This study examined the port expansion plan for the fishery port at the east coast of Korea, in accordance with permission conditions for coastal ports such as a limit on the cargo volume and passenger demand for the coastal tourism belt formation. The site was chosen as a municipal coastal port attracting the new ocean industry and building waterfront zone as a hub of new marine tourism. Two different numerical models (Swan and Bouss 2D) were used. Before applying to the target sea area, some numerical tests were conducted for the variation according to Bouss-2D's strong/weak and nonlinear technique compared to the irregular diffraction of semi-infinite breakwater with a theoretical solution. As a result, there was a difference in strong nonlinearity with breaking waves and it was necessary to experiment with a strong nonlinear analysis technique for the actual site. Two numerical models were applied to the fishery port site and the tranquility of some alternatives were analyzed. The numerical results show the most suitable plan was ALT-1, with satisfied harbor tranquility and reasonable economic sense. The extension of the east breakwater and enlarged turning basin of the F-Land plan have brought generally more stable harbor tranquility than the ALT-1. The result can be used as a reference for the port expansion plan in the future.
International journal of advanced smart convergence
/
v.10
no.3
/
pp.245-256
/
2021
This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.
This paper aims to introduce the Daegwallyeong wind turbine test site which is the first official wind turbine test site in Korea. The current status of test site, the characteristics, the projects performed and future plan of this test site are described. The results of wind condition measurements and monitoring system established by the Kangwon National University are presented. The importance of field test is also commented.
Korean Journal of Construction Engineering and Management
/
v.19
no.6
/
pp.79-85
/
2018
The government and of the Safety and Health Corporation have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce accidents on the construction site. However, the number of disasters on the construction site is increasing every year, Which accounts for more than 80% of the total number of casualties. It is necessary to investigate the implementation status of safety and health management in the field of small-size construction site, and to provide the appropriate technical guidance plan to the relevant work places. Also, it is necessary to reduce the disaster at the small-size construction site, The purpose of this study is Improvement Plan to Enhancing the Effectiveness of Technical Guidance Project for Safety Control of Small Construction Site.
Jeon, Yeo Ryeong;Park, Sang June;Ahn, Seokyoung;Lee, Jong Seh;Kim, Yongmin
Journal of the Korean Society of Radiology
/
v.11
no.1
/
pp.1-8
/
2017
The U.S. NRC establishes a radiological criteria with regard to restricted or unrestricted use of nuclear plant site after decommissioning in NUREG-1757. According to this, a nuclear plant site can be released in a restricted way or unrestricted way only if a licensee demonstrates that the dose criteria is fulfilled after the site decontamination and remediation. In order to prove compliance with the radiological criteria of site release, LTP(License Termination Plan) must include the site release criteria, site characterization, final survey plan with major radionuclides and DCGL(Derived Concentration Guideline Levels), etc. Based on the decommissioning case of Rancho Seco nuclear power plant in the United States, this paper analyzed a method of setting the DCGL that can be applied to Kori NPP Unit 1 which will be permanently disabled in 2017.
Journal of Fisheries and Marine Sciences Education
/
v.17
no.3
/
pp.361-372
/
2005
The purpose of this paper was to examine the status of unlawful actions in the fishing grounds located in the Ki-jang coastal region of Busan, Korea, and to develop an optimal fishing-ground plan that will increase the productivity of fisheries resources. We examined the impacts of important factors influencing the basic environment of the fishing grounds at the study site, as including the physical environmental conditions of water temperature and qualies. In addition, we administered a survey that focused on the necessity of enhanced maintenance of the fishing grounds at this site. As a result, we identified some required management action for the fishing grounds and proposed an optimal fishing-ground plan to increase productivity in the Ki-jang coastal region of Busan.
Journal of the Korea Institute of Building Construction
/
v.8
no.1
/
pp.49-56
/
2008
According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.
Analysis of carrying capacity and site suitability by the systematic application of environmental information an provide a basis for implementing environmentally sensitive and sustainable resource development policies. Based on the availability of public services and environmental and site-specific constraints, a Rural Residential Density Matrix was applied in Santa Cruz County, California, USA to assess the development potential of rural land parcels since 1980. In one case, the Matrix was applied to calculate the allowable development density on a site in Lompico planned for use as a Buddhist retreat center. These calculations revealed higher environmental sensitivity and lower carrying capacity than projected in the proposed plan. Under the constraints of the county's minimum acreage policies and insufficient developable land, the developer cancelled the proposed plan. This example suggests that application of the Matrix at the concept development stage would increase the effectiveness of the prior environmental review and environmental impact assessment (EIA) system in Korea.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.05a
/
pp.116-117
/
2018
The government and the Korea Occupational safety & Health Agency have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce safety accidents at the construction site. However, the number of disasters at construction sites is increasing every year. So analyze the results of the supervision and inspection of the Ministry of Employment and Labor, the projects related to the small-scale construction work of the Safety and Health Corporation, and the technical guidance project of the disaster prevention technology guidance organization. It is also necessary to establish an improvement plan for the disaster reduction of the small-scale construction work site for this project.
Korea Aerospace Research Institute has developed an earth observation satellite and it was launched into its orbit in 2012 by using a foreign commercial launch vehicle. The launch site authority has imposed safety requirements to the spacecraft developer to ensure the safety of the personnel and to protect launch vehicle, spacecraft and facilities from accidents associated with the satellite operation at the launch site. This paper describes the range safety activities implemented for the satellite and supporting equipments during the whole phase of their design, manufacturing/test and operation at the launch site. To ensure the integrated requirements for safety management and design, system safety program plan has been developed. And based upon the plan, spacecraft developer conducted hazard analysis to identify and establish safety requirements to reflect in designs, procedures, operations. The result of the hazard analysis has been complied into safety data packages and it was reviewed by launch site review board at the safety reviews and finally it was approved to launch.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.