• Title/Summary/Keyword: Site construction

Search Result 4,619, Processing Time 0.028 seconds

Quantitative Analysis of Construction Site Layout: A Usability Evaluation Study (건설현장배치 수준의 정량적 평가: 사용성평가 방법을 활용하여)

  • Park, Seonghun;Kim, Tae Wan;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.34-42
    • /
    • 2022
  • Construction site layout is attracting attention as efficient use of construction site space greatly affects the duration and cost of the overall construction. Therefore, there are many studies that automate and optimize construction site layout planning. However, the usability of construction site, which consists of goal variables of the studies, has still been unknown. Therefore, the authors present the evaluation criteria for usability of construction site layout and evaluate the usability of domestic construction sites through user survey. Furthermore, the difference in usability between construction site managers and construction site workers was confirmed. As a result of the survey, domestic construction site layout had a low effectiveness and had the lowest score in the environment category. In addition, construction site workers scored lower overall than construction site managers. Through such usability evaluation results, it contributed to the construction site layout theory by assessing current construction site layout practice and suggesting an improvement direction for automating site layout planning.

A Case Study on Construction Cost Comparison for On-Site Construction and Off-Site Construction of Plant Project (플랜트 건설의 현장시공 및 모듈시공에 대한 공사비 비교 사례연구 - Pipe Rack을 대상으로 공사비 산정 -)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.25-34
    • /
    • 2023
  • The purpose of this study is to calculate and compare construction costs for On-Site Construction and Off-Site Construction in Plant Project. For this purpose, the target for calculating the construction cost was limited to the Pipe Rack(Steel Structure and Piping). The results derived according to the purpose of the study are as follows. 1)The direct construction cost for On-Site Pipe Rack construction was KRW 56 billion, with Steel Structure KRW 25.1 billion and Piping KRW 30.8 billion won. 2)Comparing the rate of change between On-Site Construction and Off-Site Construction, material costs increased by 1.9% and expenses by 192.1%, but labor costs decreased by -9.1%, resulting in a total direct construction cost increase of 8.4%. These results can be used as reference data to check the current status of the increase or decrease in construction costs when constructing Pipe Racks as Off-Site Construction.

Site Mitigation Plan for Noise Sources from Construction Sites by Developing Movable Noise Barriers (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.25 no.1
    • /
    • pp.58-64
    • /
    • 2015
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is that the almost noise from construction site is high level and some kinds of noise levels are over 100 dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans were developed to reduce different types of construction noises such as breaker work, gang form and asphalt saw. They were applied in site and evaluated noise reduction performance. The test result of site insertion loss was between 4~8 dB depends on the equipment and type of work.

Deep learning platform architecture for monitoring image-based real-time construction site equipment and worker (이미지 기반 실시간 건설 현장 장비 및 작업자 모니터링을 위한 딥러닝 플랫폼 아키텍처 도출)

  • Kang, Tae-Wook;Kim, Byung-Kon;Jung, Yoo-Seok
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.24-32
    • /
    • 2021
  • Recently, starting with smart construction research, interest in technology that automates construction site management using artificial intelligence technology is increasing. In order to automate construction site management, it is necessary to recognize objects such as construction equipment or workers, and automatically analyze the relationship between them. For example, if the relationship between workers and construction equipment at a construction site can be known, various use cases of site management such as work productivity, equipment operation status monitoring, and safety management can be implemented. This study derives a real-time object detection platform architecture that is required when performing construction site management using deep learning technology, which has recently been increasingly used. To this end, deep learning models that support real-time object detection are investigated and analyzed. Based on this, a deep learning model development process required for real-time construction site object detection is defined. Based on the defined process, a prototype that learns and detects construction site objects is developed, and then platform development considerations and architecture are derived from the results.

A Case Study on the Quality Management of Construction Site through PDCA Cycle (PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구)

  • Baik, In-Whee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

A Survey for a Development Construction Materials' Construction Site Quality Control Guide (건설자재 현장품질관리 지침 개발을 위한 실태조사)

  • Ko, Eun-Joo;Ko, Eun-Jung;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.1-5
    • /
    • 2008
  • The purpose of this study is to ensure an amicable material quality control in the construction site through investigating a process which can impact the construction material quality. For it, a worker interview and questionnaire survey was conducted through a direct field visit. The visited construction sites are composed of 79% construction site and 21% engineering site. As the respondents of questionnaire survey, the quality control workers were 72% of total respondents. Next, the construction worker, handymen, field representatives and others formed 7%. The interview with the quality control staff was conducted with the items including the construction site quality control guide, incoming inspection and material management. Through this survey, the problems of quality control by progress phase were derived. It could be known that the management and measures by each phase were urgently required. It also was indicated that a selection of low-priced material caused by low price bidding could badly impact the construction and safety. Also, in relation to the opinions such as the insufficient quality control and heavy work-load, the improvements are required. For the effective quality control in the construction site, the material quality control procedures suitable for the phase of construction progress must be presented in the present quality control. Also, the standards for it need to be established.

  • PDF

A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete (투수콘크리트 현장품질관리 지침서 개발에 관한 연구)

  • Ko, Eun-Jung;Goh, Eun-Joo;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.

A study on the Improvement Plan of Construction Site Management In Korea (국내 건설 현장관리업무의 개선방안에 관한 연구)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.137-144
    • /
    • 2002
  • In the modern age. Building is getting higher and larger according to owner and social demands. Now when we are facing the need of the cost down and the reduction of economic loss. In this paper, the characteristics of the present conditions of site management were investigated with the field survey. And The Purpose of this study is to suggest the rational plans of construction planning in site management. The method of site management. however depends on experience of a construction manager. in order to solve this situation, it is necessary to create a method of site management that is adequate for the condition of construction. By cultivating excellent sub contractors, we can expect precise construction with a few experts. improvement in qualify of construction from standardization, computerization of each process. And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize site management work in Korea.

Comparative Analysis of Wastewater Management Technologies for Construction Sites (건설사업장의 수질관리 기술 적용사례 비교분석)

  • Yi, JongChan;Koo, Jakon
    • KIEAE Journal
    • /
    • v.13 no.2
    • /
    • pp.157-162
    • /
    • 2013
  • To deal with the water pollution arising from the construction site, this study raises the issues of management and laws and it suggest the efficient way to reduce water pollution by through the case studies. In order to study, seven cases were selected from "Construction Environmental Management Best Practice Competition" co - sponsored by Construction Association of Korea and Construction Environment Association. As a study result, there are problems that depending on the characteristic of the construction site environment simple alone settling facilities can not handle muddy and dirty water generated by the construction site. However, when the construction site applied improved water pollution control facilities with reflecting the characteristic of muddy and dirty water. The problem can be solved moreover it can achieve exceeded emission standard. Therefore new regulations and management with water pollution control facilities considering characteristic of environment is needed to cope with water pollution arising from the construction site.

Site mitigation plan for Different types of Construction noises (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.490-494
    • /
    • 2014
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is almost noise from construction site is high level and some kinds of noise levels are over 100dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans are developed to reduce different types of construction noises and it is applied in site and evaluated noise reduction performance in this study.

  • PDF