• Title/Summary/Keyword: Stage construction

Search Result 2,330, Processing Time 0.032 seconds

Engineering Construction With High-Precision Survey Equipment (3D laser scanner, 3D photo scanner, drone) (고정밀 측량장비(3D 레이저 스캐너, 3D 포토 스캐너, 드론)를 활용한 건축 시공단계의 엔지니어링 적용사례)

  • Krchung, Kwang-Ryang;Lee, Byoung-Do;Kim, Tae-Hyuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.133-134
    • /
    • 2019
  • As information and construction technology increases, the demand for sophisticated geometric design grows. Design of buildings is becoming more larger, higher, and complicated every day, requiring much new construction technology to bring the design into reality. Nonetheless, the speed of construction technology development is not as rapid. This study concerns the difficulties of realization of sophisticated geometric design. It aims to suggest using BIM and precision survey equipment during the construction stage of the project is a way to resolve. The study will list how to use BIM as an engineering platform incorporating a photo scanner, a scanner drone, and a 3D scanner in the construction stage of projects, how these progressive projects were able to benefit from the high-construction technology.

  • PDF

A Basic Analysis of the Management Factors the Application of Modular Construction Method in Buildings (건축물 모듈러 공법 적용을 위한 단계별 관리요인 기초적 분석)

  • Kim, Sung-Eun;Lee, Shin-Ja;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.373-374
    • /
    • 2023
  • Modular construction is a cost-effective and time-saving method of building that involves prefabricating modules in a factory and assembling them on-site. However, effective management factors must be considered at each stage of the process to ensure quality and stability. This study analyzes these management factors and proposes systematic ways to manage them, including construction planning, data management, and quality assurance. Proper management can improve construction quality, shorten construction time, and reduce costs. These stage-specific management factors are crucial for the success of modular construction projects, and further research and efforts are needed to promote its widespread use in the construction market.

  • PDF

A Fundamental Study on The Expression of Initial Strength of Injection Materials for Steel Pipe Multi-Stage Method using Circulating Resources (순환자원을 활용한 강관다단공법용 주입재의 초기강도 발현에 대한 기초연구)

  • Sang-Huwon Song
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.5
    • /
    • pp.557-562
    • /
    • 2023
  • This study reviewed the use of soil injection materials using circulating resources as injection materials for the steel pipe multi-stage construction method. The tests performed were homogel time and homogel compressive strength. The steel pipe multi-stage construction method is an auxiliary construction method for tunnels, and the expression of initial strength after construction is an important factor. The better the strength development in the initial stage, the more it can be used as an injection material suitable for the multi-stage steel pipe construction method. As a result of laboratory test, it was found that the homogel time of the injection material using circulating resources required more time than the mixing ratio using cement as the injection material. In addition, it was found that the initial strength curing time satisfying 2MPa was required for more than 24 hours. Therefore, it was confirmed that the injection material using recycled resources required a longer initial curing time than cement of the same mixing ratio.

A Study on the Amount of the Energy Consumption and $CO_2$ Emission at the Construction Stage in the Apartment Housing using the Input-Output Analysis (산업연관분석을 이용한 공동주택 건설단계의 에너지소비량 및 이산화탄소배출량 산정연구)

  • Kim, Dae-Hee;Kwon, Bo-Min;Choi, Young-Oh;Lee, Kang-Hee
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2006.11a
    • /
    • pp.275-280
    • /
    • 2006
  • The protection of the environment is one of today's key demanding international activities and interests. All of aspects including industry, economy and society should be changed into environmental friendly industries. The building is not exception in this trend. What is not generally realized is that building, in the lifecycle of construction, use and demolition, account for large construction, not considered with environment impact and conservation in the lifecycle. Expecially, the construction materials and components used in the construction stage has much embodied energy. And much $CO_2$ emit on the production of the construction material and component. The energy use and $CO_2$ emission would continuously diminish the limited natural resources and impact the environment such as ozon layer destruction. In this paper, it studied the estimation of the amount of energy use and $CO_2$ emission in the building construction stage, it would provide the estimation process and applied with the multifamily housing.

  • PDF

Necessity Review of IPD(Integrated Project Delivery) for Free-Form Building in Domestic (비정형건축물의 IPD(Integrated Project Delivery) 도입 필요성 검토)

  • Kim, Sung-Jin;Park, Sung-Jin;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.308-309
    • /
    • 2014
  • A lot of very complex free-form buildings such as Seoul City Office and DDP(Dongdaemun Design Plaza) have been recently built nowadays in domestic. However, as construction methods and cost data are decided without enough discussion and collaboration with specialized subcontractors during design stage, construction quality problems and cost overrun of the free-form buildings are thus occurred during construction stage. Therefore design system and process or contract and ordering system should be developed participating the specialized subcontractors during design stage in order to perfect the free-form design and construction. Especially US has thus an effort to apply IPD(Integrated Project Delivery) system which can solve the problems of construction quality, productivity decrease and cost overrun by constructing the buildings based on exact drawings and collaboration as well as activating BIM(Building Information Modeling). Therefore this study reviews cases of the free-form buildings in domestic and then presents necessity review of IPD in domestic.

  • PDF

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

PERFORMANCE EVALUATION FRAMEWORK FOR ENGINEERING CONSULTANTS OF TAIPEI RAPID TRANSIT SYSTEMS

  • Chien-Hui Sun;Nie-Jia Yau
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.426-431
    • /
    • 2011
  • The quality of performance evaluation on engineering consultants that provide design-related technical services is difficult to be measured, and only a handful of papers discussed the quality during the design stage. Although design cost is relatively far less than construction cost for a project, the decisions made in the design phase have a significant impact on the final products of the project, especially for large public construction projects. Therefore, this research focuses on reviewing and then establishing a performance evaluation framework for the consulting firms that execute detailed design and provide technical services for the Taipei Rapid Transit Systems (TRTS). By interviewing experts, this study first established a set of indicators to evaluate these firms' performance. Then, those indicators were incorporated into the four aspects of balanced scorecard (BSC) to establish the architecture of the evaluation mechanism. The weight of each indicator was calculated by analytic hierarchy process (AHP) from a survey conducted among experts. The results showed that the top-three indicators were quantity take-off, functions conformity, and budgeting. The framework of performance evaluation established by this study can be applied to measure service performance during the design stage. It not only facilitates the monitoring of consulting firms, but also helps to reduce unnecessary change orders and disputes during the construction stage.

  • PDF

Development of Checklist to Prevent Claim through Dispute Case Analysis of Public Construction Projects (공공공사의 분쟁사례 분석을 통한 클레임예방 체크리스트 개발)

  • Shin, Chang-Joon;Kim, Yoon-Kyum;Cho, Kyu-Man;Hyun, Chang-Taek;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.13-22
    • /
    • 2011
  • Many studies on cause and prevention of claim have been carried out but they were mostly intended to come up with the improvement measures, improvement system or the measures to deal with the claim, which consequently lacked the substantial ways to identify the details of claim for prevention purpose. That is, there's in fact no tool, in preparation for potential claims, to identify and review the major potential causes at design stage to mitigate the claim and thus, it's necessary to develop the tool such as checklist needed to prepare the claim-supporting documents, check the relevant laws as well as to identify the cause of claim. Hence the study, given the fact that cause of claim is mostly generated at the design stage though the claim itself tends to occur at the construction stage, was aimed at developing the checklist based on contract document such as design documents at design stage for public construction projects in a bid to prevent the potential claim occurred at the design stage.

Construction Stage Analysis of Extradosed PSC Box Bridges (Extradosed PSC Box 교의 시공단계해석)

  • 윤군진;이완수;이종신;김성찬
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.347-354
    • /
    • 2001
  • Extradosed PSC Box bridges, newly emerging type of structures in construction market, have a characteristic in that external tendons are used for strengthening PSC Box girder like stay cables in cable stayed bridges. In this study, a series of constructions stage analysis procedure, including initial shape analysis, backward analysis and forward analysis, have been performed in order to investigate long-term behavior of extradosed PSC box bridges, using PCCAP-a computer program for time-dependent stage analysis of PSC cable stayed bridges. CEB-FIP 1978 model was used for the consideration of time-dependent effect of concrete material. Showing the validity of the analysis results with RM SPACE FRAME, it has been confirmd that time-dependent effects become less consequential as the stiffness of girder becomes larger.

  • PDF

A Study of the Decision Making System in adopting Off-Site Construction Method in the Initial Stage Considering the Building Project Characteristics -Focused on Structure Work of Apartment Housing- (건축 프로젝트 특성을 고려한 초기 단계에서의 Off-Site Construction 공법 도입 여부 의사 결정 시스템 개발 - 공동주택 골조공사 중심으로 -)

  • Lee, Sungho;Cha, Heesung;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.89-97
    • /
    • 2022
  • Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) method rather than the conventional on-site construction as an alternative. Despite the importance of decision making in the early stage of the adoption of OSC, there is a lack of methodologies for rational decision making. In this study, a decision making system has been developed to derive the final construction cost score by deriving the project characteristics, selecting the construction difficulty index, and developing a cost model for each construction method alternatives to calculate the standard construction cost. Using this system, the OSC method can be effectively evaluated in terms of its feasibility in the early stage of construction