국제프랜차이즈계약의 표준조항과 불공정거래행위 (A Study on the Standard Provisions of International Franchising Contracts and Unfair Trade Acts)

  • 서정두
    • 한국중재학회지:중재연구
    • /
    • 제22권3호
    • /
    • pp.165-185
    • /
    • 2012
  • Franchising has proved over many years to be a successful commercial vehicle for the international distribution of products and services. However, there has long been missing a user-friendly model contract that would reflect the diversity of international franchising contracts. Because the ICC has drafted a model form of international franchising contracts, taking into account the most commonly encountered clauses in franchising agreements, their model could be used as a checklist of the core obligations of a cross-border franchise contract. Because there is no internationally agreed-upon uniform legislation on franchising, parties must rely on national laws and regulations applicable to the international franchise (when such laws and regulations exist) and should therefore very carefully draft stipulations for the legal status of the contract. This study has been intended to cite some provisions for striking a fair balance between the interests of the franchisor and those of the franchisee and for avoiding unfair trade acts in international franchising contracts.

  • PDF

매수인의 부적합 통지 내용의 상세정도에 관한 연구 (A Study on the Buyer's Specificity Requirement of the nature of the lack of the Conformity)

  • 허광욱
    • 무역상무연구
    • /
    • 제39권
    • /
    • pp.27-55
    • /
    • 2008
  • The concept of non-conformity is stipulated at Art. 35, CISG. According to the Art. 35, there is no directly stipulated concept of non-conformity. But Art. 35 said that the Seller must deliver goods which are of the quantity, quality and description required by the contract and which are contained or packaged in the manner required by the contract. Accordingly, the concept of non-conformity contains the conformity of quality, quantity, description, delivery of different goods and documents. Art. 39 does not specify the form of notice required. So parties can require a particular form by agreement. If there is no agreed form of notice, buyer' s notice must be sent by means appropriate in the circumstances. And Art. 39 states that the required notice of lack of conformity must be given to the seller. Notice of defects conveyed by the buyer to an independent third party is not found to have been given by means appropriate in the circumstances. And Art. 39 is subject to the parties' power under Art. 6 to derogate from or vary the effect of any provision of the Convention. When determining which requirement must be satisfied by the buyer is specifying the nature of any lack of conformity, a mixed objective-subjective standard should be applied, which has regard to the respective commercial situation of the buyer and the seller, to any cultural differences, but above all, to the nature of the goods. Also to determine the specificity requirement is to satisfy the purpose of notice of lack of conformity.

  • PDF

한방병원의 침도 시술 동의서의 현황 조사와 델파이 기법을 활용한 표준 시술 동의서 개발 (Current Status of Informed Consent Form for Acupotomy in Korean Medicine Hospitals and Development of a Standard Informed Consent Form Using Delphi Method)

  • 김지훈;구본혁;김형준;서경숙;오명진;유명석;윤상훈;이광호;이현종;임정태;전형선;정인숙;최성운;이태욱;김연학;오유나;김건형;양기영;김은석
    • 대한한의학회지
    • /
    • 제45권1호
    • /
    • pp.182-201
    • /
    • 2024
  • Objectives: This study was conducted to develop a standard acupotomy consent form that takes into account the unique characteristics of Korean Medicine. The study was motivated by the increasing importance of patient autonomy and the growing number of legal disputes related to medical malpractice in the clinical field of Korean Medicine. Methods: The analysis phase of the study involved a survey of the current status of acupotomy consent forms in Korean Medicine hospitals nationwide. The items of each form were analyzed based on the contents of the Medical law and the standard contract for medical procedures of the Fair Trade Commission (FTC). In the development and evaluation phase, the items and contents of the acupotomy consent form were evaluated using a 5-point Likert scale and content validity was assessed through two rounds of Delphi surveys. In the improvement phase, the contents of the consent form were revised based on the results of a survey of inpatient and outpatient patients in the Department of Acupuncture and Moxibustion at Pusan National University Korean Medicine Hospital, and real-time online meeting. The final version of the standard acupotomy consent form was completed after undergoing proofreading and corrections by a linguistics expert. Results: Only 30% of Korean Medicine hospitals have implemented acupotomy consent forms. The items of the consent forms did not fully include the items presented in the Medical act and the standard contract for medical procedures of the FTC. To address this issue, two rounds of Delphi surveys and a real-time discussion were conducted with a panel of 12 experts on 27 preliminary items of consent forms. The items and contents that met the criteria for content validity ratio, convergence, and consensus were derived. Based on the derived items and content, a standard acupotomy consent form was developed. Conclusions: The standard consent form for acupotomy is anticipated to ensure patient autonomy and enhance transparency and liability in acupotomy. Furthermore, it is expected to serve as evidence in case of medical disputes related to acupotomy and contribute as a reference document for the development of standard consents forms for various procedures of Korean Medicine. However, the limitations of the study include that the survey of consent forms was limited to only training hospitals of Korean Medicine, and the standard consent form is only applicable to adults in Korea. Future studies are needed to address these limitations.

지하철 콘크리트 BOX구조물의 내구성설계에 대한 연구 (A Study of Durability Design in the Subway Concrete Box Structure)

  • 권영찬;김은겸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.940-956
    • /
    • 2004
  • In the course of studying the design of securing the 100-year-long durability of 100 years the subway structure according to the requested service by the Seoul Metropolitan Subway Construction Headquarters, we analyzed 14 construction sites adopting the durability design in subway line No. 9 and concluded as follows: 1. When comparing with 158, the environment index presented for securing 100-year-long durability of subway structure in subway line No. 9, the index of durability was verified as 159.7$\~$179.8 2. When examining the increase value of durability index, we verified that the constructors didn't make various choices in method but they employed the uniformly selected system. 3. Under consideration of the bid form, the construction under bid contract in bulk gave the impacts on the construction cost with attention to selection of the durability index, while the construction under alternative contract in bid adopted uniformly the standard presented by the ordering party.

  • PDF

국제기술협력을 위한 전문기술사의 새 역할촉진방안 (A Reinforcement Proposal of quite new roles by Professional Engineer for International Technology Collaboration)

  • 김순근
    • 기술사
    • /
    • 제15권2호
    • /
    • pp.52-59
    • /
    • 1982
  • This is to intent of the reinforcement proposal for current P.E., qualification code in necessity of improving the foreign technology inducement & technology export between advanced Country and developing or undeveloping Country as Technological Cooperation for mutual benefit. A prosal contains internationally recogniyed general term & conditions of Standard Contract form for Engineering jobs, construction works includings of plant exportation as for additional new basic knowledge for roling of business promotion & finalization in urging of more current jobs internationally to be increment of technological cooperation.

  • PDF

건설 사업에서 FIDIC 규정의 분쟁해결 방법 (The Dispute Resolution Method on The FIDIC Form of Construction Projects)

  • 이무종
    • 한국중재학회지:중재연구
    • /
    • 제16권2호
    • /
    • pp.239-264
    • /
    • 2006
  • Globalization of business activities and the market is making intern ational movement of capital much freer. Therefore the introduction of global standard is inevitable. Each and every country has had its own standard which restrain free exchange and cause misunderstanding and conflict between countries. A country or a company which is not capable of meeting the global standard can not be accepted in the global market. Consequently, it will eventually be left behind. It is right to say that countries and companies should accept the global standard and abide by it to survive in the competitive global market. The following preface which was introduced in the international conference co_organised by BAC, FTCTC and Tsinghua University in May, 2004 shows a timely movement for the globalization of construction business. *B A C, Beijing Arbitration Commission *FTCTC, The FIDIC-Tsinghua-CNAEC Training Center *CNAEC, China National Association of Engineering Consultants Introduction, As arbitration becomes more and more popular in the ways of alternative disputes resolution all over the world, the BAC is devoted to promoting international arbitration in China. As FIDIC contracts constitute an accepted point of reference for international construction contract, the BAC, characteristic of construction projects, is willing to facilitate the FIDIC contracts as the referred construction contracts in China. In order to carry out its purposes, the BAC, together with FTCTC is going to convene for discussion of dispute resolution and arbitration of international construction projects. FIDIC, construction contract management guide, explains arbitration as the ultimate dispute resolution method. The detail of FIDIC will be suggested in this essay.

  • PDF

아시아 지역 영연방국가의 지정하도급(NSC)제도에 관한 비교 연구 - 표준계약약관의 지정하도급자 항목분석을 중심으로 - (A Comparative Study on the Nominated Subcontractor (NSC) System of Building Construction Project in Asian Commonwealth of Nations - Focused on the NSC Clause Analysis of Standard Contract Forms -)

  • 조재용;김정곤;박형근
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.12-22
    • /
    • 2014
  • 최근 국내 건설시장의 축소와 수주경쟁의 심화로 인하여 많은 건설기업들이 이에 대한 대안으로써 해외건설 시장에 진출하고 있다. 그러나 해외건설 프로젝트에서는 국내 건설 프로젝트와 책임과 권한의 범위가 다른 다양한 프로젝트 주체가 참여하고 있으며, 프로젝트를 둘러싼 수행환경 및 계약관행이 국내 건설 프로젝트와 다르기 때문에 다양한 리스크 요인이 존재하고 있다. 특히 해외건설 프로젝트의 문제가운데 하나가 Nominated Sub-Contracting (NSC)로 알려진 영국과 영국연방국가에서 사용되어지고 있는 하도급계약이다. 본 논문은 영국과 아시아지역 영연방 국가의 JCT약관, SIA약관, HKIA약관, PAM약관의 비교를 통해 NSC제도와 차이점을 소개한다. 또한 NSC계약의 채용 거부와 계약 해지와 관련된 약관항목분석을 통해 NSC제도의 유형을 분류한다.

경호경비계약의 법적 구조 및 분쟁의 예방과 해결 방안 (The Legal Structure of Guard & Security Contract and the Prevention & Resolution Method of Security Disputes)

  • 안성조
    • 시큐리티연구
    • /
    • 제11호
    • /
    • pp.129-157
    • /
    • 2006
  • 급속한 사회변화와 함께 사회적 위험요소가 고조되면서 이에 대한 안전문제가 크게 대두되고 있다. 이에 안전욕구의 증대에 따라 위험에 대비하는 치안서비스를 제공하는 민간경호경비에 대한 수요도 증가하고 이에 따른 경호경비업도 발달하고 있다 이에 본고에서는 경호경비계약에 대한 법률 구조를 파악하여 경호경비업자와 의뢰자 사이에 발생 가능한 분쟁을 예방하거나 해결하기 위하여 계약의 성립과 그에 따르는 문제점을 분석하고자 한다. 특히 경호경비관계에 따르는 분쟁을 최소화하기 위하여 경호경비 계약을 체결하여 그 합의내용을 명확히 문서화하는 것이 필요하다. 여기에서 본고에서는 각 당사자간에 자율적으로 체결하는 경호경비계약조건을 표준화하는 방안 중에서 분쟁해결조항의 표준모델을 제시 하고자 한다. 특히 당사자 간 사법상의 분쟁을 해결하는 효과적인 방법으로 합의에 의한 방법이 최선이겠으나, 불가피한 경우에 재판에 의한 소송에 의한 해결보다는 중재를 통한 해결 방안을 권고한다. 당사자가 중재로 분쟁을 해결하기 위해서는 경호경비 계약서에 중재조항을 삽입하여 체결해야 한다. 실제 경호경비업계에서 이데 대한 적용성 시험 및 평가를 거쳐서 이를 경호경비 표준계약서로 제정하여 업계 전반에 확대 적용을 추진하고자 한다.

  • PDF

정기용선계약상 이행불능에 관한 Sea Angel호 사건의 판례 분석 (An Analysis of Case on Frustration under Time Charter in the Sea Angel)

  • 한낙현
    • 무역상무연구
    • /
    • 제39권
    • /
    • pp.251-280
    • /
    • 2008
  • A party to the charter will not be able to rely upon the doctrine of frustration if an event which makes further performance impossible has been caused by his breach of the charter. Strictly speaking, this is not a situation of frustration at all but rather a case of discharge of the contract by breach. In the Sea Angel case, the defendant entered into a Lloyd's Standard Form of Salvage Agreement with owners of the casualty on the LOF 2000 form, incorporating the SCOPIC clause. The time charter was on the terms of the Shelltime 4 form. This case the trial of the action brought by the claimants owners of the vessel Sea Angel claiming outstanding hire from the defendant charterers. This Case was issued whether charterparty frustrated by refusal of port authorities to issue "No Demand Certificate" allowing port clearance pending payment of oil spillage clean-up costs. The court concluded that no attempt had yet been made to invoke the assistance of the Pakistani court to obtain the release of the vessel. There was not so radical or fundamental a change in the obligation assumed by defendant as to establish frustration. The purpose of this study aims to analyse frustration and time charter in the Sea Angel case.

  • PDF

해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법 (Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects)

  • 이황구;신동우;김경래;차희성;김영재
    • 한국건설관리학회논문집
    • /
    • 제18권6호
    • /
    • pp.65-77
    • /
    • 2017
  • 최근 대형 건설회사의 해외시장 비중 확대와 함께 해외 프로젝트에서의 공기지연에 따른 경영 손실에 대한 이슈가 지속적으로 제기되고 있다. 일반적으로 대형 프로젝트의 수행 과정에서 변경은 필연적으로 발생한다. 대부분의 변경은 공기지연과 연결되기 때문에 변경으로 인하여 공기연장이 필요한 경우 건설사는 계약에서 정한 기준에 따라 공기지연을 관리해야 공기지연에 따른 리스크에 효과적으로 대응할 수 있다. 공기지연을 유발하는 변경에 대한 계약적 대응이 부족할 경우 클레임이 해결되지 않고 분쟁으로 확대되는 경우가 많다. 프로젝트 초기 단계에 계약에서 요구하는 공기지연 관리 절차와 방법을 분석하는 것이 중요하나 이에 대한 방법 및 도구를 제시하지 못하고 있었다. 본 논문에서는 국내 주요 건설사들의 공정관리 실무 및 해외 공사에서의 클레임 및 분쟁사례에 대한 고찰을 통해 문제를 제시하고 해외 건설 계약조건상에 포함된 공기지연 관리 리스크를 평가할 수 있는 방법을 제시하였다. 공기지연의 합리적 대응과 관련된 계약조건상의 리스크 평가 틀을 제시하기 위하여 FIDIC Red Book(1999), PSSCOC(2014) 및 SIA 9th Edition(2010) 등 국제 표준 계약조건 뿐만 아니라 ARAMCO 및 QP를 포함한 해외 대형 발주자의 표준계약조건에 나타나 있는 공기지연 관리 요건 및 수준을 검토하여 전체 7개 영역, 62개 항목으로 구성된 계약조건 리스크 평가모델을 제안하였다. 계약조건 리스크 평가 모델은 계약조건상의 공기지연리스크 확인을 위한 구조적 틀을 제공하며 개별 리스크 항목별 표준적인 수준을 제시함으로써 해당 프로젝트의 리스크 수준을 확인하고 이에 효과적으로 대응할 수 있는 단초를 제공한다. 제안된 모델의 유효성 검증을 위하여 실제 제안한 모델을 실제 프로젝트에 적용하여 그 효과를 입증하였다.