cooperation of the ground and the shotcrete lining makes it possible to transfer the shear stress to the shotcrete lining, which is dedicated to form a stable structure. In this study, a homogeneous model ground with constant strength was produced by using gypsum and the tunnel was excavated with a top heading method under the definite initial stress. During the excavation, the stress in the ground around the tunnel and the deformation of shotcrete lining were measured, The tensile stress was generated in tangential direction in the ground near the tunnel and in the shotcrete lining due to tunnel excavation. This shows the unified behavior of the ground and shotcrete lining, which is the most typical characteristic of the shotcrete support. As a result, the rates of in-situ stress during the excavation at a top boundary line was 9% and at top arch heading 15%. It was 48% right after excavating the heading and 94% before cutting the bench.

Suggestion for the improvement of the field measurements on the shotcrete lining (터널 숏크리트 계측의 개선방안)

  • Kim, Hak-Joon;Park, Si-Hyun;Bae, Gyu-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.177-192
    • /
    • 2010
  • The field measurements on the shotcrete lining are usually performed during the tunnel construction. However, the credibility of the measurements is not certain because of the non-stress related strains occurring in the shotcrete, the uncertainty of the deformation modulus of the shotcrete, and the intrinsic difficulties involved in the strain measurements in the shotcrete. The problem related to the field measurements on the shotcrete is investigated using the review of the previous studies and the field measurement performed for this study. A method for the correction of stress measurements at the shotcrete lining, considering the non-stress related strains, is suggested using the literature review and the actual measurements obtained from the non-stress shotcretes. The deformation modulus used for the calculation of the stress acting on the shotcrete is also suggested.

Reinforcement of Shotcrete Lining on the Side Wall of Tunnel in Enlargement of Existing ASSM Road Tunnel (측벽부 숏크리트 보강에 의한 재래식 도로터널 단면확대)

  • Kim, Donggyou;Shin, Youngwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.81-89
    • /
    • 2012
  • The existing tunnel in urban area can be enlarged because of requirement of road-widening by traffic growth. The protector with rectangular cross section can be set up in the tunnel, which will be constructed for enlargement of width, to solve traffic jam around the tunnel. It is impossible to install the rockbolt in the lower area of tunnel due to a limited space between the protector and cutting surface. The objective of this study is to suggest the method of shotcrete thickness increase instead of rockbolt installation in the side wall of tunnel for the stability of tunnel. Numerical analysis was performed to evaluate displacement at the crown of tunnel, convergence of tunnel, and stress in shotcrete lining in 3-lane and 4-lane NATM tunnels enlarged from 2-lane conventional tunnel. There were three types of analysis condition, rockbolt installation, no rockbolt installation, and increase of shotcrete thickness without rockbolt in the side wall of tunnel. There was no difference on the displacement at the crown and the convergence of upper tunnel. In the lower tunnel, the convergence in case of no rockbolt installation was larger as maximum 1.3mm than that in case of rockbolt installation. The stress in shotcrete lining in case of no rockbolt installation was larger as maximum 1.3MPa than that in case of rockbolt installation. Numerical analysis was performed to compare the behavior of shotcrete with rockbolt with that of shotcrete, which its thickness was increased, without rockbolt. The shotcrete has an increase of 20%(250mm ${\rightarrow}$ 300mm, 4-lane tunnel)~25%(200mm ${\rightarrow}$ 250mm, 3-lane tunnel) in its thickness to reduce the stress in shotcrete lining. The behavior of shotcrete lining increased the shotcrete thickness by 20%~25% was similar to that of existing shotcrete lining with rockbolt.

Numerical Study on Shotcrete Lining with Steel Reinforcement Using a Fiber Section Element (화이버 단면 요소를 이용한 강재 보강된 숏크리트 라이닝의 수치해석적 연구)

  • Kim, Jeong Soo;Yu, Jee Hwan;Kim, Moon Kyum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.919-930
    • /
    • 2014
  • In this study, the load capacities and behaviors of a shotcrete member with steel supports, as composite member, are investigated numerically by using a fiber section element. The cross section of a shotcrete lining with steel support is divided into a bundle of fibers, which are allocated nonlinear stress-strain relations and used for determining internal forces. To verify the used approach of the finite element method for shotcrete with steel supports, the load-displacement relations of shotcrete lining obtained by numerical analysis are compared with existing experimental results and are analyzed with the stress distribution of the shotcrete and steel support obtained numerically. As a result, it is shown that the proposed approach can predict the load capacities of each material and the overall nonlinear behavior of shotcrete lining with steel supports. The change of location of the neutral axis and the flexural resistance ratio of each material are also derived from the stress distribution of the cross section of the shotcrete lining with steel supports. From the results, it is concluded that the flexural resistance performance of steel support should be considered in shotcrete lining design.

A Study on the Rock Loads of NATM Tunnel Concrete Lining (NATM 터널 콘크리트라이닝 암반하중 산정방법 고찰)

  • 천병식;박태수;신영완
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.89-96
    • /
    • 2001
  • A concrete lining of NATM tunnel is the final product of a process that involves planning and evaluation of user needs, geotechnical investigations, analysis of ground-lining interaction, construction, and observations and modifications during construction. The designer must consider the lining in context of the many function, construction, and geotechnical requirements. Also, the loss of supporting capacity of shotcrete lining due to poor rock qualities and shotcrete erosion must be considered. The values, shapes, and estimating methods of rock load and water pressure are very different with every designers. Estimating methods of rock loads used in the design of NATM tunnel concrete lining are investigated. Numerical analyses are done in various conditions. And the rock loads estimated from radial stress and plastic zone are compared respectively.

  • PDF

Stress analysis for shotcrete lining on uneven tunnel perimeter (비평탄 굴착벽면의 숏크리트 라이닝에 대한 응력해석)

  • Lee, Seungdo;Moon, Hyun-Koo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.597-604
    • /
    • 2015
  • When a tunnel is constructed by drilling and blasting operation, the excavated perimeter becomes uneven due to overbreak at the drill holes so that the thickness of shotcrete tends to be irregular. In this case, the conventional stress analyses for tunnel lining of a uniform thickness cannot be readily applicable. In this study, the profile of tunnel perimeter assumed to be sinusoidal in order to simulate the uneven tunnel perimeter and to control the thickness of shotcrete by using the amplitude and wavelength. By adopting the sinusoidal function to a theoretical solution of stress analysis for uniform lining, the range of axial stress of irregular shotcrete can be estimated. The applicability of the approximate solution has been verified by performing a series of numerical analyses for various conditions. It is shown that the axial stress of shorcrete is highly dependent upon the irregularity of shotcrete, together with the ground property and initial stress conditions. It is also shown the shear stress is dependent upon the wavelength, and the stress condition becomes unfavorable where the thickness of shotcrete is relatively small. The approach developed in this study shows that the stress state where the thickness is relatively small is unfavourable, and it is necessary to take complementary measures when installing shotcrete after blasting.

New Austrian Tunneling Method (일본의 NATM시공)

  • Toyoki Kadoya
    • Explosives and Blasting
    • /
    • v.9 no.4
    • /
    • pp.22-31
    • /
    • 1991
  • NATM technic had been applied to Nakaya tunnel of Sin kan express R.R lines in 1975. on the worst expandable geological conditions, application of NATM method was carried out good result. Measurement data which include convergencymeter, inclinometer, extensometor load-cell, strain gage data of shotcrete stress and steel arch. was explained with slides. Induced NATM technic has been improved since 1975 as follows, specially adhesive method of shotcrete instead of spray method such as tunnel swift lining Sliding press lining, clean lining by pumping and sweeping tote lining ets.

  • PDF