Identification of Primary Activity and Management Plan for Construction Standard Unit Price (건설공사 표준시장단가 핵심공종 도출 및 중점관리방안)

  • Jin, Zheng-Xun;Baek, Seung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.589-601
    • /
    • 2020
  • The Construction Standard Unit Price (CSUP) sets the standard for calculating the estimated construction cost. The CSUP is used as basic data for preparing a standard price for public construction. Currently, the CSUP is calculated in consideration of the market and construction field conditions. However, a long-term management plan was established to prepare revised standards. As part of the plan, a field survey was conducted on changes in construction conditions and market prices. However, the plan continued for more than 5 years. Thus, the plan has a problem of difficulty continuously managing primary activities that have high importance and high price volatility. Therefore, to efficiently manage the CSUP, this study identifies the primary activities of the CSUP and presents a management plan. Through importance analysis and unit price volatility analysis, 242 primary activities in 35 activity groups were identified. Also, a management plan is presented based on the importance levels of activities. The primary activities and management plan could enable the timely revision of important activities. The results of this study provide a base for reflecting the appropriateness of construction cost criteria on time.

Basic Research for Construction Standard Unit Price and BIM library Linkage (표준시장단가 및 BIM 라이브러리 연계 활용에 관한 기초연구)

  • Jin, Zheng-xun;Baek, Seung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.251-252
    • /
    • 2021
  • With the recent emergence of the 4th Industrial Revolution, the government is promoting the development of smart construction technology and institutional improvement through various policies to induce cutting-edge and technological innovation in the construction industry. As part of such smart construction technology, the application of BIM is being activated, and related regulations and guidelines are constantly being supplemented. In relation to BIM, there are many studies on the fields of library, design standards etc., but research on specific unit price utilization and unit price DB construction for calculating construction cost is insufficient. Therefore, in this study, a basic study was conducted on the linkage of the construction standard market unit price and the BIM library. Based on the basic research conducted in the future, we intend to establish specific standards for calculating BIM-based construction costs.

  • PDF

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

An Empirical Study on the Cost Behavior in Coastal Fishery (연안어선어업 피해율 산정을 위한 원가행태에 관한 실증연구)

  • Kim, Woo-Soo;Kim, Kil-Yong
    • The Journal of Fisheries Business Administration
    • /
    • v.42 no.3
    • /
    • pp.1-13
    • /
    • 2011
  • It is necessary to set up a standard of estimation for annual unit price of sale and cost, damage rate for calculating compensation against fishery damage objectively. Two items on the unit price and cost have regulations but the damage rate has not, so it may occurred some problems such as reasonability and balance because the estimation should be handling by an appraiser's knowledge and experience. This study has analyzed using Regression model and searched variable costs and fixed costs about each items appraisers to operate in the present. It is compare profit damage index is calculated by an estimated model and an appraised example. This analysis showed highly 23-30% estimated model more than appraised example. It means the overestimation for fishery damage. This difference has caused by limited data, lack of sample, much difference in the standard deviation, and has not classified each kind of business and weight of coastal fishery, the overestimation more than what expected. This study has analyzed that the applied rate of fixed and variable cost in relation to the compensation in the cost of coastal fishery is very valuable.

A Study on the optimum scale of the number of beds of both the standard and the high-class (기준병상수와 상급병상수의 적정규모에 관한 연구)

  • Back, Seung-Joon;Yu, Seung-Hum;Sohn, Tae-Yong
    • Korea Journal of Hospital Management
    • /
    • v.6 no.3
    • /
    • pp.109-129
    • /
    • 2001
  • The purpose of this study was the acquisition of the optimum scale of the apportionment of standard & high-class bed for the maximum profit representative of the desire of customers in a General Hospital with 1,100 beds located in Seoul. This investigation was proceeded by the analysis of the result of the simulation with the survey of both the patients' needs for bed and the degree of the medical service by the grade of the ward. And finally the consequence was obtained as follows: 1. The result of the investigation of the inpatients' preference for the grade of ward classes shows that a private ward reflected 4.3 percent, a semi-private ward 1.7 percent, a three-bed ward 0.1 percent, and a ward with six beds 93.9 percent each other. 2. A questionnaire poll was paralleled of service terms of a medical doctor and a nurse by ward class, the data were used for the standard of the allotment of labor cost by the ward class. The poll shows that the service tenn of a medical doctor and a nurse based on a ward with six beds by ward class showed 1.7 times in internal medicine and 1.9 times in surgery at a private ward; 1.4 times in internal medicine and 1.7 times in surgery at a semi-private room; and 1.2 times both in internal medicine and in surgery at a three-bed ward 3. The resultant findings revealed the most profit per bed and per patient in a private ward. However, an analysis of profit with a standard of unit area by ward class represented a higher profit in both the internal medicine and the surgery semi-private ward than other ward classes. 4. The result of the analysis through simulation based on the data of the prime cost per the ward class proved the optimum scale of the distribution of beds by class as follows: sixteen beds of the internal medicine and twenty three beds of the surgery in the private ward; two hundreds and two of the internal medicine and one hundred and ninety eight of the surgery in the semi-private room; three of both the internal medicine and the surgery each other in the three-bed ward; one hundred and ninety eight of the internal medicine and two hundred and fifty two of the surgery in the ward with six beds. The result of this research exhibits that the income and expenditure of the hospital could be improved by changing parts of wards into private ones(containing the maximum profit per a unit of width) in case the scale of the number of beds is reset with the consideration of the profit per the unit width. In the near future it's strongly expected that the research for the more scientific standard of the allotment of labour cost by ward class and for definition of the optimum scale of the number of beds that actualize the maximum profit with the change of the three elements of the prime cost: cost of materials; labor costs; management expenses.

  • PDF

Proper Estimating Method for Environmental Preservation Cost in Road Projects (도로공사 환경보전비의 적정 산출 방안)

  • Park, Ji-Sun;Lee, Sea-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.3-10
    • /
    • 2012
  • The current enforcement regulation of "Construction Technology Management Act" prescribes calculation standard of environmental preservation cost in construction site. According to this standard, environmental preservation cost is calculated by using the quantity-per-unit costing method or applied fixed rate on direct cost. However, when calculated by using the quantity-per-unit costing method it is few items to put in the budget according to standard of construction estimate and in the case of using the fixed rate on direct cost it is not considering various characteristics of the construction site. Therefore, it is needed a improvement plan of estimating method and management system for environmental preservation cost. In this study, it surveyed the actual state of the environmental preservation cost according to magnitude of project, site location, anti-pollution facilities and etc. over 38 road projects. The research reported in this paper environmental preservation cost was variously distributed over construction sites. Thus it needs to estimating method and management system to consider characteristics of construction site for environmental preservation cost.

Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

A Proposal of Modeling Guide of the Unit Space-based Preliminary Cost Estimation in Urban Renewal Mix-Used Development - Case Study on ○○ Transfer Station Complex - (복합용도 개발 도시재생 사업에서의 단위 공간 기반 개산견적 모델링 가이드 제안 - ○○시 ○○역 복합환승센터 사례를 중심으로 -)

  • Kang, Shin-Yeop;Ahn, Jae-Hong;Kim, Ju-Hyung
    • Journal of KIBIM
    • /
    • v.3 no.1
    • /
    • pp.11-20
    • /
    • 2013
  • Mix-used development in urban renewal project is done to effectively utilize the limited downtown. Generally unlike a single project, It features placing a large number of different facilities(residential, commercial, business, cultural, etc.) which is each other organically linked. The purpose of this study is to suggest the method of modeling guide for 3D preliminary cost estimation considering visual and intuitive judgement of space in mix-used development Urban Renewal project. In this research, introducing SME(Standard Module and Element) breakdown structure, FID(Finish Identity) for estimating building space unit-based quantity take off was implemented. It could narrow the discrepancy of opinion between the stakeholders with more accurate cost-estimates, comparing to the traditional methods.

A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees (도시 가로수 관리 품셈 개선에 관한 연구)

  • Do, Yoon-Taek;Han, Bong-Ho;Park, Seok-Cheol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.20-36
    • /
    • 2022
  • This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.

An Analysis on the Labor Change Factor for Site Selection in Enactment and/or Revision of Construction Standard Production Unit (표준품셈 제·개정에 있어 실사현장 선정을 위한 품 변화요인 분석)

  • Shin, Won-Sang;Kim, Yong-Woo;Lee, Dong-Eun;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.11-12
    • /
    • 2011
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is difficult to reflect the various site attributed variation in productivity using existing CSPU. The reason is that a criteria which site should be selection for enactment and/or revision of CSPU is not established. This study aims to provide essential data to be used for analyzing the labor factors in a way to secure efficiency and reliability of CSPU.

  • PDF