• Title/Summary/Keyword: Small hydropower resources

Search Result 65, Processing Time 0.034 seconds

Classification and Installation Cases of Small Hydraulic Turbine (소수력용 수차의 종류 및 설치 예)

  • Choi, Young-Do;Kim, You-Taek;Lee, Young-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.503-506
    • /
    • 2006
  • Recently, small hydropower attracts attention because of its clean renewable and abundant energy resources to develop. However, suitable turbine type is not normalized yet in the range of small hydropower and it is necessary to study for the effect ive turbine type. Moreover, relatively high manufacturing cost by the complex structure of the turbine is the highest barrier for developing the small hydropower turbine. Therefore, this study is trying not only, to classify the type of current operating turbines installed in the domestic power plants and turbines supplied in Japan by Japanese manufacturer but also, to examine the practical turbine type and installation site to extract the small hydropower energy effectively.

  • PDF

Pressure and Velocity Distributions of Cross-flow Hydroturbine by Nozzle Shape (노즐형상변화에 따른 횡류수차의 압력과 속도 분포)

  • Lim, Jea-Ik;Choi, Young-Do;Lim, Woo-Seop;Kim, You-Taek;Lee, Young-Ho
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.2833-2838
    • /
    • 2007
  • Recently, small hydropower attracts attention because of its clean, renewable and abundant energy resources to develop. However, suitable turbine type is not determined yet in the range of small hydropower and it is necessary to study for the effective turbine type. Moreover, relatively high manufacturing cost by the complex structure of the turbine is the highest barrier for developing the small hydropower turbine. Therefore, a cross-flow turbine is adopted because of its simple structure and high possibility of applying to small hydropower. The purpose of this study is to examine the optimum configuration of nozzle shape to further optimize the cross-flow hydraulic turbine structure and to improve the performance. The results show that pressure on the runner blade in Stage 1 and velocity at nozzle outlet have close relation to the turbine performance.

  • PDF

Performance Measurement of a Tubular Type Turbine System for Small Hydropower by Field Test (현장시험에 의한 소수력발전용 튜블러수차시스템 성능계측)

  • Hwang, Yeong-Ho;Lee, Young-Ho;Choi, Young-Do
    • The KSFM Journal of Fluid Machinery
    • /
    • v.14 no.6
    • /
    • pp.5-10
    • /
    • 2011
  • Recently, small hydropower attracts attention because of its renewable, clean and abundant energy resources to develop. Therefore, a tubular type hydro turbine is proposed for small hydropower in this study because the turbine has relatively simple structure and high possibility of applying to small hydropower. The purpose of this study is to investigate the performance characteristics of the turbine by field test. Field test iss conducted using one tubular turbine system as well as serial arrangement system by two tubular turbines taking into consideration of actual operation conditions. The results show that efficiency of test turbine changes considerably by the runner vane angle. Best efficiency of one turbine arrangement is higher than that of two turbine serial arrangement.

Characteristics of Small Hydro Power Resources for River System (수계별 소수력자원의 특성)

  • Park, Wansoon;Lee, Chulhyung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.193.1-193.1
    • /
    • 2010
  • Small hydropower resources for five major river systems have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for small hydropower(SHP) plants is established. Monthly inflow data measured at Andong dam were analyzed. The predicted results from the developed models in this study showed that the data were in good agreement with measured results of long term inflow at Andong dam. It was found that the models developed in this study can be used to predict the available potential and technical potential of SHP sites effectively. Based on the models developed in this study, the hydrologic performance for small hydropower sites located in river systems have been analyzed. The results show that the hydrologic performance characteristics of SHP sites have some difference between the river systems. Especially, the specific design flowrate and specific output of SHP sites located on North Han river and Nakdong river systems have large difference compared with other river systems.

  • PDF

Characteristic Analysis of Small Hydro Power Resources for River System (수계별 소수력자원의 특성 분석)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.235-240
    • /
    • 2011
  • Small hydropower resources for five major river systems have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for small hydropower(SHP) plants is established. Monthly inflow data measured at Andong dam were analyzed. The predicted results from the developed models in this study showed that the data were in good agreement with measured results of long term inflow at Andong darn. It was found that the models developed in this study can be used to predict the available potential and technical potential of SHP sites effectively. Based on the models developed in this study, the hydrologic performance for small hydropower sites located in river systems have been analyzed. The results show that the hydrologic performance characteristics of SHP sites have some difference between the river systems. Especially, the specific design flowrate and specific output of SHP sites located on North Han river and Nakdong river systems have large difference compared with other river systems.

  • PDF

Overview and Trend of Small Hydropower Development in Korea (국내 소수력 발전 기술현황과 전망)

  • Lee, Gyeong-Bae;Kim, Young-Gue;Paik, Doo-Hyun;Lee, Eun-Woong
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.762-764
    • /
    • 2003
  • In Korea, over 97% of local energy demand is imported from other countries. And we have to lift the energy independence level up to 5% with replacement energy (renewable energy) such as solar, small hydropower, etc. by 2011 according to the energy agreement made in Kyoto Protocol. So, we proposed some opinions such as the better improvement of small hydropower industry the people' view, cooperation among industry/university/research institutes, remote control/maintenance and goverment's legislature and supporting system etc.

  • PDF

Use of Geo-spatial Information System for the Potential Location Analysis of Small Hydropower.

  • Bastola, Shiksha;Lee, Sangheop;Kareem, Kola Yusuff;Jung, Younghun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.151-151
    • /
    • 2021
  • The alarming climate change impacts are demanding the use of renewable energy sources like never before. Hydropower is one of the most cost-effective and environmental friendly energy technology recognized in the world. Big hydropower projects come up with the requirements of huge investment costs along with environmental impacts, whereas small hydropower(SHP) are considered a best solution for the economical source of energy. SHP, basically Run-of-River (RoR) type plants can be sustainable renewable energy sources and given the nature of perennial rivers flowing from steep gradient and rugged topography, feasibility of such plants is equally high in Nepal. The objective of this study is to determine the primary potential sites for the development of RoR type SHP sites using Geo-spatial Information System(GSIS). The use of GSIS enables precise survey of large area within a short period of time. This study has focused on the determination of locations by establishing defined criterions and methodologies and hence have located multiple locations rather than selecting one best location. The approach is applicable for the rapid initial screening of potential locations and results can facilitate detail feasibility study for the technical and economic analysis of SHP in the basin.

  • PDF

Framework for Optimum Scale Determination for Small Hydropower Development Using Economic Analysis (경제성분석에 의한 소수력 개발의 최적규모 결정 방안)

  • Kim, Kil-Ho;Yi, Choong-Sung;Lee, Jin-Hee;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.12
    • /
    • pp.995-1005
    • /
    • 2007
  • This study presents a framework for optimum scale determination for small hydropower development in a river basin. The framework includes the construction of hydrology and topography data, the simulation of hydropower operation, the economic analysis, and the determination of optimum scale of the small hydropower. The optimum scale of design flow and facility are determined by Net Present Value among economic analysis indices. The investment cost is estimated by the cost function derived from the construction cost of existing small hydropower plants. The benefit from power generation is estimated by the price announced by government. The presented framework is applied to the two potential sites in Cho River basin for the dam and run-of-river type of plants. Finally, the sensitivity analysis for a design flow and scale of the plant is performed for the each site. The usage of the framework presented in the study is highly expected for the estimation of potential hydropower resources or the decision support tool for a proprietor by estimating the optimum scale and economical feasibility in advance.

The Optiunm Design Plan for Small Hydropower Plant Using of Waterpipe (수도관로를 이용하는 소수력의 최적 설계 방안)

  • Lee, Hyoung-Mook;Kim, Ki-Won;Byun, Il-Hwan;Hong, Jeong-Jo;Lee, Eun-Woong
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1728-1730
    • /
    • 2005
  • Many domestic organizations are pushing ahead with small hydropower business to develop a renewable energy. In addition each organization gradually spreads small hydropower business with searching the best site for it. And KOWACO(Korea Waters Resources Corporation) answers a purpose of the government policy to spread the wide use of a renewable energy. This study explains the researching programs for the best development sites for small hydropower generation with using water pipes managed and controled by KOWACO.

  • PDF

Research on the Resources Investigations of Small Hydropower Generation in Northern Gyeong-Buk Area (경북 북부지역 소수력발전 자원조사에 관한 연구)

  • Kim, Jung-Hun;Kim, Dong-Hyun;Hwang, Jong-Kyu;Kim, Sungwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5B
    • /
    • pp.459-466
    • /
    • 2011
  • In this study, the resources investigations of small hydropower generation were carried out for the five proposed sites in northern Gyeong-buk area. They consisted of the discharge measurements, rating-curve, flow duration curves, electricity generation, and economic analysis, respectively. The basic data were suggested to select the optimal small hydropower sites in northern Gyeong-buk area. The sites for Yecheon Gun and Munsu Myeon as a result are the best proposed ones using economic analysis. We considered, however, that the finacial benefit for small hydropower development may be small under 500 kW facility. The optimal proposed site over 500 kW facility was suggested as Yeongyang Gun in this study.