• 제목/요약/키워드: Standard Construction Period

검색결과 202건 처리시간 0.026초

표준시장단가 공고시기 조정에 따른 영향분석 연구 (Analysis of the Influence of Changing the Announcement Date of Standard for Construction Cost Estimation)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.204-205
    • /
    • 2020
  • Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.

  • PDF

근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석 (The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project)

  • 박태일;김경훈;신은영
    • 한국건설관리학회논문집
    • /
    • 제20권2호
    • /
    • pp.37-43
    • /
    • 2019
  • 주당 최장 법정 근로시간을 단축하는 내용의 '근로기준법 개정안'이 통과됨에 따라 근로시간 단축에 따른 근로자 소득감소, 공사기간 연장, 공사비 증가 등 다양한 문제가 발생하고 있다. 특히 다른 산업과 비교할 때, 생산성을 중시하는 건설 프로젝트의 경우 공종에 따라 주 52시간 근무제에 따른 영향의 정도가 더 클 것으로 예상되나 이에 대한 연구는 미흡한편이다. 이에 본 연구에서는 NATM 터널 공사를 대상으로 표준품셈 기반의 표준공정과 굴착 사이클 타임 그리고 공종별 단위 공기를 제시하고, 이를 통해 주 52시간 근무 적용에 따른 실제 작업조의 변화와 이에 따른 표준 공기 및 공사비의 영향을 분석하였다. 분석결과 굴착 공기와 총 공기는 각각 20%, 8.9% 증가하였으나, 굴착공사비와 총 공사비는 오히려 각각 1.2%, 0.5% 감소하는 것으로 확인되었다.

현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석 (Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field)

  • 박홍태;이양규
    • 한국재난정보학회 논문집
    • /
    • 제9권2호
    • /
    • pp.195-205
    • /
    • 2013
  • 건설공정관리는 주어진 공기 내에 공사를 완료하기 위해 투입되는 자원과 요소작업들의 종합적인 계획을 말한다. 이중 공사기간의 산정은 사업초기 신뢰할만한 근거에 의해 결정되어야 한다. 그러나 실제 현장에서는 담당자의 직관적 판단, 과거 유사 프로젝트의 공기 참고 등의 부정확한 방법으로 개별 작업기간이 결정되고 있다. 이러한 기존 방식의 개선을 위한 선행연구로 본 연구는 TBM공법 $({\phi}2.6m,\;{\phi}3.0m,\;{\phi}3.5m,\;{\phi}5.0m,\;{\phi}8.0m)$ 운영을 위한 건설사업의 초기단계에서 활용할 수 있는 표준모델을 제시하여 신속하게 전체 개략공기를 추정할 수 있는 공기를 산정하여 제시하였다. 따라서 본 연구에서 TBM 구경별로 분석하여 제시한 총 공사기간은 향후 TBM 공사를 수행할 때, 기본계획단계와 기본설계단계에서 공사계약, 공사비 산정, 공정계획을 수립하고 관리하는데 유용한 자료가 될 것으로 확신한다.

해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구 (A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel)

  • 배근우
    • 한국건설관리학회논문집
    • /
    • 제18권4호
    • /
    • pp.36-47
    • /
    • 2017
  • 대표적인 국내 해저터널 시공사례로 침매공법을 적용한 가덕 해저터널이 완공되어 운영 중이고, NATM 공법을 적용한 보령~태안간 해저터널이 건설중이다. 호남~제주 간 고속철도 해저터널이 구상중 이고, 일본, 중국과도 해저터널 건설에 대한 타당성이 검토되고 있다. 그러나 Shield TBM 공법을 적용한 해저터널에 대한 국내 시공사례가 없어, 현재의 기술력으로는 장대 해저터널 사업성 분석 및 적정 공사기간 예측 등 공사수행을 위한 공정계획정보 제공이 어렵다. 경제성 등 이유로 정부기관 및 발주기관도 Shield TBM 공법 적용에 소극적이고, Shield TBM 공법을 적용한 공정관리분야 기술적 자료도 부족한 실정이다. 따라서, 장대 해저터널 사업성 분석 및 적정 공사기간 예측하기 위한 표준공정관리체계가 필요하다. 본 연구를 통해 WBS, Network Diagram, 단위 공사기간 산출모델 등 해저터널 표준공정관리 체계를 제시하므로써, 장래 건설되어질 해저터널 사업에 기술적, 경제적으로 기여하고자 한다.

공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구 (A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing)

  • 이영재;조동현;이미영;박상헌;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

보-기둥구조 PC공동주택의 부재 조립기간에 대한 수학적 알고리즘 (Mathematical Algorithm for Members Erection Period of Beam-Column System PC Apartment Building )

  • 김기호;이범식;김진원;이동건;김민준;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2023
  • Estimating the construction period at the initial stage of the project and determining whether it is appropriate is very important for the developer's decision-making and the success of the construction company's business. Existing researchers have conducted various studies to calculate the appropriate construction period, but there is no study on the influencing factors and methodology for the construction period of beam-column PC apartment building frame construction. The purpose of this study is to calculate the PC member assembly time using the mathematical algorithm of PC member assembly. The results of this study can be used as basic data to calculate the construction date of the standard floor of PC construction.

  • PDF

Freiesleben 함수를 이용한 콘크리트구조물의 새로운 강도관리모델 적용에 관한 연구 (A Study on the Application of New Strength Control Model of Concrete Structure using Freiesleben Function)

  • 김무한;남재현;김정일;길배수
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제7권2호
    • /
    • pp.135-140
    • /
    • 2003
  • As a construction technique is developed recently, the construction space and construction period are considered to important matters. Especially, in case of construction period, several method is proposed for strength control in the construction field. However there are very little strength control models for application of internal condition. The purpose of this study is to develop a strength control model for application of variety internal condition at construction field. The results are as follows ; 1) According to the results of compressive strength of concrete evaluated by logistic curve and proposed curve, proposed curve is applicable of construction field because there is similar relation with logistic curve. 2) It is shown that the construction period is shortened by reduction of the formwork removal time, because a predicted compressive strength of using the new curve is higher than the proposed compressive strength of standard.

지하철골공사 공사비산정기준 마련을 위한 현장조사 연구 (A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey)

  • 송태석;한상준;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

건설업 산업안전보건관리비 사용 실태조사 및 분석 (Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry)

  • 강성윤;오세욱;김창원;정기효
    • 대한안전경영과학회지
    • /
    • 제25권2호
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

U-플랜지 트러스 복합보를 사용한 근린생활시설의 경제성 분석 (Economic Analysis of Neighborhood Facility using the U-flanged Truss Hybrid Beam)

  • 오명호;박성진;김영호
    • 한국공간구조학회논문집
    • /
    • 제21권3호
    • /
    • pp.77-84
    • /
    • 2021
  • In this study, In order to apply the U-flanged truss hybrid beam to the actual construction site, the structural design of the basic module of the middle and low-rise neighborhood living facilities was performed according to the Korea Design Standard, and the construction cost and construction period were compared with the traditional reinforced concrete structure system. As a result of analyzing the construction cost for the basic module, if the U-flanged truss hybrid beam and D-Deck slab system are used, the construction cost can be reduced by 86% compared to the traditional reinforced concrete structure system. In addition, as a result of analyzing the construction period for a floor area of 1,000m2, using the U-flanged truss hybrid beam and D-Deck slab system can save 2.0days in construction period compared to the traditional reinforced concrete structure system. Therefore, the U-flange truss hybrid beam can secure sufficient economic feasibility compared to the existing reinforced concrete method in terms of cost reduction and shortening of construction period.