터널발파의 수치해석적 모델링 (Numerical Modelling of Tunnel Blasting)

  • 이인모;최종원;김상균;김동현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술발표회 논문집
    • /
    • pp.133-140
    • /
    • 2000
  • Drilling and blasting method for excavating rock mass is generally used in underground construction; but this technique has some shortcomings. For instance, rock mass damage is inevitable during drilling and blasting, and blast-induced vibration frequently causes some problems. Until now, field measurement method is used to predict the overbreak and vibration; but it has many limitations. Therefore, numerical analysis method is needed to overcome such limitations, and to estimate and predict damage and vibration due to tunnel blasting in the design stage. In this study, damage zone of rock mass due to stoping and contour blasting is compared based on standard tunnel blasting pattern, and the propriety of the standard tunnel blasting pattern is estimated. Then, blasting pattern is optimized so that the damage zone due to sloping blasting with reduced charge is consistent with that due to contour blasting.

  • PDF

국토해양부 표준발파패턴의 셰일암반 적용성에 관한 사례 연구 (Review of Applicability of the Standard Blasting Patterns of MLTM to Various Rock Types)

  • 김세현
    • 화약ㆍ발파
    • /
    • 제27권1호
    • /
    • pp.47-52
    • /
    • 2009
  • 우리나라는 산악지역이 70%이산 분포되어 있는 지형적 특성으로 인하여 굴착작업 시 발파작업은 필수사항으로 되어있으며, 발파작업이 이루어지는 곳에는 발파진동 소음으로 인한 민원이 부수적으로 발생하고 있다. 발파작업을 위해 경제성과 안정성, 시공성에 따라 발파패턴이 선정되어진다. 하지만 민원의 해결을 위한 공법의 무절제한 변경 등이 이루어지고 있는 일들이 발생되는 경우가 빈번하여 이를 방지하기 위해 국토해양부는 설계 및 시공에 대한 표준발파공법을 제시하였다. 그러나 국토해양부표준발파공법(2006년)은 암종에 상관없이 일괄적인 발파패턴으로 설계되어 있으므로 셰일암반 등과 같이 낮은 강도의 암반, 절리가 많이 포함되어 있는 암반에 적용한다고 할 때에 이들 암반의 특성이 고려되지 않은 상태에서 일괄적인 장약량 등의 발파제원에 따라서 경제적인 손실이 생길 수 있다고 생각되어진다. 따라서 이와 같은 셰일 및 응회암반에서 현지암반의 특성을 고려하여 공간격과 저항선의 길이를 조정한 발파제원을 적용하여 시험발파를 수행하여 어느 정도의 경제성 증대 가능성의 결과를 도출하였다. 이를 시작으로 좀더 많은 사례를 통한 정량적 결과를 도출하여 설계 및 시공에 적용한다면 경제성 향상을 기대할 수 있을 것이라 사료되어진다.

고속도로 터널에 대한 전단면 발파 설계방안 연구 (Design guide for full-face blasting in highway tunnel)

  • 이상돈;최해문;이현구;류창하
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.930-937
    • /
    • 2004
  • In tunnel blasting, rock damage and overbreak at excavation limits are strongly related to stability of the tunnel and cost for rock support, and also affect to maintenance after tunnel construction. In this study, many field tests and measurements have been carried out in highway tunnels so that discordance between blast design and practical production blasting could be settled and actual methods of over break control could be proposed through the understanding of the problems in existing blasting patterns. Test blasting in tunnel was carried out many times in two tunnel sites. Also, long hole blasting longer than existing blasting pattern was executed for good grade of rock mass whose RMR value is more than 60. Using the results of test blasting, new standard blasting patterns for two lane tunnel were proposed. As a result of profile measurement after blasting, drilling is a major factor of overbreak. And then the methods for minimizing overbreak were adapted in new blasting patterns.

  • PDF

2-Arch 도로터널에 적용된 표준지보패턴의 적정성 검토 (A Evaluation of Standard Support Pattern for Two-Arch Road Tunnel)

  • 천병식;최광보;김혜양;유준희
    • 한국지반환경공학회 논문집
    • /
    • 제9권7호
    • /
    • pp.25-35
    • /
    • 2008
  • 국내의 경우 일반적인 2차로 도로터널은 시공경험 및 축적된 제반자료가 풍부하여 표준적인 지보패턴이 제시되고 있으나, 2-Arch 도로터널의 경우 아직 시공경험 및 계측자료가 부족하여 특정지형 및 암질에 대해 별도의 발파설계와 해석을 통해 선정한 지보패턴을 표준적으로 적용하고 있다. 따라서 본 연구에서는 2-Arch 도로터널의 설계 및 시공시 적용되고 있는 표준지보패턴에 대하여 하중분담률 및 편토압에 따른 거동을 분석하고 발파진동이 중앙벽체에 미치는 영향을 분석하여 적용된 지보재의 적정성 여부를 검토하였다. 그 결과 표준지보패턴에 적용되는 지보량은 적정한 것으로 나타났으나, 이는 특정지형 및 암질 조건을 고려하여 해석 후 선정된 것으로, 향후 2-Arch 도로터널의 설계 및 시공시 최종적인 표준지보패턴 선정은 대상 터널의 지형조건, 토질조건, 시공조건 등을 종합적으로 고려하여 결정되어야 할 것으로 사료된다.

  • PDF

건공화 공법의 발파 성능 평가를 위한 현장 시험에 관한 연구 (A Study of a Pilot Test for a Blasting Performance Evaluation Using a Dry Hole Charged with ANFO)

  • 이승훈;정성훈;최형빈
    • 대한토목학회논문집
    • /
    • 제42권2호
    • /
    • pp.197-208
    • /
    • 2022
  • 암반층이 얕은 깊이에서 출현하는 국내 지층 조건과 지하 공간의 활용도 증가로 인해서, 발파에 의한 굴착은 여전히 이용되고 있다. 발파 천공 이후에 존재하는 물이 있는 조건에서 실시되는 표준 발파는 폭굉압력 감소, 일정 장약량 사용, 디커플링과 같은 기술적인 어려움이 있다. 하지만, 기존의 표준 발파 공법을 대체할 만한 공법이 없는 실정이다. 본 논문에서는 건공화 펌프 시스템을 이용하여, 천공 내부에 존재하는 물을 제거하는 건공화 ANFO (Ammonium Nitrate Fuel Oil) 발파와 발파 성능의 비교를 위해서 추가적으로 표준 발파를 수행하였다. 각각의 발파 공법에서 계측된 진동 속도 데이터들과 환산거리의 함수로 이루어진 경험적인 발파진동 추정식을 이용하여, 최소제곱법에 의한 선형회귀분석을 실시하고, 궁극적으로 발파 성능을 정량적으로 분석하였다. 그 결과, 건공화 ANFO 발파에서 진동 감쇠가 더 크게 발생하고, 암반 파쇄에 더 많은 에너지를 소비하여, 더 가까운 거리에서 진동 허용 기준을 만족하는 진동 속도를 보였다. 또한, 표준 발파의 발파 진동 영향권이 건공화 ANFO 발파보다 더 멀리 있고, 발파 패턴의 범위가 더 넓은 것으로 나타났다. 본 연구에서 수행된 현장 발파 실험 결과로부터, 건공화 ANFO 발파 공법의 발파 성능이 효율적임을 확인하였다.

노천시험발파의 진동평가와 개선방안 (A Vibration Evaluation and Improvement Scheme for Open Test Blasting)

  • 김응록
    • 한국산학기술학회논문지
    • /
    • 제18권1호
    • /
    • pp.310-315
    • /
    • 2017
  • 대규모 건설공사 현장에서는 발파공사에 대한 표준발파패턴과 시험발파패턴의 발파진동추정식의 상이에 따른 설계변경의 반영 문제로 시공사, 건설사업관리자, 발주처간의 갈등요인을 해소하기 위한 체계적인 자료의 수집 및 분석 과정을 통하여 효율적인 대책수립이 필요한 실정이다. 발파진동에 의한 인접 구조물에 미치는 영향을 여러 각도로 평가하려는 연구들은 계속 되어 왔으나, 노천발파를 수행하면서 현장계측의 진동파형을 분석하여 인접 건축물의 안전성을 확보하고 현장여건에 적합한 발파공법을 연구한 사례는 미미한 실정이다. 따라서 현장여건에 적합하고 경제적이며 효율적인 발파작업을 수행할 수 있도록 시험발파를 통하여 발파패턴 선정의 개선방안을 제시하는 것이 필요하다. 본 연구에서는 실제 도로확장공사 현장에서 시험발파를 통한 표준발파공법 및 진동규제기준별로 적용되는 이격 거리를 기준으로 노천 발파작업을 수행하여 발파진동 값을 계측하고 이를 통한 발파공법별 진동예측식을 회귀분석 전산프로그램을 이용하여 신뢰수준 95%의 K, n, R등을 산출하였다. 시험발파 대상지역의 발파허용진동기준을 0.3cm/sec로 설정하고 노천발파지침의 발파진동추정식과 시험발파의 발파진동추정식에 따른 이격 거리별 장약량과 발파공법을 비교분석한 결과 사업비가 증가하는 요인을 도출할 수 있었다. 또한, 노천발파 작업 중 인접 구조물에 대한 계측 및 분석을 수행하고 노천발파지점과 가장 인접한 구조물을 선정하여 발파진동 계측 및 평가를 시행하여 노천발파공사를 완료하는 과정에서 나타난 노천발파 설계 시공 지침에서의 시험발파 절차 및 해석방법에 대한 문제점을 분석하여 개선방안을 제시하였다.

아프가니스탄 케심-파이자베드간 도로복구사업 해외설계 사례 (Overseas Design Introduction of Road Rehabilitation Project in Keshim~Faizabad, Afghanistan)

  • 정동호;김우선;김기백;정원준;이승우
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.569-580
    • /
    • 2008
  • If slope height was more than 20 meters, we conducted an analysis of stereographic projection and limit equilibrium at this slope. We proposed reduction of slope face angle and reinforcement of rock bolt depending on analysis. Blasting design : Standard pattern based on result of local test blasting was made for blasting design. Vibration criterion was set for less than 3.0mm/s because of outworn buildings and inhabitants opinions. Production blasting and Controlled blasting has been done as Construction standard pattern. After Vibration Monitoring has been done, so that we can control of complement. "Bidding Document" and AASHTO 2001 "A Policy on Geometric Design of Highways and Streets" were so for design criteria of earthwork but they were different actual design criteria and left something to be desired in Afghanistan. Therefore, although "Bidding Document" and "AASHTO 2001" were basic design criteria, domestic design criteria was reflected in this design criteria for complement by discussion with supervisor. Drainage design : For stability ratio, ditch of arch block and stonework was designed by rainfall data for the 13 years and discussion with supervisor. Pavement was designed as flexible pavement. Because these days in Afghanistan postwar repair works, especially urgent repairing of roads and newly making of roads, are very highly in progress, I think that Afghanistan is the region about which our construction technical experts should have great concerns.

  • PDF

서울 지하철공사 발파공법의 표준화 (Blasting Standardization works for NATM on the Seoul Subway Construction by Dr, Ginn Huh)

  • 허진
    • 기술사
    • /
    • 제16권3호
    • /
    • pp.5-23
    • /
    • 1983
  • On the Seoul Metropolitan Subway Construction of No. 3, 4 Line, the total length is 57 Km and it is now undergoing almost 55% progress. The working method is classified into Open Cut of 70% and the rest of 30% tunnelling method in the 48 job site. Above tunnelling method is execute by American Steel Support System and the rest of 10 job site carried out by New Austria Tunnelling Method. This paper describes Blasting Standardizations works on the above Tunnelling ' Open Cut Method under big slogan, first safety, second execution. As a superintendent, I strived standardization of works with Better powder, Better Drills ' Better Pattern. Geological structure of Seoul area is composed by Jurassic Granite and also the above rockgroup are over burden by Alluviums as a Unconformity. First of all, I carried out the standard amount of powder and burden through experimental standard blasting by each powder as following Blasting works in the subway construction is surrounding shop Building, under pass the city river and also under pass highest building basement floor. I made allowable Blasting Vibration Value by West-Germany Vornorm DIN 4150, Teil 3 and should measure each blasting works as fellows all of powder is used basically Low-Gravity and Low Velocity such as Slurry, Ammonium Nitrate ' Finex I, II. for Smooth Blasting Instead of Gelatin Dynamite. Electric Detonation Cap is used basically M/S Delay Cup instead of Electric delay ' Simultaneous cap. I applied following formula V=KW3/4 $D^{-2}$ V=Particle Velocity (Cm/sec) K=Ginh Huh's Value W=Delay Charge (Kg) D=Distance(m) In the Open Cut, within 1m distance from H-pile I made to use the Concrete breaker, as following V=7W/$^{0.5}$V/$^{-1.75}$ On the Concentrate Building area, I advise to use Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.e Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.

  • PDF

NATM 산악터널의 숏크리트 투입율에 관한 연구 (A study on Actual Quantity of Shotcrete Sprayed in a NATM tunnel)

  • 이철주;김성윤;김동건;유남재
    • 산업기술연구
    • /
    • 제29권B호
    • /
    • pp.57-64
    • /
    • 2009
  • This study has analysed actual overbreak, shotcrete rebound and the ratio between the actual quantity of shotcrete to designed shotcrete measured during a NATM tunnel construction. The measured shotcrete rebound was about 7.2% in average which was about half the allowable rebound (15%), showing shotcrete spraying was performed well. Based on the measurement of excavated tunnel shape, average overbreak was about 28.5cm after tunnel excavation by drill and blasting method. This was about 260% of allowable overbreak. In addition, due to the rebound and overbreak actual amount of shotcrete used in the tunnelling work was about 116.5 % of the designed value. According to the field measurement the ratio of actual shotcrete to designed value showed some relation with standard support pattern, but the size of overbreak did not show the correlation with standard support pattern. Hence current design specifications stating the size of overbreak based entirely on standard support pattern should perhaps be reestablished. The insight into the design guideline regarding overbreak and shotcrete.

  • PDF

미진동파쇄기를 이용한 표준암반반쇄굴착공법에 관한 연구 (A Study on the Standard Rock fracture Method Using the Finecker Plus)

  • 김영근;김일중;기경철
    • 화약ㆍ발파
    • /
    • 제23권1호
    • /
    • pp.19-30
    • /
    • 2005
  • 본 연구에서는 미진동파쇄기를 이용한 알반파쇄굴착공법의 기준 진동식과 암 분류에 따른 비장약량 산출식을 도출하였고 기존의 파쇄임도비율 산출식을 미진동파쇄기에 적합하도록 변환하였다. 그리고 표준암반파쇄패턴과 실시설계에 적용할 수 있는 공당장약량을 결정하였다 그 결과 자승근 환산식은 $V=345.39(D/\sqrt{W})^{-1.4484$, 비장약량 산출식은 $W_f=(2.3\~2.5)\;f_agdV$, 실시설계에 적용할 수 있는 공당장약량은 0.54kg, 직경 30cm의 파쇄입도비율은 약$48.7\%$로 산출되었다. 본 암반파쇄굴착공번은 타 공법에 비해 현장적 용성이 탁월한 것으로 사료된다.