• Title/Summary/Keyword: Stage set

Search Result 1,324, Processing Time 0.028 seconds

다목적 실용위성 2호 기계 시스템 개념설계

  • Kim, Gyu-Seon
    • Aerospace Engineering and Technology
    • /
    • v.1 no.1
    • /
    • pp.42-54
    • /
    • 2002
  • In December of 1997, Korea Aerospace Research Institute begin to develope the conceptual design of Kompsat2 as the Kompsat1 design is nearly completed. Basic direction of this design was set up to utilized the heritage of Kompsat1 and modify the payload module to accommodate the new high resolution space borne camera. And in the early stage of this design, total system configuration design study was conducted based on 1st level payload information. In this paper, mechanical system design at various stage is documented and this will be used as a path finder or guidelines in the future feasibility study or conceptual design.

  • PDF

Sampling Plans Based on Truncated Life Test for a Generalized Inverted Exponential Distribution

  • Singh, Sukhdev;Tripathi, Yogesh Mani;Jun, Chi-Hyuck
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.2
    • /
    • pp.183-195
    • /
    • 2015
  • In this paper, we propose a two-stage group acceptance sampling plan for generalized inverted exponential distribution under truncated life test. Median life is considered as a quality parameter. Design parameters are obtained to ensure that true median life is longer than a given specified life at certain level of consumer's risk and producer's risk. We also explore situations under which design parameters based on median lifetime can be used for other percentile points. Tables and specific examples are reported to explain the proposed plans. Finally a real data set is analyzed to implement the plans in practical situations and some suggestions are given.

DEVELOPMENT OF A MAXIMUM DEMAND CONTROLLER USING FUZZY LOGIC (퍼지로직 알고리즘을 이용한 최대수요전력 제어기의 개발)

  • Han, Hong-Seok;Chung, Kee-Chul;Seong, Ki-Chul;Yoon, Sang-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.778-780
    • /
    • 1996
  • The predictive maximum demand controllers often bring about large number of control actions during the every integrating period and/or undesirable load-disconnecting operations during the begining stage if the integrating period. To solve these problems, a fuzzy predictive maximum demand control algorithm is proposed, which determines the sensitivity if control action by urgency if the load interrupting action along with the predicted demand reading to the target or the time arriving at the end stage if the integrating period. A prototype controller employing the proposed algorithm also is developed and its performances are tested by PROCOM SYSTEMS Corperation of Korea.

  • PDF

Supply Chain Contract with Put and Call Option: The Case of Non-Linear Option Premium Price

  • Saithong, Chirakiat;Luong, Huynh Trung
    • Industrial Engineering and Management Systems
    • /
    • v.12 no.2
    • /
    • pp.85-94
    • /
    • 2013
  • This research investigates the supply chain contract between a distributor and a supplier in which the selling period is relatively short in comparison with long production lead time. At the first stage, supplier who is a Stackelberg leader offers the distributor a contract with a set of parameters, and subjected to those parameters, the distributor places the number of initial orders as well as options. In order to purchase the option, the distributor pays non-linear option premium price with respect to the number of purchased options. At the second stage, based on realized demand, the distributor has the right to exercise option as either put or call which is limited up to the number of purchased options. The wholesale price contract is used as a benchmarking contract. This research has confirmed that the supply chain contract with a non-linear option premium price can help to coordinate the supply chain.

Layered model of aging concrete. General concept and one-dimensional applications

  • Truty, Andrzej;Szarlinski, Jan;Podles, Krzysztof
    • Computers and Concrete
    • /
    • v.17 no.6
    • /
    • pp.703-721
    • /
    • 2016
  • A novel approach to modeling concrete behavior at the stage of its maturing is presented in this paper. This approach assumes that at any point in the structure, concrete is composed of a set of layers that are activated in time layer by layer, based on amount of released heat that is produced during process of the concrete's maturing. This allows one to assume that each newly created layer has nominal stiffness moduli and tensile/compressive strengths. Hence introduction of explicit stiffness moduli and tensile/compressive strength dependencies on time, or equivalent time state parameter, is not needed. Analysis of plain concrete (PC) and reinforced concrete (RC) structures, especially massive ones, subjected to any kind of straining in their early stage of existence, mostly due to external loads but especially by thermal loading and shrinkage, is the goal of the approach. In this article a simple elasto-plastic softening model with creep is used for each layer and a general layered model behavior is illustrated on one-dimensional (1D) examples.

Security Measures by Diagnosing Vulnerabilities in Web Applications

  • Kim, Hee Wan
    • International journal of advanced smart convergence
    • /
    • v.10 no.4
    • /
    • pp.22-29
    • /
    • 2021
  • For web application vulnerability diagnosis, from the development stage to the operation stage, it is possible to stably operate the web only when there is a policy that is commonly applied to each task through diagnosis of vulnerabilities, removal of vulnerabilities, and rapid recovery from web page damage. KISA presents 28 evaluation items for technical vulnerability analysis of major information and communication infrastructure. In this paper, we diagnose the vulnerabilities in the automobile goods shopping mall website and suggest security measures according to the vulnerabilities. As a result of diagnosing 28 items, major vulnerabilities were found in three items: cross-site scripting, cross-site request tampering, and insufficient session expiration. Cookie values were exposed on the bulletin board, and personal information was exposed in the parameter values related to passwords when personal information was edited. Also, since the session end time is not set, it was confirmed that session reuse is always possible. By suggesting security measures according to these vulnerabilities, the discovered security threats were eliminated, and it was possible to prevent breaches in web applications and secure the stability of web services.

CONSTRUCTION ERROR TYPES - THE EXECUTION STAGE OF DUBAI PROJECTS

  • Hamad Aljassmi;Sangwon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.459-467
    • /
    • 2011
  • Construction errors can have significant effects on project performance. Yet, any attempt to tackle error should be driven by the ability to understand its archetypal nature. This study aims to analyze a variety of construction errors at the execution stage, in order to develop a comprehensive set of categories that shall provide insights about the effect of different error types on the industry. We investigate a database provided by an authoritative source, which includes a number of 256 construction errors that occurred in the year 2009 in Dubai construction industry. Results from this study reveal that the most common error arose from 'poor workmanship' which accounted for 21% of the total encountered faults. The next most common types arose from the 'usage of impaired materials', followed by the 'deviation from an intended dimension'. These observations infer that the majority of construction errors are driven by workers' lack of skill or competence. Moreover, it suggests that execution-oriented errors are the major cause of faults and accidents rather than design errors.

  • PDF

DEVELOPMENT OF KNOWLEDGE BASED SELECTION PROCESS FOR FINISHING MATERIALS AT BUILDING DESIGN PHASE

  • Su-Ho Yun;Hyun-Soo Park;Gyu-Tae Noh;Hye-Rin Lee;Kyo-Jin Koo
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.209-212
    • /
    • 2011
  • Selection of finishing materials in the design stage is an important management factor in terms of use safety and satisfaction, and work cost and process. However, selection of materials in the design stage is usually conducted without related guidelines or a set process, but depends on the experience of the architect or advice of materials company employees. Therefore, the aim of this study was to develop a finishing materials selection process that can be used by a architect. Materials selection related rules collected through interview with experts and five office building cases were used as knowledge. In addition, another aim of the study was to propose a prototype system interface for use in the field.

  • PDF

A Simple Dual-Antenna Diversity Gain Measurement System at 2.4GHz

  • Kim, Jin-Gyong;Chung, Kyung-Ho;Ho, Yo-Choul;Kim, Moon-Il
    • Journal of IKEEE
    • /
    • v.13 no.2
    • /
    • pp.220-223
    • /
    • 2009
  • A simple measurement system is built to estimate the dual-antenna diversity gain at 2.4GHz easily in open lab environment. To obtain multipath fading propagation channel, the system consists of two transmission horn that placed on opposite direction and a rotating stage mechanically changing the position of test dual-antenna with time over distance greater than one wavelength. Estimated diversity is nearly same as theoretical value such that measured diversity gain of 30mm separated is about 6dB similar to theoretical value of 5.7dB and increases monotonically with the increasing separation distance as predicted by the theory. Proposed measurement system that is simple enough to fit in a small space can evaluate the performance of various dual-antennas with a reasonable accuracy with lower 5% difference between the ten sets of measured waveform distribution and theoretical Rayleigh cumulative distribution.

  • PDF

The Solution of Vehicle Scheduling Problems with Multiple Objectives in a Probabilistic Environment

  • Park, Yang-Byung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.14 no.1
    • /
    • pp.119-131
    • /
    • 1988
  • Vehicle Scheduling Problem (VSP) is a generic name given to a whole class of problems involving the visiting of "stations" by "vehicles," where a time is associated with each activity. The studies performed to date have the common feature of a single objective while satisfying a set of restrictions and known customer supplies or demands. However, VSPs may involve relevant multiple objectives and probabilistic supplies or demands at stations, creating multicriteria stochastic VSPs. This paper proposes a heuristic algorithm based on goal programming approach to schedule the most satisfactory vehicle routes of a bicriteria VSP with probabilistic supplies at stations. The two relevant objectives are the minimization of the expected travel distance of vehicles and the minimization of the due time violation for collection service at stations by vehicles. The algorithm developed consists of three major stages. In the first stage, an artificial capacity of vehicle is determined, on the basis of decision maker's subjective estimates. The second one clusters a set of stations into subsets by applying an efficient cluster method developed. In the third one, the stations in each subset are scheduled by applying an iterative goal programming heuristic procedure to each cluster.

  • PDF