• Title/Summary/Keyword: Standard unit cost

Search Result 199, Processing Time 0.029 seconds

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

The Study of Complex RF Unit in WiBro Base Station for Wave 2 Standard (Wave 2 규격을 위한 와이브로 기지국용 일체형 복합 RF unit 연구)

  • Choi, DooHun;Moon, Yon-Tae;Kim, Do-Gyun;Choi, Young-Wan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.9
    • /
    • pp.1660-1668
    • /
    • 2008
  • The WiBro was adopted to the 3G international standard. By the change of specification from Wave 1 to Wave 2, MIMO technology is applied in order to increase the speed of downlink. By MIMO the RF part of WiBro base station is increased to 2 Tx paths. Therefore, the size of RF part is bigger and material cost is increased. For reducing these demerits, the RF part which is consisted of PA, LNA, and TDD switch is designed to one complex RF unit. Also, the experimental results of the RF unit have been discussed. Since the complex RF unit is more compact than the RF part of Wave 1 base station, it can be used as the RF part of Wave 2 base station with 2T/2R MIMO.

A Development of a Framework Cost Estimation Model for the Digital Document Database Construction Projects (지식정보 구축 대가의 개발 : 국가직무표준(National Competency Standards)과의 통합 방안을 중심으로)

  • Kim, Sojung Lucia;Seo, Yong Won;Son, Young-ho
    • Journal of Information Technology Services
    • /
    • v.16 no.3
    • /
    • pp.47-65
    • /
    • 2017
  • The reference guide for the cost of establishing the digital documents has been used as a basis for establishing the budget for the construction of the knowledge information resource. However, due to the abolition of the nominal unit price notification in terms of IT projects, it is necessary to conduct research to convert the standard of the current labor force grade standard to the national incompetency standard (NCS). In this study, we investigate and revise the system and contents of the current knowledge information cost estimation model. In specific, i) we conducted gap analysis of cost estimation model and existing NCS model. As the contents conforming for the construction of the knowledge information resource were not adoptable, we define the description of the construction of the knowledge information resource and to identify the core elements of NCS prior to the improvement of the cost model. ⅱ) then we proposed improve the cost model considering integration with newly proposed NCS model for knowledge information construction job. In order to ensure the validity of the application of NCS development and cost estimation model, the experts reviewed relevant contents and made plans for improvement by using experts from supply and demand groups of various fields of national knowledge informatization projects.

Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects (아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안)

  • Woo, Kwang-Min;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.167-176
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

A study on economic analysis of new renewable energy power(photovoltaic, wind power, small hydro, biogas) (신재생에너지 발전(태양광, 풍력, 소수력, 바이오가스)의 경제성 분석 연구)

  • Kim, Chong-Min;Kim, Ki-Young
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.6
    • /
    • pp.70-77
    • /
    • 2008
  • The purpose of this study evaluates a feasibility and economical efficiency of new renewable energy. According as weather change is serious problem now days, every people make attention to the reduction of greenhouse gas. The revitalization of new renewable energy creates the variety of energy source, stability of energy supply and reduction of greenhouse gas. In this study evaluates a feasibility and economical efficiency from new renewable energy of various photo voltaics, wind power, small hydro and biogas. Feasibility does in standard of technical characteristic, politic support, marketability, establishment present condition and development aim. Economical efficiency does in standard of developmental unit cost, utilization factor, equipment life, politic support cost, interest ratio. The results of this study were as follows photo voltaics, wind, small hydropower, biogas in order feasibility is high. Developmental unit cost, utilization factor, equipment life, politic support cost and analyzed the relationship of interest ratio fluctuation and economical efficiency. From all new renewable energy the utilization factor most is important in economical efficiency but necessary utilization factor is difficult because environmental problem.

Optimizing Fat Grafting Using a Hydraulic System Technique for Fat Processing: A Time and Cost Analysis

  • Verdura, Vincenzo;Guastafierro, Antonio;Di Pace, Bruno;Faenza, Mario;Nicoletti, Giovanni Francesco;Rubino, Corrado
    • Archives of Plastic Surgery
    • /
    • v.49 no.2
    • /
    • pp.266-274
    • /
    • 2022
  • Background Many authors have researched ways to optimize fat grafting by looking for a technique that offers safe and long-term fat survival rate. To date, there is no standardized protocol. We designed a "hydraulic system technique" optimizing the relationship among the quantity of injected fat, operative time, and material cost to establish fat volume cutoffs for a single procedure. Methods Thirty-six patients underwent fat grafting surgery and were organized into three groups according to material used: standard, "1-track," and "2-tracks" systems. The amount of harvested and grafted fat as well as material used for each procedure was collected. Operating times were recorded and statistical analysis was performed to establish the relationship with the amount of treated fat. Results In 15 cases the standard system was used (mean treated fat 72 [30-100] mL, mean cost 4.23 ± 0.27 euros), in 11 cases the "1-track" system (mean treated fat 183.3 [120-280] mL, mean cost 7.63 ± 0.6 euros), and in 10 cases the "2-tracks" one (mean treated fat 311[220-550] mL, mean cost 12.47 ± 1 euros). The mean time difference between the standard system and the "1-track" system is statistically significant starting from three fat syringes (90 mL) in 17.66 versus 6.87 minutes. The difference between the "1-track" system and "2-tracks" system becomes statistically significant from 240 mL of fat in 15 minutes ("1-track") versus 9.3 minutes for the "2-tracks" system. Conclusion Data analysis would indicate the use of the standard system, "1-track," and "2-tracks" to treat an amount of fat < 90 mL of fat, 90 ÷ 240 mL of fat, and ≥ 240 mL of fat, respectively.

Realization of Smart Greenhouse Cost Using Greenhouse Structural Code and Greenhouse Construction Estimate (온실구조기준 및 온실공사 품셈을 활용한 스마트 온실 단가 현실화 연구)

  • Lee, Chul-sung;Kim, Hyuk;Shin, Seung-wook;Park, Mi-lan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.2
    • /
    • pp.29-36
    • /
    • 2022
  • This study analyzed the effects of building and greenhouse structural code on the structural design and the greenhouse construction cost. The over-design possibility of greenhouse was analyzed when building structural code was applied using standard smart greenhouse drawings. The possibility of decrease in greenhouse construction cost was investigated if the currently applied building structural code was replaced with greenhouse structural code. As a result of comparing the member sizes with the standard drawings, building structural code was designed with 13%~74% more steel than greenhouse structural code. When building construction estimate was replaced with greenhouse construction estimate, it was possible to reduce the total construction cost of the glass greenhouse by 17% and that of the vinyl greenhouse by 14%. Since there is no standard construction estimate suitable for greenhouses, the wage unit price is set excessively, and the construction cost of the smart greenhouse is increasing. In conclusion, it is necessary to establish greenhouse structural code and greenhouse construction estimate to lower the greenhouse construction cost.

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

Development on Repair and Reinforcement Cost Model for Bridge Life-Cycle Maintenance Cost Analysis (교량 유지관리비용 분석을 위한 대표 보수보강 비용모델 개발)

  • Sun, Jong-Wan;Lee, Dong-Yeol;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.128-134
    • /
    • 2016
  • Estimating the repair and reinforcement (R&R) costs for each bridge member is essential for managing the life cycle of a bridge using a bridge management system (BMS). Representative members of a bridge were defined in this study, and detailed and representative R&R methods for each one were drawn in order to develop a systematic maintenance cost model that is applicable to the BMS. The unit cost for each detailed R&R method was established using the standard of estimate and historical cost data, and a systematic procedure is presented using an integration program to enable easy renewal of the R&R unit cost. Also, the average unit cost of the representative R&R methods was calculated in the form of a weighted average by considering the unit cost and application frequency of each detained R&R method. The appropriateness of the drawn average unit cost was reviewed by comparing and verifying it with the previous historical unit cost. The suggested average R&R unit cost can be used to review the validity of the required budget or the appropriateness of the R&R performance cost in the stage to establish the bridge maintenance plan. The results of this study are expected to improve the reliability of maintenance cost information and the rationality of decision making.

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF