• Title/Summary/Keyword: Site productivity

Search Result 520, Processing Time 0.026 seconds

The Productivity and Importance Factors of Workers in Construction Site (국내 건설근로자의 생산성 관련 중요 요인 도출 및 중요도 조사)

  • Jung, Young-Chul;Moon, Joon-ho;Kim, Jin-Dong;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.73-74
    • /
    • 2011
  • Compared to the other industries, construction industry depends many parts of production activities on manpower. And also 3D perception on construction industry and the shortage of motivation in construction workers are the biggest reason to reduce construction productivity. So to solve this problem, the research of factors which affect more to improve the construction workers attitude in construction site will be needed. This research has investigated that the productivity and important factors was divided to economic factors, social factors, psychological factors. The result show that economic factors remain pre-eminent in influencing productivity, but that social factors and psychological factors appear to be of increasing importance in this construction industry.

  • PDF

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

A Study on the Improvement for Productivity of Construction Subcontract (건설 하도급 생산성 개선 방안 연구)

  • Lee Tai Sik;Jung Bo Gun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.337-340
    • /
    • 2001
  • Construction market structure give to third subcontract from contractor that received bid. A general contractor is subcontract to subcontractor that construct final product. When the subcontractor is related with productivity on the site, a study is lack to subcontractor productivity. The property of construction industry include many subcontractor at one project. If a subcontractor will improve productivity, total productivity would improve on the site. We will understand about subcontractor productivity and suggest about productivity method.

  • PDF

Validating Dozer Productivity Computation Models (도저 생산성 연산모델 비교 연구)

  • Kim, Ryul-Hee;Park, Young-Jun;Lee, Dong-Eun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.4
    • /
    • pp.531-540
    • /
    • 2019
  • Existing dozer productivity computation models use different input variables, formulas, productivity correction factors, and experimental data source. This paper presents a method that characterizes the productivity outputs obtained by the PLS model and the Caterpillar model that are accepted as industry standards. The method identifies the input variables to be collected from the site, the performance charts to be referenced, and the formulas and implements them in a single computational tool. This study verifies that the PLS model may replace the manual computational process of Caterpillar model by eliminating reliance on graphics manipulation. Replacing the Caterpillar model with the PLS model and implementing the process as a function contributes to assess the productivity of a dozer timely by encouraging to utilize real-time information collected directly from the site. This study allows researchers and practitioners to effectively deal with the values of productivity correction factors collected from the job site and to control the productivity. The practicality and effectiveness of the method have been validated by applying to a project case.

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site

  • Kwon, Soonwook;Lee, Gaeyoung;Ahn, Dooyong;Park, Hee-Sung
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.45-50
    • /
    • 2014
  • Productivity analysis is the most important and significant method for evaluating management and engineering performance during whole project stage. However, it is very difficult in developing qualitative index to construction industry comparing to other industries. Therefore, analytical hierarchy process (AHP) is one of the methods for overcoming these limitations by checking consistency index using duality comparison. In this study, it is scraped up an application plan and selection for innovative tools by analyzing survey results on tool users and site managers with respect to using Modified-AHP performance measurement method.

A Calculation Model of Site Management Manpower for Apartment Building Construction Project (공동주택의 현장관리 인력 산출모형 연구)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Won, Il-Woo;Joo, Jin-Kyu;Lee, Goon-Jae
    • KIEAE Journal
    • /
    • v.11 no.4
    • /
    • pp.47-54
    • /
    • 2011
  • Construction companies find it increasingly necessary to reduce the cost as the construction market has been suffering from a depression and the industrial environment has been changing fast lately. The cost cut demands the productivity management of the field operations, which can be made feasible by assigning an appropriate number of managers on the construction site. However, previous studies are focused on the labor productivity and construction companies take into account only the revenue per worker in organizing the staff. The purpose of this study is to research the model for calculating the field management manpower in accordance with the characteristic of project and site conditions which are usually considered in the beginning of the construction project. The data about apartment building projects of domestic large constructors and factors related to them were statistically analyzed. The results of this study can be used to calculate the necessary field management manpower in accordance with the characteristic of project.

A Study on the Productivity Analysis of a Building Automation System (건물구조체(建物構造體) 자동화(自動化) 시스템의 생산성(生產性) 분석(分析)을 위한 기초적(基礎的) 연구(硏究))

  • Kim, Chang-Kyu;Song, In-Shick;Lee, Hyun-Soo;Lim, Sang-Chae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.111-115
    • /
    • 2008
  • The productivity is the one of the primary elements to evaluate the new systems performance for building construction along with the economic efficiency, the safety, and the quality improvement. At present the on-site construction automation systems(we will call it as Construction Factory or CF hereafter) is under the development by research group for construction automation of high-rise building. The system includes many sub-systems such as a robotic crane, a construction factory, bolting robots, a building material management system using RFID and so on. In this study we discuss and propose the method to evaluate for these hybrid on-site automation system fundamentally. In future we devise a framework of evaluation modules for the on-site building automation system on the basis of this discuss.

  • PDF

A Study on Productivity of Foreign Labors in Domestic Apartment Construction Site -Focused on Evaluation of Productivity and Productivity Impediment Factor- (건설현장에서 외국인 노동자의 생산성에 관한 연구 -생산성 및 생산성 저해인자 평가를 중심으로-)

  • Choi, Hee-Bok;Shin, Youn-Seuk;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.75-79
    • /
    • 2005
  • The Korean society faces a new issue of accepting foreign workers. Foreign labors in construction industry reached about 400,000 recently. Thus they have become one of the essential resources to fill up insufficient labor supplies in construction industry. And it is important how to manage foreign labors efficiently. However there are few studies focused on this subject. Purpose of this study is to research productivity of foreign labors in the domestic construction site. So investigate the value of foreign labors. Also this study forecast elements effect on foreign labors productivity in the construction industry. And research what element is more important to improve productivity and what element is more difficult to manage. In the result, this study is expected to prospect effective method of foreign labor's management in the domestic construction industry, so contribute to utilize foreign labors more efficiently.

A Study on Productivity Improvement Scheme Through Site Case Study In PSM (현장 사례를 통한 PSM 공법의 생산성 향상 방안에 관한 연구)

  • Lee Tai Sik;Lee Won Yong;Kim Gil Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.541-544
    • /
    • 2001
  • PC Box Girder was constructed by PSM(Precast Span Method) to solve the shortage of the construction period. The site case study was used in the PSM to find the construction productivity improvement. In this case study, main reasons of low productivity were founded unskilled technical engineers and insufficient equipment management winter season concrete curing condition. Productivity improvements are presented by assigning production personnel appropriately, motivation which increased by providing incentives for technical engineers, strictly cooperation of each participant, organizational teamwork, and Promoting productive work condition. Additional method of productivity improvements are continuous improvement of the work methods by considering the feedback on previous work, and continuous training to best handle the site conditions. This study of productivity improvement will help to use the most advantage of the PSM method and desire to successfully plan the future construction performance.

  • PDF