• Title/Summary/Keyword: Stability of track structure

Search Result 59, Processing Time 0.024 seconds

Parametric Study on the Safety of CWR Track over High-Speed Railway Bridges (매개변수해석을 통한 고속전철교량상 장대레일궤도 안전성 검토)

  • 강재윤;김병석;김영진;박성용;조정래;최은석;진원종
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.1
    • /
    • pp.1-9
    • /
    • 2002
  • Where the track is continuously welded over the bridge, the longitudinal forces will be distributed interactively between the track and the sub-structure by the rail-bridge interaction mechanism. The ratio between the longitudinal forces transmitted in each elements depends on the magnitude of the ballast resistance and the stiffness of the sub-structures. In this paper, the main factors affect on the longitudinal rail force are discussed and the parametric study for the behavior of CWR(Continuous Welded Rail) track was executed. It is concluded that the horizontal ballast resistance and the stiffness of the bridge sub-structure are the significant parameters affecting the stability of the continuous welded rail track.

Experimental Verification of Design Parameters of Track (실측을 통한 궤도설계 파라메타의 검증)

  • Lee Jee-Ha;Hwang Sung-Ho;Na Sung-Hoon;Kim Jung-Hwan;Suh Sa-Bum
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1065-1070
    • /
    • 2004
  • When the track designer analyze the track structure uses many known & unknown parameters. Unknown parameters, equivalent rail support spring factor, unit rail support spring factor, track damping coefficient, should be assumed. Known parameters are section properties (area, section factor, etc), material properties(modulus of elasticity, mass, etc) and track conditions(wheel load, loading conditions, gauge, etc.). In the assumption of track design parameters, some parameters can be overestimated or under estimated. The purpose of this study is to verify design parameters used in track design, in the way of experimental measurements. Data of displacements, banding stresses, loads, accelerations are measurable at track site. From these data, unknown parameters are derived. Compare these assumed and derived parameters, estimate the entire track stability.

  • PDF

A Study on the Reliability of Various Track Recording Data (다양한 궤도틀림 데이터의 신뢰성 검토)

  • Lee, Jee-Ha;Ahn, Sung-Hyuk;Park, Hye-Jong;Kim, Bag-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.435-441
    • /
    • 2011
  • Track geometry changes by traffic loads. The bigger the changes are, the worse the riding comfort and running stability of train. This is so-called track irregularity and is the most important quality parameters of ballasted track. To objectively assess track irregularity, track geometry should be able to be measured. Practically, railway companies in Korea use various track recording equipments to measure track irregularity. But this various equipments output different data due to their geometrical structure even measured at same location. In this report, the correlation of various track recording data used in Korea was reviewed.

  • PDF

Characteristics of Curved Track Behaviors according to Traveling Tilting Train (틸팅차량 주행에 따른 기존선 곡선 궤도의 거동 특성)

  • Park, Yong-Gul;Choi, Jung-Youl;Sung, Deok-Yong;Chun, Dae-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.692-700
    • /
    • 2007
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the curve section, which is vulnerable to accelerated train speed. The analysis of tilting train test running the part of Chungbuk line and Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the movement behavior of each part of track while tilting train, high speed train and traditional train (Mugunghwa and freight train) were running the existing line, wheel load, lateral wheel load, rail bending stress, vertical and lateral displacement of rail and vertical displacement of sleeper were compared and analyzed so as to evaluate the expected impact by tilting train for improving the train speed.

Track Improvement Study Guide for Speed-up Conventional Railway (간선철도 속도향상을 위한 궤도개량 연구방향)

  • Kim, Hwan-Yung;Lee, Dong-Ho;Kim, Si-Chul;Gong, Byung-Gun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2456-2463
    • /
    • 2011
  • Conventional railways are less competitive than other land transportation means in term of speed, and thus users preference and transportation share for rail system are relatively lower than others. For example, most of the conventional lines except the Seoul~Busan corridor run at an average speed of 70 km/h or less, which imposes certain constraints on roles and functions as the trunk lines. In this regard, the speed of the conventional lines should be improved up to 200 km/h to gain competitiveness, promote balanced regional development and lead the era of low carbon green growth. As track system is one of the most important elements for the speed-up, it is critical to come up with optimum technical solutions. Improvement of ballast track structure with efficient track installation can provide structural stability for higher speed and ensure operational safety with lower maintenance efforts. Thus, this study focuses on consequences followed by the speed-up including increase of load imposed on the track and impacts on track components, and provide solutions for track maintenance by analyzing impact on the track structure by speed. Also, it compares ballast and concrete tracks under designing and construction and considers how to meet needs for passengers comfort and environmental requirements as a strategic approach.

  • PDF

Dynamic Behavior Evaluation of Pile-Supported Slab Track System by Centrifuge Model Test (원심모형 실험을 통한 궤도지지말뚝구조의 동적 거동 평가)

  • Yoo, Mintaek;Lee, Myungjae;Baek, Mincheol;Choo, Yun-Wook;Lee, Il-Wha
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.2
    • /
    • pp.5-17
    • /
    • 2019
  • Dynamic centrifuge model test was conducted to evaluate the dynamic stability of the pile-supported slab track method during dynamic railway loading and earthquake loading. The centrifuge tests were carried out for various condition of embankment height and soft ground depth. Based on test results, we found that the bending moment was increased with embankment height and decreased with soft ground depth. In addition, it was confirmed that the pile-supported slab track system could have dynamic stability for short-period seismic loading. However, in case of long-period seismic loading, such as Hachinohe earthquake, the observed maximum bending moment reached to pile cracking moment at the return period of 2,400 year earthquake. The criterion of ratio between embankment height and soft ground depth was suggested for dynamic stability of pile-supported slab track system.

Management Plan of Light Rail Transit System (경량전철 시스템 시험선 운영 방안)

  • Lee, H.M.;Lee, A.H.;Han, S.W.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1657-1659
    • /
    • 2005
  • Test track of the Light Rail Transit(LRT system was developed and organically combined with technologies of power supply system, signal communication system and track structure The purpose of the test track is a acquiring of reliability and stability through a sufficient performance test Therefore, this paper draws up ail management plans for tests of the LRT system

  • PDF

Evaluation on Allowable Vehicle Speed Based on Safety of Track and Railway Bridge (궤도 및 교량 안전성을 고려한 열차 증속가능 속도대역 평가)

  • Bahng, Eun Young
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.145-151
    • /
    • 2018
  • In this study, the track-bridge interaction analysis was performed using an analytical model considering the track structure, thereby taking into account the linear conditions (R=650 m, cant variation $160{\pm}60mm$) and the dynamic characteristics of the bridge. As a result of the study, the allowable speed on the example bridge considered was calculated at 200 km/h based on vertical deflection, vertical acceleration, and irregularity in longitudinal level, but was also evaluated at 170km/h based on the coefficient of derailment, wheel load reduction, and lateral displacement of the rail head. It is considered desirable to set the speed 170km/h to the speed limit in order to secure the safety of both the bridge and the track. It is judged that there will be no problems with ensuring rail protection and train stability in the speed band.

Field Test to Investigate the Thermal Stress of Continuous Welded Rail on High Speed Railway Bridges in Summer Period (고속철도 교량상 장대레일의 하절기 온도응력 계측)

  • Kwark, Jong-Won;Choi, Eun-Suk;Chin, Won-Jong;Lee, Jung-Woo;Kim, Byung-Suk;Kang, Jae-Yoon
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.131-136
    • /
    • 2006
  • Most modern railways, especially the high speed railway tracks, use continuous welded rail(CWR) for the less maintenance. For the CWR track has very few expansion joints, track buckling has always been an unpredictable event and it happens mainly by high compressive stress in rail in summer period. Therefore, it is important to understand the variation of rail stress induced by thermal loads which has direct influence on the rail buckling and stability of railway track. This paper describes the experimental investigation of the variation of rail temperature and stress in a high speed railway track on bridge structure. Field measurement was performed to examine the correlation between the rail temperature and rail stress on the Korean High Speed Railway line. Regression functions were derived from measured data to determine the rail stress f3r an arbitrary rail temperature varies from 20 to 50 degree Celsius.

Dynamic Behavior of Direct Fixation Track on Yeongjong Grand Bridge (영종대교 강직결 궤도구조의 동적거동에 관한 연구)

  • Choi, Jung-Youl;Lee, Kyu-Yong;Chung, Jee-Seung;Ahn, Dae-Hee;Kim, Soo-Hyung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.3
    • /
    • pp.443-448
    • /
    • 2020
  • In this study, field measurements were performed to analyze the effects of train types (AREX, AREX Express, KTX, KTX-Sancheon) and train speeds on the dynamic behavior of the direct fixation track structure on Yeongjong grand bridge by bridge type (truss bridge, suspension bridge). Based on field measurement results, the track impact factor and train running stability (coefficient of derailment, Rate of wheel load reduction, lateral displacement of rail head) are compared with domestic and foreign standards and regulations to influence the dynamic behavior of direct fixation track. As a result, the differences in the dynamic behavior of the direct fixation tracks by the type of bridges of Yeongjong bridge are not significant, but it was analyzed that these were more directly affected by the magnitude of the train load. Therefore, it is necessary to establish the reinforcement plan of the direct fixation track structure on Yeongjong grand bridge in consideration of the increase of the track impact factor and dynamic track force.