• Title/Summary/Keyword: Standard Quantity per Unit

Search Result 20, Processing Time 0.027 seconds

Revisions on the payline for overbreak in Tunnel

  • Park, T.;Ahn, B.;Baek, S.;Tae, Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.714-715
    • /
    • 2015
  • Drill and blast method has been most widely used in tunnel excavation, after NATM (New Austrian Tunneling Method) was introduced in 1983. The NATM method utilized mass of shotcrete to secure the bearing capacity of tunnels. Overbreak defined how much larger the actual excavation was than the planned. When it became larger, more shotcrete was required to fill in it Here, payline fixed allowable overbreak, referring to payable amounts of shotcrete. Since owner was not responsible for shotcrete exceeding payline, it was important to properly establish the standards for payline. Although the standards were provided in 'Poom-sam'(standardized quantity per unit), they did not properly reflect the actual conditions for excavation. Thus, this study reviewed existing domestic and foreign standards for overbreak, and estimated overbreak for each type of support using survey data, and finally provided the improvements on the current standards.

  • PDF

Moist Air Density Calculation for Air Condition (공기 상태량에 대한 습공기 밀도 계산)

  • Kim, Jong-Woo
    • Transactions of the KSME C: Technology and Education
    • /
    • v.2 no.2
    • /
    • pp.105-111
    • /
    • 2014
  • Generally the lower part of the Earth's atmosphere, which is 20km above the ground, is called "air." The composition of this area is almost consistent consisting of nitrogen, oxygen, and other gases. Air density refers to the mass per unit volume of earth atmosphere. Though air is made of the mixed gases in a constant composition, the water vapor is one of the very changeable components. The density of moist air is lower than the dry one at the same temperature and pressure. As the density varies according to the pressure and temperature, this paper attempts to explore the main factors in the air quantity calculation by examining first the density calculation process according to the air property, and second the relation between the actual and standard air flow.

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

Fire Resistance Performance of Fiber-Cocktail Reinforced 50 MPa High Strength Concrete (섬유혼입된 50 MPa 고강도 콘크리트의 내화성능)

  • Youm, Kwang-Soo;Jeon, Hun-Kyu;Park, Jong-Heon
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.3
    • /
    • pp.55-60
    • /
    • 2009
  • After applying the fiber cocktail(polypropylene and steel fibers) into the mixture of high strength concrete with a compressive strength of 50 MP, the fire test was carried out on specimens in order to evaluate the fire resistance performance, such as possible explosive spalling, temperature distributions of concrete and rebar. According to an enforcement ordinance, four column specimens were exposed to the fire for 180 minutes based on the standard curve of ISO-834. No explosive spalling has been observed. The required minimum quantity of polypropylene to prevent explosive spalling is more than 0.57 kg per unit concrete volume. The comparing test results from temperature distributions of concrete and rebar has found that the difference of fiber quantity is insignificant.

  • PDF

Development of Defect-Repair Method-Cost Mapping Algorithm of Concrete Bridge Using BMS Data (BMS 데이터를 활용한 콘크리트 교량의 결함-공법-비용 매핑 알고리즘 개발)

  • Lee, Changjun;Park, Wonyoung;Cha, Yongwoon;Jang, Young-Hoon;Park, Taeil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.267-275
    • /
    • 2023
  • As aged infrastructures have been increased, the importance of accurate maintenance costs and proper budget allocation for infrastructure become prominent under limited resources. This study proposed a mapping algorithm between representative defects, repair methods, and the estimated maintenance costs for concrete bridges. In this regard, using BMS (Bridge Management System) data analysis, bridge repair methods were classified and matched with defects according to their locations, types, and sizes. In addition, the maintenance costs were estimated based on the amount of work-load and quantity per unit using CSPR (Cost Standard Production Rate). As a result, the level of accuracy was an average of 85.1 % compared with the actual bill of quantity for Seoul bridge maintenance. The accuracy of maintenance costs is expected to be enhanced by considering the various site conditions such as pier height, extra charge conditions, additional equipment, etc.

Comparisons of Drainage Performance on Coarse Grained Soils with Regard to Horizontal Drainage Type (조립질 지반에서의 수평배수재 종류에 따른 배수성능 비교)

  • Teawan Bang;Wanjei Cho;Seunghwan Seo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.11
    • /
    • pp.25-31
    • /
    • 2023
  • Horizontal drainage, which are representative dewatering method of domestic and foreign slope, are applied to reducing pore water pressure. Accordingly, several previous studies have been conducted, but horizontal drainage are standardized which is an unclean standard for a quantity calculation in filed. Therefore, this study presents field soil and laboratory model box to identify a drainage performance and influencing factors of various horizontal drainage. Furthermore, this study verifies the performance comparison of drainage shape or size according to different particle size distributions. In the outflow results for steady state, the study found that all samples are drained at a constant rate after a minimum of 3 minutes to maximum of 15 minutes. In the case of comparing the outflow per hour (Unit flux) in coarse grained soils, it found that drainage shape and size affect drainage performance. In the result, the future expected to be used basic data that experiment of drainage performance on fine grained soils and determine the quantity.

The estimating method of construction workable-quantity per unit time - Focused on Pump-Dredge - (건설기계 시간당작업량(Q) 산정 개선방안 -펌프준설선 작업효율(E)을 중심으로-)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.125-133
    • /
    • 2010
  • Although work-efficiency of construction machinery is a critical factor for estimating its workable-quantity perunit time, the efficiency figure table presented in the Poom-Sam that is used for Construction Cost Estimation of public sectors in Korea is very subjective for practical usage. In order to suggest objective work-efficiency table for a Pump-Dredger, domestic and overseas documentary records were investigated and on-going construction sites were also visited. Moreover, actual work quantities collected from the site visits were compared with the ones calculated based on the Standard Measurement Methods used in Japan. The research found that the table can be revised by means of detailing down by several factors, namely project type, depth of soil, undersea-site shape, and condition on the sea for better estimation of its workable-quantity. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

Quantity and Processing Characteristics of Potatoes for Chipping during Autumn Cultivation by Harvest Time

  • Gyu Bin Lee;Jang Gyu Choi;Do Hee Kwon;Jae youn Yi;Young Eun Park;Yong Ik Jin;Gun Ho Jung
    • Proceedings of the Plant Resources Society of Korea Conference
    • /
    • 2023.04a
    • /
    • pp.25-25
    • /
    • 2023
  • As the demand for processing potatoes increases, imports of raw potatoes and potato products are increasing, so it is necessary to expand potato production as raw materials for processing in Korea. Potato varieties for processing that can be grown in fall have been developed, but research on cultivation technology and processing quality management technology to improve chip processing quality is very insufficient. Therefore, this study was conducted to investigate the optimal harvest time by investigating the quantity and chipping characteristics of potato chips during autumn cultivation. As the test varieties, the chip processing varieties "Saebong", "Eunsun", and "Geumnaru" were used, and the potato cultivation site was the Seocheon-gun Test field (214 Gaeya-ri) of the Chungcheongnam-do. The test treatment was at harvest time after spring cultivation, and the potatoes were harvested at 70, 80, 90, and 100 days after sowing based on the sowing time. The investigation items were potato productivity (total yield, yield of standard processing, and number of tubers) and chip-processing characteristics (chip color, dry matter content, glucose content, etc.). As a result of examining the yield characteristics according to the harvest time, statistical significance was not found according to the treatment. The total yield (ton/ha) was 27.5 to 30.5, and there was no significant difference depending on the time of 70 to 100 days after harvest. The standard quantity for processing (yield of 81-250g potatoes per unit) also showed a similar trend. In chipping characteristics according to harvest time, statistical significance was high in specific gravity and glucose content. The specific gravity was highest at 1.077 at 70 days after harvest, and the glucose (mg/dL) content was the lowest at 37.5 at 80 days after harvest. Statistical significance was not recognized, but chip color (L value) was the highest at 64.4 at 70 days after harvest. Therefore, it is judged that the optimal harvesting time for chip processing is 70 to 80 days after sowing.

  • PDF

A Study on the Heat Release Characteristics of Fire Load for Performance Based Design of Multiplexes: A Focus on the Heat Release Rate and Fire Spread Rate of Cinema Seats (복합영상관의 성능위주설계를 위한 가연물의 연소발열특성 연구: 객석의자의 열발생률 및 연소확산속도를 중심으로)

  • Nam, Dong-Gun;Jang, Hyo-Yeon;Hwang, Cheol-Hong;Lim, Ohk-Kun
    • Fire Science and Engineering
    • /
    • v.34 no.1
    • /
    • pp.11-17
    • /
    • 2020
  • As performance-based design (PBD) has a direct impact on evacuation safety assessments, designing fire scenarios based on real fire tests is essential. To improve the reliability of the PBD for fire safety in multiplexes, information on fire behavior, such as heat release rate (HRR) and fire spread rate, are provided in this study by conducting a standard fabric flammability test. To this end, several chairs were arranged in a pattern that resembled a theater-style seating. The peak HRR and heating value per unit mass for each chair ranged from 415 kW to 988 kW and 15.2 MJ/kg to 23.8 MJ/kg, respectively. The heating values per unit mass of the new and old chairs were 23.6 MJ/kg and 16.7 MJ/kg, respectively. As the quantity of plastic and cushioning materials in the new chairs was more than that of the old ones, the new chairs were more vulnerable to fire hazards. Furthermore, when the chairs were arranged in a line, the fire spread rate was observed to be 0.39-0.42 m/min, regardless of the ignition location. Finally, a fire growth curve showing the peak HRR and fire spread rate was also demonstrated.

A Study of Improvements in the Standards of Cost Estimate for the New Excellent Technology in Construction (건설 신기술의 원가산정기준 개선방안에 대한 연구)

  • Lee, Ju-hyun;Tae, Yong-Ho;Baek, Seung-Ho;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.65-76
    • /
    • 2022
  • The New Excellent Technology (NET) designation system, introduced in 1989 for the purpose of promoting the development of domestic construction technology and enhancing national competitiveness, reviews the statement of construction cost of new technologies. And the cost reduction effect such as design, construction, and maintenance cost and the effect of reducing the construction duration are evaluated as an evaluation criteria of economic feasibility. However, in this evaluation process, differences of opinion between the institution of construction cost estimating standard management and the new technology developer about unique technologies frequently occur. In addition it is difficult to objectively compare the construction duration with existing similar technologies because there is no information on productivity as the current cost estimating standards for new technologies only present the required amount per unit quantity. In this study, the current state of cost estimating criteria review procedure, evaluation criteria, and cost estimating standards establishment method were analyzed when screening for the designation of a new construction technologies, and compared with overseas cost estimating standards, measures to improve the cost estimating standards of current construction new technologies were suggested. Through the improved cost estimating standards of this study, it is expected that cost information on new technologies will be provided to clients in more detail than the current ones, and the availability and applicability of new construction technologies would be improved by simplifying the construction cost calculation process more.