Proceedings of the Korean Institute of Building Construction Conference
/
2008.05a
/
pp.159-163
/
2008
The trend of Development Projects has been changing through a few recent years. Small-scale development projects in the past were usually for building residences or officetel in a big cities. making lots of profits. These projects made not only lots of profits but also unbalance between the urban centers and the suburbs. So government made some regulations to prevent the things from being worse anymore, planned to develop the country in balance and began to lead large-scale development project such as Inno city and Newtown. At first, in this study, the phases and the characteristics of development project's change will be looked around. And then, after overview about PFV(project financing vehicle) used a lot in large-scale development projects will be seen, the better ways to use PFV in large-scale development projects are going to be proposed by considering the problems in PFV's conformation.
International conference on construction engineering and project management
/
2017.10a
/
pp.328-331
/
2017
The purpose of this study is to derive construction-phase risk factors in SMEs' advance into overseas plant construction projects. For this, construction-phase risk factors were investigated on the basis of the analysis of Korean construction companies, overseas plant industry-related research institutes, and overseas data. In addition, major risk factors were derived from the investigated construction-phase risk factors, and quantitative risk factors and qualitative risk factors were analyzed and derived from these major risk factors, by the use of three rounds of the Delphi analysis.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.1
/
pp.293-303
/
2014
Recent historical unit price is presented by the Korea Institute of Construction Technology (KICT) and it is analyzed by data from large-scale projects. Therefore it has problem applying to small-scale projects. To indicate the problem, the study compared historical unit price of large-case project and small-case project in the case of civil engineering work, building construction, and mechanical facility work. As a result, average historical unit price of small-scale project was 26.6% higher than large-scale project. On the other hand, difference on the labor cost was 18.4%, difference on material cost and overheads were 8.18%. Moreover, the study proposed compensation method to correct to apply recent historical unit price to small-scale project.
Almost accidents in construction sites are occurred by unsafe work conditions and failure making safe environment. As recent construction projects become more complex, various and diversified, So the potential of construction-related accidents is increased as well. Comparing the frequency of construction-related accidents in large-sized construction sites, small-sized construction sites are more vulnerable because of lack of workforce and less effective technology system. Furthermore, the absence of safety committee, poor financial condition leads to lack of safety education, installation of safety facilities, and provision of individual protective equipment, which indicates difficulties handling even basic safety management. Therefore, in order to lower the hazard rate at small-Sized construction sites, it is necessary to proceed with more structural and thorough actions for preventing accidents. In other words, it is necessary to analyze the causes of the accidents at small-sized construction sites, set criteria for safety management, and suggest safety management items according to work classification by evaluating the relative importance of the items.
Korean Journal of Construction Engineering and Management
/
v.15
no.5
/
pp.94-102
/
2014
This study analyzes necessity of expanding construction insurance and estimates required budget. Construction insurance is obliged by National Contract Law and Local Contract Law to protect projet owners and contractors from any unexpected construction risk such as financial losses in construction process. Currently the contracts of design-build and alternate-bid projects as well as PQ project, which are greater than 20 billion won, require the contractors to provide construction insurances in Korea. Insurance premiums are borne by the public project owner. Those contractors whose contract volume is less than 20 billion won burden all risks of projects at their cost. This causes equity problem. Because small-and-medium contractors are discriminated against large contractors since insurance-obliged projects are performed by large contractors and insurance premiums are borne by the public project owner. On the other hands, in all engineering projects, regardless of volume, insurance premiums are borne by the project owner. Therefore current regulation has to be improved, by expanding to all public projects. The average ratio of unobliged projects is 46%, in recent 3 years, prime cost of insurance companies is estimated 0.2%. Moreover considering risks of each construction type, prime cost of unobliged works is estimated as 0.13%. Hence additional necessary budget is estimated to be 2.09 billion won if total volume of public work is 3.5 trillion won. And 2.39 billion won is derived if total volume of public projects is 4 trillion won.
Korean Journal of Construction Engineering and Management
/
v.9
no.5
/
pp.194-203
/
2008
Construction Research and Development (R & D) projects have been begun with the investment of 1.2 billions in 1994 and have been reached to 30 billions in 2004. During this ten-year period, a total of investment for construction R&D amounts to 125.7 billions (Total 418 construction R&D projects). However, the results of each R&D project could not apply to real construction site because each project has been performed by a small size (0.5 billions). In addition to those, the social interest on the construction R&D projects has not been received and those importance has not been recognized. Especially, there aren't still standardized methodologies or weighted measurement data for evaluating research performance of the construction R&D projects up to now. The construction R&D projects has been Invested on the basis of an annual technology demand survey rather than the research performance outcome. Therefore, it is important to establish a qualitative performance measurement model for evaluating construction R&D projects. This paper proposes a new research methodology for analyzing the performance measurement of the construction R&D projects. First of all, the Balanced Score Card (BSC) is used to evaluate the construction STAR technologies selected in this research. The performance items of BSC has been modified as four criteria such as "productivity, "knowledge accumulation," "training of students," and "welfare." The new research methodology developed in this paper is expected to use in establishing resonable construction R&D budget in the future.
As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at $15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).
Korean Journal of Construction Engineering and Management
/
v.14
no.5
/
pp.113-121
/
2013
An expansion into the global market increasingly becomes a buzz world among Construction Management(CM) firms in Korea. The objective of this study is to identify potential obstacles and investigate their nature and implications to CM firms in Korea. The study identified 25 obstacles under 5 categories. Base on a questionnaire survey and interviews with CM experts who have global CM projects experience, the study discusses that while there exist various types of obstacles, a more attention needs to be paid for a small number of major obstacles to minimine risks in overseas CM projects. It also suggests that improving pre-construction management competency through securing CM experts should be listed as a top agenda for Korean CM firms.
Journal of the Korea Institute of Building Construction
/
v.23
no.6
/
pp.831-839
/
2023
This study aims to develop a framework for an accident prediction model leveraging a deep neural network algorithm, specifically tailored for small-scale construction sites. Notably, the incidence of accidents in the construction sector is markedly higher compared to other industries, with a significant contribution from small-scale sites. The challenging nature of construction in urban settings, coupled with the increasing frequency of adverse weather conditions, is likely to escalate accident risks at these sites. Anticipating and mitigating accidents at small-scale construction sites is therefore crucial to decrease the overall industry accident rate. Consequently, this research introduces a Deep Neural Network-based model for forecasting accidents at small-scale construction sites. The framework and findings of this study are poised to serve as a guideline for the safety management of small-scale construction projects, ultimately aiding in the realization of safer, more sustainable construction practices at these sites.
Magazine of the Korean Society of Agricultural Engineers
/
v.15
no.2
/
pp.3031-3038
/
1973
The aggregate materials being scottored in districts of the country were investigated to provide the data to the Consturction worker who are working without quality tests of construction materials in the small scale land consolidation, farm building construction and new village Construction projects in the country. Also results of the survey will be helpful to those who want to devise a succerrful plan in concrete execution by means of specifying a standard and technical treatment of construction materials.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.