• Title/Summary/Keyword: Small-scale development project

Search Result 91, Processing Time 0.029 seconds

Improvement Measures for Projects Subject to Environmental Impact Assessment in Urban Areas

  • CHO, Dong-Myung;LEE, Ju-Yeon;KWON, Woo-Taeg
    • Journal of Wellbeing Management and Applied Psychology
    • /
    • v.5 no.2
    • /
    • pp.43-50
    • /
    • 2022
  • Purpose: The small-scale environmental impact assessment conducted during the development project stage has focused on the preservation of the natural environment centered on non-urban areas, due to the nature of urbanization, health problems for citizens of high-density urban areas have a limitation in that they are relatively neglected. In the case of strategic environmental impact assessment and environmental impact assessment in urban areas, there is no basis for evaluation in urban areas because there are exceptions to be excluded from the target projects or there are no target project regulations for buildings. Therefore, in this research, we examined the problems with the target project such as the current environmental impact assessment, and tried to establish a system improvement plan that can solve them. Research design, data and methodology: After reviewing the current environmental impact assessment-related laws (including enforcement ordinances) and national land planning laws (including enforcement ordinances), exceptions such as environmental impact assessment in urban areas were identified and problems were identified. Based on this, an amendment to the Enforcement Decree was proposed to provide institutional support for the expansion of target projects such as environmental impact assessment in urban areas. Results and Conclusions: Through this research, it is expected that the projects subject to environmental impact assessment on development projects in urban areas directly related to the health of the people will be expanded, and the net function of the environmental impact assessment system will be maximized.

A Study on the Preparation of Distribution Table for Quantitative Evaluation of Small-Scale Environmental Impact Assessment

  • Dong-Myung CHO;Ju-Yeon LEE;Woo-Taeg KWON
    • Journal of Wellbeing Management and Applied Psychology
    • /
    • v.6 no.3
    • /
    • pp.13-18
    • /
    • 2023
  • Purpose: The small-scale environmental impact assessment has been in operation since its implementation in August 2000, and is a system that meets the purpose of sustainable development in consideration of the environment in areas requiring conservation. However, when preparing a small environmental impact assessment report, the contents of the reduction measures are too qualitative, or reports are prepared to simply list the compliance stipulated by individual laws, and the contents of consultations prepared by consultative agencies and review agencies are not much different. In addition, the direction of consultation on development projects for similar locations of the same project type is frequently changed by reflecting the subjective judgment of the consultative officer of the Ministry of Environment (Environment Agency). Therefore, this study attempted to improve the establishment of measures to reduce the existing simple listing of qualitative contents and the inconsistent presentation of review opinions by consultative agencies and review agencies. Research design, data and methodology: The research method extracted absolute evaluation items and relative evaluation items among small environmental impact assessment items, analyzed and presented detailed items, and prepared a distribution table for each section according to the details of the relative evaluation items, and presented them as a table. Results: This study was conducted to derive uniform results with objective indicators in the preparation and consultation process of a small-scale environmental impact assessment. Conclusions: Once a quantitative evaluation is established, the consultant can objectively determine and process the environmental impact.

Analysis of Development Project Conditions and Potential Demand Characteristics in High-Speed Rail Station Areas (전국 고속철도 역세권의 개발 사업여건 및 잠재수요 특성 분석)

  • Bae, Seong-Ho;Ma, Kang-Rae;Kim, Chan-Ho
    • Journal of the Korean Regional Science Association
    • /
    • v.40 no.2
    • /
    • pp.75-89
    • /
    • 2024
  • As the problem of lowering the efficiency of urban services in small and medium-sized cities in the non-metropolitan area intensifies, the necessity of developing a railway station area is being emphasized to form a compressed urban space through regional bases. Although major station areas in large cities are being developed in the form of complex, the analysis of the development location characteristics of the small and medium-sized city station areas is insufficient. The purpose of this study is to analyze the characteristics of development project conditions and potential demand in the high-speed rail station areas across the country, identify the differences in locational characteristics according to the type of city, such as 'metropolitan city', 'large city in non-metropolitan city', 'medium and small city in non-metropolitan city', and find out the appropriate development method. As a result of the analysis, it was analyzed that the 'metropolitan area metropolitan area' has high potential demand and poor business conditions. On the other hand, in the case of the non-metropolitan area, it was analyzed that the 'small and medium-sized city station area' has good business conditions and low potential demand characteristics, and the 'large city station area' has intermediate characteristics. This suggests the need for different development methods in the development of metropolitan and small and medium-sized city station areas. The analysis results of this study show that it is desirable to encourage private participation in large-scale metropolitan station areas, which require large-scale input, to maximize potential demand, and to encourage private participation through public-led projects based on favorable business conditions or development based on regional characteristics.

Promoting Learner Autonomy through the CALL Projects

  • Chong, Larry-Dwan
    • English Language & Literature Teaching
    • /
    • v.9 no.1
    • /
    • pp.1-21
    • /
    • 2003
  • Learner-centered approach has been a recent research focus in the second language acquisition, but few studies have dealt with how to develop learner autonomy, particularly in a computer-assisted language learning environment. The paper first illustrates the importance of promoting learner autonomy in the EFL context and elaborates the three main factors contributing to its development. Then it focuses on how the CALL research project promotes autonomous learning through a small-scale study in Gyeongju University. Both quantitative and qualitative methods have been employed to examine whether in the CALL project learners exercise control over their own learning and evaluate the outcome. The results indicate that due to a flexible syllabus, highly motivating research topics and the network-assisted environment, learners do take responsibility for most aspects of learning and thus the CALL project proves to be a promising approach for autonomous learning.

  • PDF

A Study on Economic Evaluation of Small KSO Field in Indonesia (인도네시아 소규모 KSO 광구의 경제성 평가 연구)

  • Moon, Seo-Yoon;Choi, Youngil;Lim, Jong-Se;Huh, Seung-Kyun;Jeong, Kwang-Seok
    • Journal of the Korean Society of Mineral and Energy Resources Engineers
    • /
    • v.55 no.6
    • /
    • pp.624-634
    • /
    • 2018
  • Indonesia has become a net crude oil importer because of the reduction of a new oil field discovery, and Indonesia is attempting to raise investment funds through the Kerja Sama Operasi (KSO) contract to develop a small-scale field. However, the KSO has a high-risk and low-return contract system for investors, necessitating an economic evaluation to examine the feasibility of the project. This study performed economic evaluation on the development of an Indonesian small-scale field by applying the KSO contract conditions, and identified the major economic parameters through a sensitivity analysis. As a result, the oil price, CAPEX and OPEX were identified as influential factors for economic evaluation. The results also indicate that commercial production in small-scale fields is difficult. In the future, this study can be used as a reference resource for investment in oil and gas development projects in Indonesia.

Feasibility study of LFG-MGT power generation system with $CO_2$ fixation development (농작물의 $CO_2$ 고정화 연계 LFG-MGT 시스템의 타당성 연구)

  • Park, Jung-Keuk;Hur, Kwang-Beom;Rhim, Sang-Gyu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.821-824
    • /
    • 2009
  • LFG-MGT CHP system development project with $CO_2$ enrichment in greenhouses was introduced. LFG is produced from the anaerobic digestion of landfilled waste and it has been utilized for power/heat generation since it contains around 50% of $CH_4$. Utilization of LFG from small scale landfill is also needed as well as large scale landfill. However, due to economy of scale, it is very difficult to develop business model. In this context, combining CHP system with greenhouses is considered as feasible option for LFG utilization. LFG-MGT CHP system with $CO_2$ fixation in greenhouses has been derived as an active greenhouse gas reduction strategy, The focus of the system is beyond carbon neutral LFG utilization to neutral carbon absorption. The system is feasible in terms of direct and indirect $CO_2$ emission reduction with more economical way.

  • PDF

A Study on The Introduction of LID Prior Consultation for Small-Scale Development Projects - Focusing on Cost-Benefit Analysis - (소규모 개발사업의 저영향개발(LID) 사전협의 제도 도입 연구 - 비용편익 분석을 중심으로 -)

  • Ji, Min-Kyu;Sagong, Hee;Joo, Yong-Jun
    • Clean Technology
    • /
    • v.26 no.2
    • /
    • pp.151-157
    • /
    • 2020
  • Rapid urbanization has elevated the risk of urban flooding due to the increase in the impervious surface, causing environmental disasters and environmental pollution problems, such as lowering the groundwater level and increasing water pollution. In Korea, low impact development (LID) techniques have been introduced to minimize these environmental impacts and maintain the water cycle soundness. However, most small-scale development projects are in blind spots because there is no legal basis for rainfall runoff management. Small-scale development projects that increase the surface runoff of rainwater are required to mandate the application of LID facilities in accordance with the polluters' responsibility principle. Therefore, it is necessary to implement a preliminary consultation system for water cycle recovery. This study focuses on the cost-benefit analysis on the application of LID techniques for small-scale development projects. The scale of nationwide small-scale development projects used for cost-benefit analysis were defined as buildings with a land area of more than 1,000 ㎡ or a total floor area of 1,500 ㎡. As a result of analyzing the cost-benefits from the installation of LID facilities, they were found to be much lower than the economic standard value of 1. This might be due to the high cost of facilities compared to the scale of the project. However, considering the overall environmental value of improving the water environment and air quality by the installation of LID facilities and the publicity of reducing the operating cost of sewage treatment facilities, the introduction of a prior consultation for small-scale development projects is inevitable. In the future, institutional and financial support from local governments is required to improve the cost-benefits with the introduction of a prior consultation for small-scale development projects.

Application of Membrane Technology in Japan

  • Minami, Katsuyoshi
    • Proceedings of the Membrane Society of Korea Conference
    • /
    • 1995.10a
    • /
    • pp.58-73
    • /
    • 1995
  • Membrane filtration is a promising technology for efficient solid/liquid separation in water purification. In FY 1991, the Ministry of Health and Welfare, Japanese Government launched a comprehensive research project "MAC 21" for development of membrane technology and its application to public water supply. The project was conducted by the Water Purification Process Association (WPPA), under the supervision of the Institute of Public Health. By the research project from FY 1991 to FY 1993, we confirmed that microfiltration (MF)/ultrafiltration (UF) technology was applicable to water purification and MF/UF was a effective method for the removal of such contaminants as particulate matter and coliforms. The Guideline Committee organized under the Technical Committee prepared a the guidelines on application of membrane system to small-scale public water supplies, based on the results as written above. The guidelines has been published in Dec., 1994 by WPPA.4 by WPPA.

  • PDF

A Study on the Organization and Procedures for Acquiring Power Support System and the Development of Collaborative System (전력지원체계 획득조직 및 절차와 협업체계 발전방안 연구)

  • Kyojoon Choo;Myoungjin Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.304-311
    • /
    • 2023
  • The 4th Industrial Revolution and the continuous development of Science and Technology have also required a speedy business promotion method in the defense industry. Advanced countries including the United States are already boldly innovating the existing high-cost and long-term acquisition system with the highest priority in weapons development to cope with the military rise of Russia and China. The Ministry of National Defense and the Defense Acquisition Program Administration have also recently introduced a quick acquisition system and are applying it to business promotion. In addition, some small-scale projects and weapons systems are being reorganized so that they can be managed by the units demanding them. After an organizational diagnosis of the Project Acquisition Group by the Ministry of National Defense in 2020, it has been reassigned as a subordinate unit of the Army Logistics Command from a direct unit managed by the Army HQ. As a result, problems such as work conflict or redundancy have been identified. In addition, a system has been implemented to shorten the acquisition period by applying a rapid acquisition program in the field of weapons systems by benchmarking the rapid acquisition program of advanced countries. The force support system project process will also need to introduce such a quick acquisition system. In addition, the Ministry of National Defense is considering ways to delegate some weapon systems to each military, which will then carry out tasks ranging from requirements determination to project management. Accordingly, it is now time to expand the organization for the management of the Army's weapons system acquisition project. Therefore, in this paper, the Army Project Acquisition Group was analyzed on its organization, acquisition procedures, and cooperation systems, with presentations of development plans for each field.

Phil-Environmental Tide Land Reclamation and Korean Agriculture (친환경간척농지개발과 우리농업)

  • Heo Yu Man
    • Proceedings of the Korean Society of Crop Science Conference
    • /
    • 2001.09a
    • /
    • pp.59-71
    • /
    • 2001
  • In Korea, It was natural and inevitable to reclaim tidal land for farming due to over-population in small territory. Looking back upon the history of tidal land reclamation in Korea, We can find the first case of it in 13th century KangHwaDo(Island), and also find several records of small scale reclamations of western sea-coast from Korea dynasty to Chosun dynasty. A lot of wide fertile agricultural areas on western sea-coast have been developed through tidal land reclamation for about 1000-year after Korea dynasty. and on these areas, we have produced rice which we live on. An average areas of farming land per capital in korea is only 0.04ha, which is one sixth of global average. For water resources, similarly, capacity of water resources alloted to one person is $11{\%}$ of global average. So, without supplementary water development, we will have suffered from a severe deficiency of water Therefore we must prepare for these predictable short water and food problems. and tidal land reclamation may be suitable alternative to settle these problems. However, tidal land reclamation is a work of closing estuary, intercepting sea water inflow, developing a freshened estuary lake and farming lands etc. therefore it apparently causes a change of ecosystem, water quality and littoral environment. Nowadays, widely recognized the importance of environmental preservation, it is desirable or requested to make phil-environmental and sustainable development minimizing the environmental influence due to tidal land reclamation project. In this paper, the role of tidal land reclamation project in the development process of Korean agriculture was reviewed and the direction of afterwards tidal land reclamation project was suggested.

  • PDF