Drilling and blasting method for excavating rock mass is generally used in underground construction; but this technique has some shortcomings. For instance, rock mass damage is inevitable during drilling and blasting, and blast-induced vibration frequently causes some problems. Until now, field measurement method is used to predict the overbreak and vibration; but it has many limitations. Therefore, numerical analysis method is needed to overcome such limitations, and to estimate and predict damage and vibration due to tunnel blasting in the design stage. In this study, damage zone of rock mass due to stoping and contour blasting is compared based on standard tunnel blasting pattern, and the propriety of the standard tunnel blasting pattern is estimated. Then, blasting pattern is optimized so that the damage zone due to sloping blasting with reduced charge is consistent with that due to contour blasting.
우리나라는 산악지역이 70%이산 분포되어 있는 지형적 특성으로 인하여 굴착작업 시 발파작업은 필수사항으로 되어있으며, 발파작업이 이루어지는 곳에는 발파진동 소음으로 인한 민원이 부수적으로 발생하고 있다. 발파작업을 위해 경제성과 안정성, 시공성에 따라 발파패턴이 선정되어진다. 하지만 민원의 해결을 위한 공법의 무절제한 변경 등이 이루어지고 있는 일들이 발생되는 경우가 빈번하여 이를 방지하기 위해 국토해양부는 설계 및 시공에 대한 표준발파공법을 제시하였다. 그러나 국토해양부표준발파공법(2006년)은 암종에 상관없이 일괄적인 발파패턴으로 설계되어 있으므로 셰일암반 등과 같이 낮은 강도의 암반, 절리가 많이 포함되어 있는 암반에 적용한다고 할 때에 이들 암반의 특성이 고려되지 않은 상태에서 일괄적인 장약량 등의 발파제원에 따라서 경제적인 손실이 생길 수 있다고 생각되어진다. 따라서 이와 같은 셰일 및 응회암반에서 현지암반의 특성을 고려하여 공간격과 저항선의 길이를 조정한 발파제원을 적용하여 시험발파를 수행하여 어느 정도의 경제성 증대 가능성의 결과를 도출하였다. 이를 시작으로 좀더 많은 사례를 통한 정량적 결과를 도출하여 설계 및 시공에 적용한다면 경제성 향상을 기대할 수 있을 것이라 사료되어진다.
In tunnel blasting, rock damage and overbreak at excavation limits are strongly related to stability of the tunnel and cost for rock support, and also affect to maintenance after tunnel construction. In this study, many field tests and measurements have been carried out in highway tunnels so that discordance between blast design and practical production blasting could be settled and actual methods of over break control could be proposed through the understanding of the problems in existing blasting patterns. Test blasting in tunnel was carried out many times in two tunnel sites. Also, long hole blasting longer than existing blasting pattern was executed for good grade of rock mass whose RMR value is more than 60. Using the results of test blasting, new standard blasting patterns for two lane tunnel were proposed. As a result of profile measurement after blasting, drilling is a major factor of overbreak. And then the methods for minimizing overbreak were adapted in new blasting patterns.
국내의 경우 일반적인 2차로 도로터널은 시공경험 및 축적된 제반자료가 풍부하여 표준적인 지보패턴이 제시되고 있으나, 2-Arch 도로터널의 경우 아직 시공경험 및 계측자료가 부족하여 특정지형 및 암질에 대해 별도의 발파설계와 해석을 통해 선정한 지보패턴을 표준적으로 적용하고 있다. 따라서 본 연구에서는 2-Arch 도로터널의 설계 및 시공시 적용되고 있는 표준지보패턴에 대하여 하중분담률 및 편토압에 따른 거동을 분석하고 발파진동이 중앙벽체에 미치는 영향을 분석하여 적용된 지보재의 적정성 여부를 검토하였다. 그 결과 표준지보패턴에 적용되는 지보량은 적정한 것으로 나타났으나, 이는 특정지형 및 암질 조건을 고려하여 해석 후 선정된 것으로, 향후 2-Arch 도로터널의 설계 및 시공시 최종적인 표준지보패턴 선정은 대상 터널의 지형조건, 토질조건, 시공조건 등을 종합적으로 고려하여 결정되어야 할 것으로 사료된다.
암반층이 얕은 깊이에서 출현하는 국내 지층 조건과 지하 공간의 활용도 증가로 인해서, 발파에 의한 굴착은 여전히 이용되고 있다. 발파 천공 이후에 존재하는 물이 있는 조건에서 실시되는 표준 발파는 폭굉압력 감소, 일정 장약량 사용, 디커플링과 같은 기술적인 어려움이 있다. 하지만, 기존의 표준 발파 공법을 대체할 만한 공법이 없는 실정이다. 본 논문에서는 건공화 펌프 시스템을 이용하여, 천공 내부에 존재하는 물을 제거하는 건공화 ANFO (Ammonium Nitrate Fuel Oil) 발파와 발파 성능의 비교를 위해서 추가적으로 표준 발파를 수행하였다. 각각의 발파 공법에서 계측된 진동 속도 데이터들과 환산거리의 함수로 이루어진 경험적인 발파진동 추정식을 이용하여, 최소제곱법에 의한 선형회귀분석을 실시하고, 궁극적으로 발파 성능을 정량적으로 분석하였다. 그 결과, 건공화 ANFO 발파에서 진동 감쇠가 더 크게 발생하고, 암반 파쇄에 더 많은 에너지를 소비하여, 더 가까운 거리에서 진동 허용 기준을 만족하는 진동 속도를 보였다. 또한, 표준 발파의 발파 진동 영향권이 건공화 ANFO 발파보다 더 멀리 있고, 발파 패턴의 범위가 더 넓은 것으로 나타났다. 본 연구에서 수행된 현장 발파 실험 결과로부터, 건공화 ANFO 발파 공법의 발파 성능이 효율적임을 확인하였다.
대규모 건설공사 현장에서는 발파공사에 대한 표준발파패턴과 시험발파패턴의 발파진동추정식의 상이에 따른 설계변경의 반영 문제로 시공사, 건설사업관리자, 발주처간의 갈등요인을 해소하기 위한 체계적인 자료의 수집 및 분석 과정을 통하여 효율적인 대책수립이 필요한 실정이다. 발파진동에 의한 인접 구조물에 미치는 영향을 여러 각도로 평가하려는 연구들은 계속 되어 왔으나, 노천발파를 수행하면서 현장계측의 진동파형을 분석하여 인접 건축물의 안전성을 확보하고 현장여건에 적합한 발파공법을 연구한 사례는 미미한 실정이다. 따라서 현장여건에 적합하고 경제적이며 효율적인 발파작업을 수행할 수 있도록 시험발파를 통하여 발파패턴 선정의 개선방안을 제시하는 것이 필요하다. 본 연구에서는 실제 도로확장공사 현장에서 시험발파를 통한 표준발파공법 및 진동규제기준별로 적용되는 이격 거리를 기준으로 노천 발파작업을 수행하여 발파진동 값을 계측하고 이를 통한 발파공법별 진동예측식을 회귀분석 전산프로그램을 이용하여 신뢰수준 95%의 K, n, R등을 산출하였다. 시험발파 대상지역의 발파허용진동기준을 0.3cm/sec로 설정하고 노천발파지침의 발파진동추정식과 시험발파의 발파진동추정식에 따른 이격 거리별 장약량과 발파공법을 비교분석한 결과 사업비가 증가하는 요인을 도출할 수 있었다. 또한, 노천발파 작업 중 인접 구조물에 대한 계측 및 분석을 수행하고 노천발파지점과 가장 인접한 구조물을 선정하여 발파진동 계측 및 평가를 시행하여 노천발파공사를 완료하는 과정에서 나타난 노천발파 설계 시공 지침에서의 시험발파 절차 및 해석방법에 대한 문제점을 분석하여 개선방안을 제시하였다.
If slope height was more than 20 meters, we conducted an analysis of stereographic projection and limit equilibrium at this slope. We proposed reduction of slope face angle and reinforcement of rock bolt depending on analysis. Blasting design : Standard pattern based on result of local test blasting was made for blasting design. Vibration criterion was set for less than 3.0mm/s because of outworn buildings and inhabitants opinions. Production blasting and Controlled blasting has been done as Construction standard pattern. After Vibration Monitoring has been done, so that we can control of complement. "Bidding Document" and AASHTO 2001 "A Policy on Geometric Design of Highways and Streets" were so for design criteria of earthwork but they were different actual design criteria and left something to be desired in Afghanistan. Therefore, although "Bidding Document" and "AASHTO 2001" were basic design criteria, domestic design criteria was reflected in this design criteria for complement by discussion with supervisor. Drainage design : For stability ratio, ditch of arch block and stonework was designed by rainfall data for the 13 years and discussion with supervisor. Pavement was designed as flexible pavement. Because these days in Afghanistan postwar repair works, especially urgent repairing of roads and newly making of roads, are very highly in progress, I think that Afghanistan is the region about which our construction technical experts should have great concerns.
On the Seoul Metropolitan Subway Construction of No. 3, 4 Line, the total length is 57 Km and it is now undergoing almost 55% progress. The working method is classified into Open Cut of 70% and the rest of 30% tunnelling method in the 48 job site. Above tunnelling method is execute by American Steel Support System and the rest of 10 job site carried out by New Austria Tunnelling Method. This paper describes Blasting Standardizations works on the above Tunnelling ' Open Cut Method under big slogan, first safety, second execution. As a superintendent, I strived standardization of works with Better powder, Better Drills ' Better Pattern. Geological structure of Seoul area is composed by Jurassic Granite and also the above rockgroup are over burden by Alluviums as a Unconformity. First of all, I carried out the standard amount of powder and burden through experimental standard blasting by each powder as following Blasting works in the subway construction is surrounding shop Building, under pass the city river and also under pass highest building basement floor. I made allowable Blasting Vibration Value by West-Germany Vornorm DIN 4150, Teil 3 and should measure each blasting works as fellows all of powder is used basically Low-Gravity and Low Velocity such as Slurry, Ammonium Nitrate ' Finex I, II. for Smooth Blasting Instead of Gelatin Dynamite. Electric Detonation Cap is used basically M/S Delay Cup instead of Electric delay ' Simultaneous cap. I applied following formula V=KW3/4 $D^{-2}$ V=Particle Velocity (Cm/sec) K=Ginh Huh's Value W=Delay Charge (Kg) D=Distance(m) In the Open Cut, within 1m distance from H-pile I made to use the Concrete breaker, as following V=7W/$^{0.5}$V/$^{-1.75}$ On the Concentrate Building area, I advise to use Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.e Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.
This study has analysed actual overbreak, shotcrete rebound and the ratio between the actual quantity of shotcrete to designed shotcrete measured during a NATM tunnel construction. The measured shotcrete rebound was about 7.2% in average which was about half the allowable rebound (15%), showing shotcrete spraying was performed well. Based on the measurement of excavated tunnel shape, average overbreak was about 28.5cm after tunnel excavation by drill and blasting method. This was about 260% of allowable overbreak. In addition, due to the rebound and overbreak actual amount of shotcrete used in the tunnelling work was about 116.5 % of the designed value. According to the field measurement the ratio of actual shotcrete to designed value showed some relation with standard support pattern, but the size of overbreak did not show the correlation with standard support pattern. Hence current design specifications stating the size of overbreak based entirely on standard support pattern should perhaps be reestablished. The insight into the design guideline regarding overbreak and shotcrete.
본 연구에서는 미진동파쇄기를 이용한 알반파쇄굴착공법의 기준 진동식과 암 분류에 따른 비장약량 산출식을 도출하였고 기존의 파쇄임도비율 산출식을 미진동파쇄기에 적합하도록 변환하였다. 그리고 표준암반파쇄패턴과 실시설계에 적용할 수 있는 공당장약량을 결정하였다 그 결과 자승근 환산식은 $V=345.39(D/\sqrt{W})^{-1.4484$, 비장약량 산출식은 $W_f=(2.3\~2.5)\;f_agdV$, 실시설계에 적용할 수 있는 공당장약량은 0.54kg, 직경 30cm의 파쇄입도비율은 약$48.7\%$로 산출되었다. 본 암반파쇄굴착공번은 타 공법에 비해 현장적 용성이 탁월한 것으로 사료된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.