SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

건설공사에서의 현금흐름 예측 (CASH FLOW FORECASTING IN CONSTRUCTION PROJECT)

  • 박형근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.35-41
    • /
    • 2002
  • 현금흐름 예측에 대한 많은 자료들은 실제 Tendering Stage(입찰단계) 혹은 Planning Stage(계획단계)의 Model들로서 Feasibility Study를 위한 Cash Flow Forecasting 주였다. 이 Model 들의 기법들은 하나의 Project를 통해서 Cash Flow를 예측하는 Model들이 대부분이고, 예측 방법은 주로 통계적인 접근 방법, 예들 들어 과거 Data를 통해서 Cash Flow 예측 곡선 Model 만들고 Project 유형별 상수나 변수 값을 부여함으로서 예측에 적용하였거나, Fuzzy Technique을 이용하여 Progress와 Cash Flow의 관계를 수식화 한 Model에 관리자의 경험과 판단에 의한 Forecasting Model도 제시되었다. 또한 Cash Flow가 아닌 기성 Flow 및 Cost Flow를 기준으로 한 표준화된 Model이 제시되었다 다른 한편으로는 Schedule과 Cost를 통합한 방법들, 즉, 간단한 주요 Activity와 Cost를 연결한 방법, Activity와 Cost Item과의 연결, 또는 Work Package를 이용한 방법, 마지막으로 좀더 정확도를 기하기 위한 Resource Level까지의 통합을 통해서 Project의 Cash Flow를 예측한 연구들이 이루어 졌다. 그러나 이러한 모든 예측 방법은 실제로 Planning Stage에 Forecasting한 Model로서 현재 진행중인 Project에 적용하기에는 그 정확도면에서 상당히 떨어지고, 대부분의 Model들은 Cash Flow 예측에 가장 중요한 Time lags를 고려하지 않았다. 또한Resource까지 연결은 현장 Engineer들의 많은 작업과 관리를 요구하게 된다. 본 연구는 시공단계에서의 Project의 현금흐름 예측에 관한 연구로서 매출계획과 건설회사의 실행 예산을 이용하여 현금흐름예측을 할 수 있는 Model을 제시하였다. 특히 건설공사의 현금흐름 예측의 중요한 요소인 Cash-Out에 대하여, 공사비 구성요소인 자재, 노무, 중기, 외주, 경비등 각 Resource의 보할(Weights)을 실 공사원가에 따른 보할의 변화와 Resource들의 Time Lag를 적용 기존 연구자의 Model과 다른 Model을 제시하였다. 또한 기존 연구자들의 Model과 비교하여 편리성, 정확도 및 신뢰성이 높은 Model임도 증명하였다.

  • PDF

Determination of structural behavior of Bosporus suspension bridge considering construction stages and different soil conditions

  • Gunaydin, Murat;Adanur, Suleyman;Altunisik, Ahmet Can;Sevim, Baris;Turker, Emel
    • Steel and Composite Structures
    • /
    • 제17권4호
    • /
    • pp.405-429
    • /
    • 2014
  • In this paper, it is aimed to determine the structural behavior of suspension bridges considering construction stages and different soil conditions. Bosporus Suspension Bridge connecting the Europe and Asia in Istanbul is selected as an example. Finite element model of the bridge is constituted using SAP2000 program considering existing drawings. Geometric nonlinearities are taken into consideration in the analysis using P-Delta large displacement criterion. The time dependent material strength of steel and concrete and geometric variations is included in the analysis. Time dependent material properties are considered as compressive strength, aging, shrinkage and creep for concrete, and relaxation for steel. To emphases the soil condition effect on the structural behavior of suspension bridges, each of hard, medium and soft soils are considered in the analysis. The structural behavior of the bridge at different construction stages and different soil conditions has been examined. Two different finite element analyses with and without construction stages are carried out and results are compared with each other. At the end of the analyses, variation of the displacement and internal forces such as bending moment, axial forces and shear forces for bridge deck and towers are given in detail. Also, displacement and stresses for bridge foundation are given with detail. It can be seen from the analyses that there are some differences between both analyses (with and without construction stages) and the results obtained from the construction stages are bigger. It can be stated that the analysis without construction stages cannot give the reliable solutions. In addition, soil condition have effect on the structural behavior of the bridge. So, it is thought that construction stage analysis using time dependent material properties, geometric nonlinearity and soil conditions effects should be considered in order to obtain more realistic structural behavior of suspension bridges.

우리 나라 건설산업의 기술수준 및 기술개발 단계와 건설기술발전 방향 (A STUDY ON THE TECHNOLOGY LEVEL AND ITS DEVELOPMENT STAGE OF KOREAN CONSTRCUTION INDUSTRY)

  • 박병무;이태식
    • 기술혁신연구
    • /
    • 제2권1호
    • /
    • pp.170-190
    • /
    • 1994
  • The importantce of a development of competitiveness in domestic construction industry is growing as some of domestic construction markets is scheduled to open to foreign competing firms with higher level of construction technology and management. A national level of competitiveness in domestic construction industry and firms are partially, but significantly, affected by a technology level and a characteristics of production pattern. The purpose of the study is mainly to analyze and identify a technology level, production pattern and a development stage of R&D activities of domestic construction industry and firms. Based on these findings the study draws on a concluding remarks and derives technology policy implications. Results of analysis in the study impliy that (1) competitiveness of domestic construction firms(industry) in terms of technology level is relatively weak as compare to that of advanced foreign competing firms, (2) degrees of substitution of capital for labor are seemed to be relatively high, (3) R&D (investment) activities of domestic construction firms are generally spread out in forms of import, adjustment and betterment, and (4) only a small number of big domestic construction firms are seemed to afford to R&D investment for research facilities and equipments, but not enough for higher level of R&D man-power. The study suggests that technology policy for construction industry should be based on a fundamental policy directions. For example the increase in size and heightened quality level of R&D man-power should be placed in a top priority in policy agenda. Sound and specific policy items should be developed for planning and design, and maintenace and inspection technology in order to lead domestic industry to compete with foreign firms with full strength.

  • PDF

Selection of Tree History Management System Items for Analyzing the Causes of Landscape Tree Defects in an Apartment Complex

  • Park, Sang Wook
    • 인간식물환경학회지
    • /
    • 제23권3호
    • /
    • pp.347-362
    • /
    • 2020
  • Background and objective: It is difficult to conclusively determine the exact cause of tree defects since multiple causes are involved such as climate change, plantation, tree quality and planting time, construction, planting base, drainage, sunshine conditions, maintenance, and microclimate. The data related to landscaping construction defects are scattered or fragmented by companies and years, but not managed systematically by the defect information management system. Most of the earlier studies associated with tree defects in apartment complexes suggested defect rates after examining tree defects in the completed construction site and proposed fragmentary and subjective conclusions about the causes of defects observed in trees with high defect rates. It is proposed to continue to conduct studies on the establishment and analysis of systematic databases to identify the exact causes of tree defects and measures to improve, and the need to accumulate systematic data in the construction process where many defects arises. This study was conducted to reduce the defects of trees planted in apartment complexes. Methods: Main factors related to tree defects were subdivided based on the results of literature review and a defect investigation at the completion site, and tree history management items were selected and subdivided during the construction stage. Results: The criteria for the preparation of subdivided items were obtained, and the tree history management checklist was written for the site under actual construction and a systematic database was established. Items that are categorized based to the causes of defects include the location of nurseries, date, tree quality, site conditions, planting techniques, microclimates, and maintenance. Conclusion: This study suggested tree history management items based on the tree defects that can be identified at the construction stage and applied them to the selected study site, which differentiates this study from earlier studies. It will be necessary to conduct a comprehensive and objective time series analysis on tree defects that occur over time by continuously monitoring and collecting data after construction.

건설공사장 이동식 방음시설물의 음향특성 (Site Mitigation Plan for Noise Sources from Construction Sites by Developing Movable Noise Barriers)

  • 이성찬;정진연;임정빈
    • 한국소음진동공학회논문집
    • /
    • 제25권1호
    • /
    • pp.58-64
    • /
    • 2015
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is that the almost noise from construction site is high level and some kinds of noise levels are over 100 dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans were developed to reduce different types of construction noises such as breaker work, gang form and asphalt saw. They were applied in site and evaluated noise reduction performance. The test result of site insertion loss was between 4~8 dB depends on the equipment and type of work.

CM의 요소기술을 이용한 프로젝트의 생산능력향상 (The Method Improving the Productivity of a Project through Construction Management Techniques)

  • 윤태권;정재영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.133-136
    • /
    • 2005
  • This study provides the method how to improve the productivity of a project using CM's constitutive methods. Construction industry in Korea was protected by the government and they have been grown with only their construction technology until today. It results Korean Construction is behind the advanced countries in terms of Engineering fields and construction management skills. This study compares the difference between the construction system of Korea and Europe and Asia. And then, it proposes the method how to compete with the other countries. which introduce the CM technique into the construction project in the beginning stage. Hopefully, this study is recognised as the basic strategy to improve the capability of Korean construction management.

  • PDF

Curtain Wall의 특성 및 설계조건에 관한 연구 (A study on the characteristic and designing condition of Curtain wall)

  • 정을규;임칠순
    • 한국건축시공학회지
    • /
    • 제4권3호
    • /
    • pp.125-131
    • /
    • 2004
  • Nowadays, it seems we are in the high time of construction design because development of construction technology widen the option of construction exterior closing materials and deepen the high-tech construction method with all various materials. When we see the flow of construction market, the mainstream is the high-rise intelligent building, which makes the best use of the small midtown area efficently. Therefore, Alum curtain wall is becoming the main material of exterior construction, the concept of which is changing from just a simple window frame to an outer wall which has comprehensive function and capability. As we think of the importance of Curtain wall as a comprehensive outer wall, We should do thorough technical examination and verification at the stage of construction design and plan of carrying out construction.

건설공사장 이동식 방음시설물의 음향특성 (Site mitigation plan for Different types of Construction noises)

  • 이성찬;정진연;임정빈
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2014년도 추계학술대회 논문집
    • /
    • pp.490-494
    • /
    • 2014
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is almost noise from construction site is high level and some kinds of noise levels are over 100dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans are developed to reduce different types of construction noises and it is applied in site and evaluated noise reduction performance in this study.

  • PDF

BIM기반 모듈러 건축의 조립식 벽체 시공 오차율 저감방안에 대한 연구 (A Study on the Reduction Plan About Prefabricated Wall Construction Error Rates for BIM-based Modular Construction)

  • 서봉교;배성재;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.213-214
    • /
    • 2013
  • Recently, modular construction has been begun to introduce actively for improvment of productivity in the construction industry. By the way, the construction technology is being IT through BIM. This is why modular construction needs BIM technology. In this study, we analyze the problems in the current modular construction at factory production stage. The way to extract 3D shop drawings using BIM is suggested to solve this problem.

  • PDF