Very High Temperature Gas Cooled Reactor (VHTR) has been selected as a high energy heat source for nuclear hydrogen generation. The VHTR can produce hydrogen from heat and water by using a thermo-chemical process or from heat, water, and natural gas by steam reformer technology. A co-axial double-tube primary hot gas duct (HGD) is a key component connecting the reactor pressure vessel and the intermediate heat exchanger (IHX) for the VHTR. In this study, a preliminary design analysis for the primary HGD of the nuclear hydrogen system was carried out. These preliminary design activities include a determination of the size, a strength evaluation and an appropriate material selection. The determination of the size was undertaken based on various engineering concepts, such as a constant flow velocity model, a constant flow rate model, a constant hydraulic head model, and finally a heat balanced model.
In this paper, the Superconductor flywheel energy storage system (SFESS) was used for the load frequency control (LFC) of an interconnected 2 area power system. The robust SFESS controller using quantitative feedback theory (QFT) was designed to improve control performance in spite of parameter uncertainty and unexpected disturbances. An overlapping decomposition method was applied to simplify SFESS controller design for the interconnected 2 area power system. The model for simulation of the interconnected 2 area power system included the reheat steam turbine, governor, boiler dynamics and nonlinearity such as governor deadband and generation rate constraint (GRC). To verify robust performance of proposed SFESS controller, dynamic simulation was performed under various disturbances and parameters variation of power system. The results showed that the proposed SFESS controller was more robust than the conventional method.
A generation rate of sludge in Korea had increased dramatically about $200\%$ for a decade. A requirement for high efficiency dewatering system being possible to produce the low water content cake have suggested due to the appearance of commercial and social problems about handling of dewatered cake. The conventional dewatering system with mechanical compression device was not suitable to produce the low water content cake and didn't cope with lots of requirements. Therefore, this paper was to develop the high efficient filter press with the compressive and heating forces through the heating plate to be built between membrane fillet plates. It is possible to produce the low water content cake and improve the dewatering rate, so this equipment positively coped with several types of problems related to the sludge dewatering. The plate heated by heat transfer materials such as steam, hot water and thermo-oil made the sludge make the residual moisture within the cake to discharge easily and to improve the dewatering efficiency of equipment. The pilot scale experiment with 500kg of cake production showed that the dewatering efficiency determined by the final water content and dewatering velocity was improved $30\%$ more than the conventional dewatering equipment.
Integrated Gasification Combined Cycle (IGCC) power plant converts coal to syngas, which is mainly composed of hydrogen and carbon monoxide, by the gasification process and produces electric power by the gas and steam turbine combined cycle power plant. The purpose of this study is to investigate the influence of using syngas in a gas turbine, originally designed for natural gas fuel, on its performance. A commercial gas turbine is selected and variations of its performance characteristics due to adopting syngas is analyzed by simulating off-design gas turbine operation. Since the heating value of the syngas is lower, compared to natural gas, IGCC plants require much larger fuel flow rate. This increases the gas flow rate to the turbine and the pressure ratio, leading to far larger power output and higher thermal efficiency. Examination of using two different syngases reveals that the gas turbine performance varies much with the fuel composition.
A generation rate of sludge in Korea had increased dramatically about 200 % for a decade. A requirement for high efficiency dewatering system being possible to produce the low water content cake have suggested due to the appearanceof commercial and social problems about handling of dewatered cake. The conventional dewatering system with mechanical compression device was not suitable to produce the low water content cake and didn'tcope with lots of requirements. Therefore, this paper was to develop the high efficient filter press with the compressive and heating forces through the heating plate to be built between membrane filter plates. It is possible to produce the low water content cake and improve the dewatering rate, so this equipment positively coped with several types of problems related to the sludge dewatering. The plate heated by heat transfer materials such as steam, hot water and thermo-oil made the sludge make the residual moisture within the cake to discharge easilyand to improve the dewatering efficiency of equipment. The pilot scale experiment with 500kg of cake production showed that the dewatering efficiency determined by the final water content and dewatering velocity was improved 30% more than the conventional dewatering equipment.
순환유동층 연소로에서 폐목질계 바이오매스를 이용한 5 MWe 규모의 발전시설에 대한 경제적 타당성에 대하여 고찰하였다. 초기투자비, 폐목재의 가격, 탄소배출권, 계통한계가격과 같은 주요 변수들이 사업의 경제성에 미치는 영향을 분석하였다. 폐목재를 무상으로 공급하고, 기반투자비용 106.5억원, 계통한계가격 99원/kWh의 기준에서 사업의 내부수익률은 16.67%로 계산되어 사업성이 비교적 높은 것으로 예상되었다. 사업의 수익에 영향을 크게 미치는 인자는 계통한계가격, 가동율, 초기투자비, 폐목가격, 탄소배출권의 순으로 나타났다. 또한 사업 위험도를 관리하기 위하여 판매처를 다양화할 수 있는 방안의 하나로 열판매가 가능한 열병합발전을 고려할 필요가 있는 것으로 판단된다.
The heating system for apartment complex may be classified as old systems including central system with steam boiler(S1), gas engine driven heat pump system(S2), system using waste heat(S3) and new systems including mechanical vapor re-compression system with flashing heat exchangers(S4), system using methanol(S5), system using metal hydride (S6). The purpose of the present study is to suggest optimal heating system by technically, economically and environmentally evaluating old and new heating systems of apartment complex from 500 to 3,000 households. Economic evaluation based on the technical evaluation results which estimated heat transfer area of heat exchangers and capacity of equipments was estimated initial investment cost, annual operating cost and relative payback period by considering annual increasing rates of energy cost and interest. Environmental evaluation provided annual generation rate of carbon dioxide. Initial investment cost was cheap in the order of S6, S5, S3, S2, S4, S1, annual operating cost was cheap in the order of S1, S2, S4, S5 and relative payback period was short in the order of S6, S5, S2, S3 and S4. Relative payback period was within 8 years for all scenarios of 3,000 households, and was increased as annual increasing rates of energy cost and interest were increased. As transportation pipe length was increased twice, payback period was increased by 1.4~2.6 time. The effect of temperatures of waste gas and waste water on the relative payback period was small within 0.8 years. The annual generation rate of carbon dioxide was big in the order of S4, S2 and S1. S4 was the most economic system among whole scenarios when S1 was replaced with other scenarios.
Journal of Advanced Marine Engineering and Technology
/
제38권6호
/
pp.625-631
/
2014
본 연구에서는 최근 LNG를 사용하는 화력발전소가 증가함에 따라 등장한 LNG-FSRU (Floating Storage Regasification Unit)에서 LNG를 육상에 있는 소비자에게 기체 상태로 전달하기 위해 Topside에 설치된 재기화 시스템의 열원온도 및 기화성능의 변동에 따른 시스템의 특성분석에 관한 연구이다. 시스템 특성분석을 위하여 LNG가 재기화 할 때 필요한 열원으로써 해수를 사용하는 기화방식과 에틸렌글리콜을 사용하는 기화방식으로 나누어 $-157.9^{\circ}C$, 10,400kPa의 LNG를 시간당 200ton 기화시키는 시스템을 구성하였고, 이때 공급되는 해수온도에 따라 필요한 해수의 최소유량 값을 구하였다. 그리고 에틸렌글리콜을 사용하는 기화방식에서는 지역 및 계절 등의 요인으로 인해 해수온도가 낮아질 경우를 대비하여 $174.5^{\circ}C$, 775kPa의 보일러 스팀을 추가열원으로 설치된 시스템을 구성하고, 필요한 스팀의 생성량을 기화성능에 따라 비교분석함으로써 해수온도 변화에 따라 요구되는 보일러 스팀의 양과 기화성능의 변화에 따른 해수 및 에틸렌글리콜 그리고 스팀의 양을 구하였다.
본 논문에서는 LNG 추진선박에서 발생하는 BOG(boil-off gas)를 이용하여 수소를 생산하고 수소 연료전지 시스템을 보조엔진으로 적용한 개질공정의 특성에 대한 연구를 수행했다. 연구를 위해 BOG 수증기 개질공정을 UniSim R410 프로그램을 이용해 공정설계하고, 개질기의 출구온도와 압력, SCR(steam carbon ratio)에 따른 생성물의 분율과 반응물의 소모량을 산출하였다. 연구 결과 개질온도가 890℃일때 메탄의 반응률이 100 %였으며, 최대 수소 생산량을 보였다. 또한 개질압력이 낮을수록 반응 활성도가 높았다. 하지만 그 이상의 온도가 되면 역반응의 우세로 인해 수소의 생산량은 감소하게 되고, 물과 이산화탄소의 양은 증가했다. 또한 SCR이 증가할수록 수소 생산량도 증가했으나 요구되는 에너지 소비량도 비례하여 증가했다. SCR이 1.8일 때 수소분율이 가장 높았으나 코킹방지를 위해 SCR이 3에서 운전하는 것이 최적 운전범위임을 확인했다. 그리고 개질압력이 낮을수록 발생되는 이산화탄소의 양은 증가했으며, 냉각 및 액화를 위해서는 이산화탄소 발생량을 기준으로 42.5 %의 LNG 냉열이 요구됨을 알 수 있었다.
폐기물 고형연료의 순환유동층 연소기술의 시범을 위하여 파일롯트 규모 순환유동층 연소보일러를 설계하고 건설하였다. 보일러의 규모는 출력기준 약 6 MWth에 해당하며 증기질은 $400^{\circ}C$, 38 ata로 설계하였다. 최대 증기출력은 약 8 ton/h에 해당한다. 연료는 RDF로 휘발분을 주성분으로 하며 점화가 빠르고 연소성이 매우 뛰어났으며 보일러의 연소효율은 99.5%를 능가하였다. 순환유동층 RDF 연소의 안정성은 연료중 회분 이외의 이물질의 존재 여부와 신속한 배출 가능성에 크게 의존하였다. 오염물질의 배출농도는 염소를 제외하고는 법적 기준치 이내에 들었다. 또한 60% 정도의 연료중 염소는 비산재에 흡수되는 것으로 나타났다. HCl을 국내 법 규제에 맞추어 제어하기 위해서는 건식 또는 습식 흡수 장치와 같은 별도의 환경설비가 필요하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.