References
- J.S. Won, "An Analysis of the International Competitiveness of Productivity in the Korea", Journal of Korea Institute of Construction Engineering Management, KICEM, Vol. 9, no. 4, pp. 75-83, 2008.
- Y.S. Kim, "Analysis of the Factors Influencing Construction Productivity", Journal of the Architectural Institute of Korea, AIK, vol. 10, no. 10, pp. 267-272, 1994.
- S.H. Park, "A Study on Accuracy Analysis of Based on Work Factor System and Setting-up a Work-time of MODAPTS", Proceedings of Korean Institute of Industrial Engineers (KIIE) Spring Conference, pp. 545-554, 1992.
- H.K. Jung, "A Study on Productivity Analysis on Formworks using Work Measuring Method", Journal of Korea Institute of Building Construction, KIC, vol. 5, no. 4, pp. 131-137, 2005.
- B.S. Yoon, "Quantitative Analysis on Relation between Work Management Method, Condition and Efficiency", Master's Thesis of KwangWoon University, 2010.
- F.B. Gilbreth, "Motion Study: A Method for Increasing the Efficiency of the Workman (1911)", Kessinger Publishing, 2010.
- B.W. Niebel, K. Cho, S. Lee, Y. Cho, "A Case Study for Assembly Line Analysis with MTM", Journal of the Korean Institute of Industrial Engineers, KIIE, vol. 6, no. 1, pp. 39-44, 1980.
- M.N. Lee, "Introduction, Application, and Productivity Evaluation of Advanced Tools", Proceedings of Korea Institute of Construction Engineering Management (KICEM), vol. 11, p. 33, 2011
- H.H. Jo, "A Study on Development of Work-analysis and Evaluation Model on Building Construction", Journal of the Architectural Institute of Korea, AIK, vol. 17, no. 10, pp. 145-152, 2001.
- S.H. Ahn, "A Study on Work Condition Management Method for Improving Work Efficiency, " Journal of the Architectural Institute of Korea, AIK, vol. 24, no. 4, pp. 183-190, 2008.
- H.H. Jo, "A Study on the Motion Analysis and AHP Evaluation Method in Construction Works", Journal of the Architectural Institute of Korea, AIK, vol. 17, no. 2, pp. 1423-1429, 1997.
Cited by
- Optimized AHP to Overcome Limits in Weight Calculation: Building Performance Application vol.144, pp.2, 2018, https://doi.org/10.1061/(ASCE)CO.1943-7862.0001418
- The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique vol.5, pp.1, 2015, https://doi.org/10.6106/JCEPM.2015.5.1.040