• Title/Summary/Keyword: Standard Site Method

Search Result 494, Processing Time 0.025 seconds

A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method - (OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 -)

  • Lee, Hansoo;Lee, Chiho;Han, Heesu;Lee, Jeongwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.56-68
    • /
    • 2024
  • A construction standard production rates system for the factory built and on-site installation phases of OSC (Off-Site Construction)-based precast concrete (PC) structures in apartment buildings was recently proposed to establish an objective cost standard (Lee et al., 2021). In addition, the Korean government has taken steps to improve the institutional foundation for the systematic calculation of PC construction costs such as revising construction standard production rates for major components that can be applied to the on-site installation phase of PC method. In this study, we analyzed the results of a field survey of apartment building PC structures and collected expert opinions to develop factory-built and on-site installation standard production rates that can be applied to apartment building PC method. We also propose directions for improving the standard production rates so that they can be applied to the site and component of apartment buildings by comparing them with the current standard production rates. This study also derived the cost characteristics and cost reduction measures of PC construction by calculating the construction costs using the developed rates and comparing the construction costs with the RC methods of apartment buildings of the same scale. The construction standard production rates for PC construction derived in this study are expected to contribute to the spread of PC construction by ensuring the objectivity and consistency of the results of PC methods cost estimation.

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

Antenna Gain Measurement in Time Domain (시간 영역에서 안테나 이득 측정 연구)

  • Park, Jungkuy;Kim, Woo-Nyun
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.23 no.11
    • /
    • pp.1217-1227
    • /
    • 2012
  • There are several antenna calibration methods, so-called 3-Antenna Method, Standard Site Method, and Standard Antenna Method which measure the antenna gains or antenna factors. These methods yield the free space or quasi free space antenna gains in only the frequency domain. In this paper, an antenna calibration method using the time domain in the open area test site is discussed. The reflected waves due to the ground are traced in the time domain. After they are removed by the time gating function of network analyzer, the free space transmission coefficient $S_{21}$ is extracted. Such a way is applied to the broad band horn antenna ranging 1 GHz to 18 GHz, and the free space gains are obtained by Friis transmission equation. The method is checked by Standard Site Method in open area test site. The results show comparatively good agreement except for 18 GHz.

Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager (현장 관리자 중심의 건축공사 가설기술 표준분류체계구축)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

RHODIUM SELF-POWERED NEUTRON DETECTOR'S LIFETIME FOR KOREAN STANDARD NUCLEAR POWER PLANTS

  • YOO CHOON SUNG;KIM BYOUNG CHUL;PARK JONG-HO;FERO ARNOLD H.;ANDERSON S. L.
    • Nuclear Engineering and Technology
    • /
    • v.37 no.6
    • /
    • pp.605-610
    • /
    • 2005
  • A method to estimate the relative sensitivity of a self-powered rhodium detector for an upcoming cycle is developed by combining the rhodium depletion data from a nuclear design with the site measurement data. This method can be used both by nuclear power plant designers and by site staffs of Korean standard nuclear power plants for determining which rhodium detectors should be replaced during overhauls.

A Study of Application of Mobile System for Urban Facility Management (도시시설물 관리를 위한 모바일시스템 활용에 관한 연구)

  • Na, Young-Woo
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.411-413
    • /
    • 2010
  • The purpose of this research is to study use method of mobile system for effective field management for urban facilities. GIS database could be standardized commonly useful for the site management of city facilities through standard list, standard items and standard specification appropriate for the mobile system, and this is effective to manage the city facilities on the site in real time.

  • PDF

Spatial interpolation of geotechnical data: A case study for Multan City, Pakistan

  • Aziz, Mubashir;Khan, Tanveer A.;Ahmed, Tauqir
    • Geomechanics and Engineering
    • /
    • v.13 no.3
    • /
    • pp.475-488
    • /
    • 2017
  • Geotechnical data contributes substantially to the cost of engineering projects due to increasing cost of site investigations. Existing information in the form of soil maps can save considerable time and expenses while deciding the scope and extent of site exploration for a proposed project site. This paper presents spatial interpolation of data obtained from soil investigation reports of different construction sites and development of soil maps for geotechnical characterization of Multan area using ArcGIS. The subsurface conditions of the study area have been examined in terms of soil type and standard penetration resistance. The Inverse Distance Weighting method in the Spatial Analyst extension of ArcMap10 has been employed to develop zonation maps at different depths of the study area. Each depth level has been interpolated as a surface to create zonation maps for soil type and standard penetration resistance. Correlations have been presented based on linear regression of standard penetration resistance values with depth for quick estimation of strength and stiffness of soil during preliminary planning and design stage of a proposed project in the study area. Such information helps engineers to use data derived from nearby sites or sites of similar subsoils subjected to similar geological process to build a preliminary ground model for a new site. Moreover, reliable information on geometry and engineering properties of underground layers would make projects safer and economical.

Study of Selection Plan of Circuit breakers, Cables and Modeling of Korean Low Voltage Electrical Installation integration Test Site based on IEC 60364 (IEC 60364 기반의 한국형 저압전기설비 통합 실증단지 모델링 및 차단기와 케이블의 선정 방안 고찰)

  • Kim, Doo-Ung;Ryu, Kyu-Sang;Kim, Han-Soo;Shin, Dae-Sung;Ryu, Ki-Hwan;Kim, Chul-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.9
    • /
    • pp.59-64
    • /
    • 2015
  • IEC is an international standards which are used in many countries with Europe as the center. IEC standard is introduced in Korea according to WTO/TBT agreements, however until now there are no buildings in Korea which are designed applying IEC standard. Therefore, KEA(Korea Electric Association) is scheduled to construct Korean low voltage electrical installation integration test site which is designed applying IEC standard. In this paper, before being under construction of Korean low voltage electrical installation integration test site, power substation is modeled based on real design parameters and method to select circuit breakers and cables is presented applying IEC standard in the modeled power substation. EMTP(ElctroMagnetic Transient Program) is used for simulation program. EMTP which is power system analysis program is easy to model power system and power substation.

Comparison of Bin Averaging Method and Least Square Method for Site Calibration (단지교정을 위한 빈평균방법과 최소자승법의 비교)

  • Yoo, Neung-Soo;Nam, Yun-Su;Lee, Jeong-Wan;Lee, Myeong-Jae
    • Journal of Industrial Technology
    • /
    • v.25 no.B
    • /
    • pp.157-164
    • /
    • 2005
  • Two methods, the bin averaging method and least square method, are often used in calibrating wind turbine test sites. The objective of this work was to determine a better method to predict the wind speed at wind turbine installing point. The calibration was done at the test site on a complex terrain located in Daegwallyeong, Korea. It was performed for two different cases based on the IEC 61400-12 power performance measurement standard. The wind speeds averaged for 10 minutes ranged between 4 m/s and 16 m/s. The wind-direction bins of each meteorological mast were 10 degrees apart, and only the bins having data measured for more than 24 hours were employed for the test site calibration. For both cases, the two methods were found to yield almost same results which estimated real wind speed very closely.

  • PDF

Proper Estimating Method for Environmental Preservation Cost in Road Projects (도로공사 환경보전비의 적정 산출 방안)

  • Park, Ji-Sun;Lee, Sea-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.3-10
    • /
    • 2012
  • The current enforcement regulation of "Construction Technology Management Act" prescribes calculation standard of environmental preservation cost in construction site. According to this standard, environmental preservation cost is calculated by using the quantity-per-unit costing method or applied fixed rate on direct cost. However, when calculated by using the quantity-per-unit costing method it is few items to put in the budget according to standard of construction estimate and in the case of using the fixed rate on direct cost it is not considering various characteristics of the construction site. Therefore, it is needed a improvement plan of estimating method and management system for environmental preservation cost. In this study, it surveyed the actual state of the environmental preservation cost according to magnitude of project, site location, anti-pollution facilities and etc. over 38 road projects. The research reported in this paper environmental preservation cost was variously distributed over construction sites. Thus it needs to estimating method and management system to consider characteristics of construction site for environmental preservation cost.