A Study on the Improving Management Method for the Small Projects applying Senior Construction Engineer (고령 건설기술자를 활용한 소규모공사의 공사관리방법 개선방안)

  • Song, Jin-Woo;Jeong, Yong-Sik;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.2 s.16
    • /
    • pp.115-121
    • /
    • 2005
  • The building below standard scales to be built only by constructive report to authorities. Construction law 8 illustrates that supervision should be deployed in all the construction sites at the building which is found to have more than 3 floors and also to have more than loom of total squares in especially outside area of city plan zone. Such a small construction is have a important and the most basic meaning. Many problems were found to occur in all the constructive places which were out of the limit of this law. The construction sites were found to be controlled by public official's visiting without supervisors and designers of architecture. Technique of construction in architecture was found to be not different from that of 1980. The security of employees in construction on sites has a serious problem. Because of choosing ail the materials of the building without a reasonable point. All the building were found to have a law material about inside and outside aspects. The purpose of this study are to examine existing law about a small project and than to analyze the situation of constructive control through questionnaires and interviews with all the supervisors. Based on the data base of engineers who had a great experience in construction sites, The purpose of this study is also to suggest and advise the method of controlling all the items in architecture through on and off line.

A Study on the Gate Review of Small and Medium-Sized Plants (SE 프로세스를 적용한 플랜트의 게이트 리뷰 프로세스 발전 방안)

  • Jin Il, Kim;Choong Sub, Yeum;Joong Uk, Shin;Sang Bae, Lee
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.2
    • /
    • pp.24-39
    • /
    • 2022
  • For the success of the plant project, it is necessary to review the project's progress through technical and business reviews at an appropriate time, such as design and construction, and determine whether to invest or to proceed with the project to manage risks. In particular, since the plant development projects are not mass-produced, trial and error in design and construction can have severe impacts in terms of cost and schedule. To this end, gate reviews are currently being conducted in plants and other industrial sectors, but there are few studies on how to conduct gate reviews suitable for the plant field. In addition, there is little literature to refer to when conducting gate reviews. So, in this study, we present an overall framework that includes the types of gate reviews to be performed and items to be checked in each gate review on small and medium-sized plant development projects in which the owner directly develops and operates plants.

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • v.71 no.2
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

A Study on Current Status and Improvement Plans of Ecosystem Conservation Fund Return Projects (생태계보전협력금 반환사업의 추진 현황과 개선 과제)

  • Cho, Dong-Gil;Kim, Sang-Wook
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.3
    • /
    • pp.63-72
    • /
    • 2010
  • This study was conducted to investigate the current status and the improvement plans of the ecosystem conservation fund return projects. In 2007, there was a reformation of the ecosystem conservation fund system but the fund return projects were not vitalized up until now. In this study, 35 of ongoing and finished fund return projects were investigated on their types, sites, costs, local governments, and time required to return the fund. Through the on-site survey of 9 finished projects (4 biotope, 2 corridor and 3 natural conservation facility projects), construction and management conditions were investigated. The main findings are as follows: Among the five fund return types, 17 cases were biotope restoration projects, 4 cases were ecological corridor projects, and 1 case was a nature replacement project. In the case of project sites, there were 14 cases near schools and public facilities, 8 cases near rivers or streams, and 2 cases near ponds or wetlands. For the construction costs, there were 19 cases (65% of all the projects) that cost less than 300 million won. In terms of the involvement of the local government, most of the fund return projects were concentrated in Gyeonggi province and Ulsan city, and there were some local governments outside of these regions that did not carry out any return projects at all. Lastly, in the case of fund return time required, 35% of the fund returns were completed within 5 months, but the overall average fund return time was 9.8 months. In respond to the above study results, the improvement plans to encourage fund return projects are as follows: To diversify return types and sites, piloting and modeling projects for the representative types and sites should be preceded. To emerge from customary small-scaled projects, incentives to encourage large-scale and ecological networking projects should be considered. In addition, in order to write up business plans for the fund return projects, long-term investigations of at least 2 seasons from spring to fall are necessary. Finally, for the continuous management and maintenance of the ecological fund return sites, easier way for the citizens to actively participate in the projects should be incorporated.

Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project - (갈등지수 산정에 의한 사업기간 및 비용 예측 - 공동주택 재건축사업을 중심으로 -)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.87-94
    • /
    • 2012
  • The apartment reconstruction projects have the proper functions such as residential environment improvement and the new housing allocation system; however, intention of the projects are distorted by the combination of factors, like failure of relocation of the original occupants and income redistribution, speculation in real estate, sharp rise in housing price, disputation between various interested parties, inadequate system and etc and it makes the projects unable to go well. Disputations and litigations are due to spread of the small conflict. As a result of the problems, it could not going smoothly and that lead to increase or stop the period and cost. This study is to estimate the period and cost using the conflict index so as to prevent and solve the problem which is among the conflict in the reverse functions. The conflict index has estimated focus on the conflict impact and the period and cost has been estimated using an variable independent including the conflict index. Also, estimated the conflict index and estimate of the period and cost are able to succeed with a minimum of disputation and money.

4th Industrial Revolution Construction IT Convergence Technology Based Bridge System CFT for Seismic Performance Improvement and Performance Evaluation of Buildings Using Drones (4차산업혁명 건설IT융합기술기반 내진성능향상을 위한 Bridge System CFT 개발 및 드론을 이용한 건축물 성능검토)

  • Kim, Dae-Geon;Jang, Yu-Gyeong;Moon, Won-Kyu;Lee, Da-Sol;Park, Su-Bin;Lee, Dong-Oun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.177-178
    • /
    • 2018
  • Unlike the projects that the government has implemented recently to develop new cities under the New Deal project, Saeddeul Village projects to improve the environment of the city are gaining attention. The problem has been found to be that many of the buildings in Saeddeul Village are still not earthquake-proof by using drones to review the state of the town. It also revealed that after two years of earthquakes, Pilotis structures are the most vulnerable to earthquakes. However, it is suitable for small spaces in the city because it provides parking spaces as well as residential spaces. Accordingly, the focus should be on repair and reinforcement rather than reconstruction. In this study, a concrete-based seismic design and construction method is developed in the columns of the existing pylotis structure.

  • PDF

Improvement of Construction Management Process for the Site Manager in Small Scale Building Construction Project (소규모 건설프로젝트에서 현장관리업무 개선방안)

  • Lee, Da-Un;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.81-87
    • /
    • 2018
  • Since February 2017, site managers in small architectural projects are required by the revised building act. In order to address issues for site managers and to improve project efficiency, system improving methods are surveyed and proposed in this study. The key inspection items in the existing surveillance guidance manual were investigated, and the checklist for site managers for a small to medium sized construction site was analyzed. This study also tries to propose using web-based site management systems for improvement of the utilization of checklists. It is expected that these on-site management systems, along with BIM technology, will be able to monitor the small size building construction project in real time and effectively monitor the various problems occurring on-site.

Analysis of structure stability of Golf structure of truss (골프장 트러스구조 구조안전성 검토사례)

  • Kang, Dong-Gyun;Yoon, Sung-Won;Hong, Hyun-Pyo
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.275-278
    • /
    • 2004
  • This paper focused on problems of design, construction, and maintenance caused by construction implementation processes. They were analyzed through case study of structure safety diagnosis projects. From the case study, it is expected that the introduction of Construction Management from the first stage of procurement will improve construction cost increase or burden on small design company. It strengthens coherent management from design and source contractor selection to build review of responsibility. The coherency will prevent changes in designing or infirm unreliable construction. It is desirable that expert opinions are considered when structure changes and establishment occur and that, if necessary, actions such as source selection, periodic audits, and diagnosis arc checked and fed back to maintenance.

  • PDF

Study on Management Plan of the Financial Supervisory Service According to Increase of Risk of Household Debts (중소형증권사 Project-Financing 우발채무 확대에 따른 금융감독원 관리방안에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.21-33
    • /
    • 2018
  • In 2018, the real estate markets have hardly been transacted according to the government's tight regulations of real estates, and have the high possibility to reach a low hit due to the hike of loan interest rates following the U. S rise of base money rate. The key profits for the large construction companies mainly come from the overseas plant projects and the domestic non-governmental construction projects. They suffered a lot such as the lowering of their credit ratings due to the large losses caused by the frquent design changes and work delay. Even in the domestic non-governmental construction projects, the general business risks are on the rise due to the property marketing moving over to the decreasing phase. The small and medium sized security companies has realized a lot of operaring profits as they participated in the PF market to make up for the losses in the securities trading business. But, now as the housing market is not so good around the nation except Seoul and the financial states of large construction companies are not good enough, they can face the liquidity crisis if there happens the problems in the PF backed securities which they have handled. As Korean economy experienced the crisis in the savings banks before, it is recommended that Financial Supervisory Service proposes the preemptive control method and supervision direction to overcome the crisis.