• Title/Summary/Keyword: Stage construction

Search Result 2,336, Processing Time 0.027 seconds

A Study on the Construction Methods of Sealer of Injection Type for Leakage Maintenance for Water Leakage and Cracks in Concrete (콘크리트 누수균열의 유지관리를 위한 누수보수용 주입형 실링재 시공방법 연구)

  • Kwon Shi-Won;Oh Mi-Hyun;Kwak Kyu-Sung;Oh Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.87-91
    • /
    • 2006
  • Since water leakage and cracks are not the source of serious problems such as long-term lowering of performance and durability of a stricture, including damages to operating facilities of a structure, damages to internal finishing materials, exhibition, and goods, and pollution of residential environment, they might have led to development of positive coping skills; however, an instant loss of lives or property due to earthquake, explosion, typhoon, or a fire was indeed neglected. In these days, repair materials for leakage cannot help but being taken in temporary way without any noticeable countermeasure. This kind of repair is socially criticized many times that is defective construction even if this costs a lot. It was not arrange the standard for construction methods of sealer of injection type for leakage maintenance, even it has been used various type of construction methods for leakage part. In conclusion, we suggest that the construction methods of sealer of injection type for leakage maintenance for leakage to establish the leakage repairing technology as increase of structure demand. Therefore, it would be possible to provide a stage-by-stage solution by developing systematic research activities among the industry, schools, and research institutes to spread maintenance management techniques globally through technical solution to water leakage and cracks, acquisition of structural safety with prolonged durability for life cycle, reduction of water leakage repair expense s, and so on.

Development Plan of Design for Safety in Construction (설계안전성 검토(DfS) 발전방안)

  • Shin, Ju Yeoul
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.351-356
    • /
    • 2017
  • This study introduces the current status of the design for safety(DfS) introduced as one of the owner - centered construction site safety management plan, and presents the problems and the improvement plan. The design for safety has been shifting from the construction management-oriented safety management to the owner-centered safety management system, The owner has to make the design considering the safety from the design stage centered on the owner. The owner has to review and approve the adequacy of the safety-conscious design and The risk factors that can not be eliminated during design are the system to prevent the disaster at the construction site by planning to eliminate the risk factor when writing the safety management plan that is made at the construction stage. The design for safety system implemented from May 2016 will be further developed to prevent the risk of safety accidents that may occur in construction sites, contributing greatly to the reduction of construction accident. In addition, it suggests ways to develop more efficient and convenient system through continuous hazard finding and system improvement.

Dvelopment of assessment manual for Environmentally friendly Control of Waste in the Army (군 발생 폐기물의 친환경적 관리를 위한 평가 매뉴얼 구축방안)

  • Park Chung-Woo;Suh Sang-Wook;Lee Chan-Sik;Kim In-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.115-121
    • /
    • 2004
  • The purpose of this study is to develop checklist and manual in order to control and manage military construction project in an environmentally friendly way during each stage in construction. The main contents of the study are as follows. 1) Checklists and manual are developed for reviewing the construction project in advance to meet environment codes and regulations during each stage of project. 2) Critical check points of environment management program focused on waste are identified. 3) A new construction paradigm in harmony with sound environment is established through the application of program for proactive waste control. The study also recommends that, as a future research, the development of a web-based manual be developed for more easy applications in general construction project.

Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building (센싱정보를 활용한 초고층 건설용 리프트 최적화 운행 시스템 개발)

  • Shin, Joong-Hwan;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.153-163
    • /
    • 2013
  • As recent buildings have been more higher and larger, construction vertical lifting planning and operation is a key factor for successful project in tall building. Although many studies have been trying to set up a construction lifting planning system at early stage, there's not existing a control real-time lift operation control system with respect to during construction stage. Therefore, In this study, we use the sensor device to collect the lift operating data for improvement of lift operation efficiency and develope optimum lift operating system which can perform real-time analysis. Finally, we verify the efficiency of proposed system through comparison between realtime operating data and simulated data using proposing system. In this paper, the proposed system show more efficient moving line compared with previous system. This can contribute to development of unmanned lift system.

Construction Stage Analysis of Structure Settlement Using Underpinning (언더피닝 공법을 이용한 구조물 침하에 대한 시공 단계 해석)

  • Lee, Jonghyop;Heo, Seungjin;Ok, Suyeol;Lim, Yunmook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3A
    • /
    • pp.131-138
    • /
    • 2012
  • This paper aims to present accurately analytical modeling method for underpinning using uncertainty reduction, obtained from comparison between numerical analysis and Site measuring data during construction and service stages. Combination of various conditions should be considered for using numerical analysis to predict the behavior of the structure accurately, even though complexly considered the conditions, real construction should be secured the stability by applying the actual instrument measurement data because predicted results are including the considerable uncertainty. In order to secure the stability during construction, the real time instrument measurements together with numerical analysis results performed before construction state are complementary used actively. From the results of this study, the significant settlements are occurred not only in underpass structure of adjacent excavation area but also in the permanent steel pipe structures were analyzed. From the site measurement results of underpass settlement, the settlements are occurred in every stages of excavation, furthermore observed tendency is asymmetrical excavation patterns are settled more than symmetrical excavation patterns. The essential consideration points for numerical analysis are construction sequence, the direction of the existing facilities, the methods of elements modeling, the applied factors for nature of material and different results would be occurred depending upon inputting the above factors.

Survey on Transition Process of Construction Sites in Left and Right of Lecture Hall in the Temple of Baekje During the 6~7th Century (6~7세기 백제 사찰 내 강당 좌우 건물지의 변천과정 고찰)

  • Jung, Ja-Young
    • Journal of architectural history
    • /
    • v.19 no.6
    • /
    • pp.137-153
    • /
    • 2010
  • Jeongrimsaji as temple remains of Baekje Sabi period, its re-excavation has been carried three times in full scale. As a result, the buildings in left and right of lecture hall was largely identified in 3 forms. First, layout of small buildings in left and right of lecture hall. Second, layput of corridor in left and right of lecture hall. Third, layout of construction site in the north of corridor in left and right of lecture hall. Above second is included into remains of Gorye, the third is included into remains of Baekje - the remains were almost ruined then. The first form and third form in above is different each other in size of buildings, form of layout, and location. It is important to investigate these points: the time of constructing the buildings; what position have the use and function of the buildings in the temple? ; transition process of layout of the Buddhist temple. In this context, of temple remains in Baekje during the 5~7th century, the cases where construction sites in left and right of lecture hall and construction site in the north of corridor are identified, have been reviewed. Based on this review, the use and function of buildings, their transition process were investigated. The survey results show that small buildings in left and right of lecture hall existed in the middle and later period of the 6th century. During the later 6th century ~ the 7th century, construction site in narrow and long square shape was located in left and right of lecture hall instead of small buildings in the north of corridor. Therefore, it is identified that the aforementioned thing is earlier stage and the latter thing is later stage.

An Analysis on the Perception of Domestic Construction Engineer to Introduce IPD (IPD 도입을 위한 국내 건설기술자의 인식 분석)

  • Song, Sul-Min;Kim, Yea-Sang;Chin, Sang-Yoon;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.72-80
    • /
    • 2011
  • Recently, significance of efficiency in construction projects have been increased. So effective new delivery systems are required to improve project quality and value. Those systems could also reduce period, cost, risk and waste of the construction. Also, as current government aims 'Low carbon and Green growth', it is important to manage integrated supervision from the pre-design stage to the operation stage. In USA, AIA suggested IPD which encourages mutual cooperation among stakehklder to improve the productivity. Therefore, this study analyzes the characteristics of the IPD and deduct Present condition and Perception of Domestic Construction Environment to Introduce IPD.

Application of Activity-Based Costing(ABC) for Modular Construction Quality Management (활동기준원가계산을 이용한 모듈러 건축 프로젝트의 품질관리방안)

  • Lee, Jeong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.485-496
    • /
    • 2022
  • Modular construction projects offer advantageous over conventional construction projects in the area of quality control through factory production. However, as clear standards and definitions for quality control activities have yet to be not established, it is difficult to judge the appropriateness of the scale of quality control costs, and it is also difficult to classify quality control activities by process stage. Therefore, in this study, a method for classifying quality management activities based on activity standards was presented, in addition to a method for classifying quality costs according to the PAF standards to check how effective the costs and activities are for quality control in the future. The findings of this study can be used to define the quality management activities for each stage of the modular construction project in the future, and to develop a database of evidence to determine the appropriateness of cost distribution accordingly.

Research on Innovation Technologies for Zero Carbon: Carbon Dioxide Reduction in Construction and Concrete Industries (탄소 제로화를 위한 혁신 기술 연구: 건설 및 콘크리트 산업에서의 이산화탄소 저감 방안 동향)

  • Kim, Joo-Hyun;Park, Jung-Jun;Kim, Jong-Kyu
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.4_2
    • /
    • pp.549-563
    • /
    • 2022
  • Continuous global warming is causing ecosystem destruction and direct damage to human life. The main cause of global warming is greenhouse gases, which account for more than 90 % of carbon dioxide. The leaders of each country signed the Paris Agreement at the United Nations Convention on Climate Change (UNFCCC) to reduce greenhouse gas emissions. Currently, the total amount of CO2 emitted from South Korea is 664.7 million tons as of 2018, ranking eighth in the world. 37 % of South Korea's total CO2 emissions come from the construction & building field, especially the cement production, which is a construction material. Carbon reduction technologies can be largely divided into four types: carbon reduction (CC), carbon reduction and storage technology (CCS), carbon reduction and utilization technology (CCU), and carbon reduction, storage and utilization technology (CCUS). Overseas, CCUS technology is mainly applied to reduce and store CO2 emitted from construction and construction field. A technology for permanently storing CO2 through mineralization by capturing CO2 and utilizing CO2 into a cement production process was developed, and this technology is applied to the entire cement industry. However, the development of CCUS technology applicable to the cement industry is still insignificant in South Korea. In this study, carbon dioxide reduction technology and methods for reducing carbon dioxide emitted during the cement manufacturing process, which is the main component of concrete mainly used in civil engineering construction, were investigated. Overseas, it has reached the commercialization stage beyond the demonstration stage as a way to reduce carbon dioxide by vomiting carbonation reactions. Accordingly, if carbon dioxide reduction plan technology generated during cement manufacturing is developed based on domestic technology differentiated from foreign technology, it is expected to contribute one more step to the carbon neutrality policy.

A Study on Prediction of Earth Retaining Work Cost in the Project Planning Stage -Focusing on Apartment Construction Projects in Seoul- (사업기획단계에서 흙막이 공사비 예측에 관한 연구 -서울시내 아파트 건설사업을 중심으로-)

  • Lee, Jin-Kyu;Yang, Kyung-Jin;Park, Ki-Hyeon;Kim, Chan-kee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.385-392
    • /
    • 2021
  • In general, earth retaining work in construction works enables the construction of structures, prevents the displacement of the surrounding ground to the maximum extent, and plays an important role in ensuring the safety of the surrounding structures and field workers. The earth retaining work and the construction method differ according to the various ground characteristics, surrounding topographical characteristics, repair environment, and design conditions. In particular, in the case of Seoul city, the environments and ground conditions differ according to the area. This study analyzed the earth retaining work cost mainly for the apartment construction project in Seoul and calculated the approximate earth retaining work cost at the project planning stage. A model was developed to predict the cost of earth retaining work that matches the characteristics of Seoul City and predict the construction cost for earth retaining work. This paper presents the predicted earth retaining work cost using a multiple regression model that applies 10 project outlines as independent variables. The error rate of the prediction result of the earth retaining work cost of the apartment construction project in Seoul using multiple regression models was 10.75%.