• Title/Summary/Keyword: Site Slope

Search Result 711, Processing Time 0.028 seconds

A Study on the Protection Method of Mine Site Slope Using Mine Green Framework (식생 방틀공법을 이용한 광산사면 보호공법에 관한 연구)

  • Choi, Gwang-Su;Kim, Tae-Heok;Kwon, Hyun-Ho
    • Tunnel and Underground Space
    • /
    • v.19 no.6
    • /
    • pp.526-533
    • /
    • 2009
  • This study presents Mine Green Framework(M.G.F) which can protect the slope of rock and tailings. M.G.F method provides the fiber frame which helps the growth of the plant in the barren site like mined rock slope. M.G.F system consists of the polyester fiber mat, soil, seeds and anchors for the attachment. The optimum rate of filling materials was figured out by many germination tests in order to improve the effect of filling materials and the optimum rate of filling materials was applied in four test sites individually. High rooting rate over 70% was confirmed in all field tests. Especially the moisturizer was the most important component of filling materials and it could make the better condition for the plants.

A Study on the Use of a Continuous Fiber Soil Reinforcement System to Revegetate a Cut Slope (비탈면의 생태복원을 위한 연속섬유보강토의 적용성에 관한 연구)

  • Koh, Jeung-Hyun;Hur, Young-Jin;Lee, Yong-Gu;Kim, Nam-Choon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.3
    • /
    • pp.73-83
    • /
    • 2010
  • A technology using continuous fiber soil reinforcement system for the creation of ecological restoration in a damaged area has been developed and introduced. The continuous fiber soil reinforcement system (Geofiber system) is an environmentally friendly slope protection technique that continuous fiber soil reinforced layers are constructed with green plantation on cut slope. The characteristics of this system in terms of the strength and hydraulic performance, and the vegetation were investigated in this study. The main objectives of this comparative study was to quantify the potential contribution of geofiber system for the revegetation on the cut slope in a damaged area. A Geofiber system was constructed to reinforce the lower layer of slopes and revegetation methods including wood chips were carried out on the upper layer by machineries. The results of monitoring during 3 years on cut slopes were as follows : 1) All the quadrat existed in the proper range for vegetation. 2) Species richness was 4.4 (site-1) and 18.5 (site-2) respectively. 3) The averaged coverage rates of quadrats was 90%. It is remarkable that the continuous fiber soil reinforcement system would be capable of applying to a damaged area and also would serve maintaining a healthier environment for floras. However, it behooves to continue monitoring on succession of vegetation for ecological restoration.

Evaluation of Articular Eminence Morphology in Patients with Spontaneous Temporomandibular Joint Dislocation Using Cone Beam Computed Tomography

  • Kim, Ji Hoo;Park, Hyun-Jeong;Seo, Yo-Seob;Ryu, Ji-Won;Ahn, Jong-Mo
    • Journal of Oral Medicine and Pain
    • /
    • v.47 no.1
    • /
    • pp.27-37
    • /
    • 2022
  • Purpose: This study aimed to broaden our understanding of the predisposing factor and treatment of dislocation by analyzing and evaluating the morphology of the articular eminence (AE) in subjects with temporomandibular joint (TMJ) dislocation using cone beam computed tomography (CBCT). Methods: The subjects were divided into two groups: dislocation (31 subjects) and control (32 subjects). CBCT was used to examine 126 TMJs in 63 subjects (26 males, 37 females). The height, width, and posterior slope of the AE were measured in the parasagittal plane. The posterior slope was measured using the "top-roof line angle (TR angle)" method and the "best-fit line angle (BF angle)" method. The AE on the left side (AEL) and the AE on the right side (AER) of the subjects in the dislocation group were separately analyzed and compared with the control group after taking measurements. The average value of both sides was used when comparing with subjects with bilateral dislocation. Results: Dislocations were more frequent in females (67.7%) than in males (32.3%). The dislocation group showed a gentler TR angle than the control group in the AER and in the average of AE on the both sides (AEB). The same group also showed a wider AE in the AEL and the AER (p<0.05). In subjects with unilateral dislocation, the width of the AE with dislocation was narrower and the TR angle and BF angle was steeper than the other side without dislocation (p<0.05). Conclusions: In subjects with unilateral TMJ dislocation, the posterior slope of the AE is steeper, and the width is narrower at the site of dislocation compared to the site without dislocation. However, in subjects with bilateral TMJ dislocation, AEB were wider, and the mean value of the posterior slope of AEB was gentler than that of the control group.

A study of Improvement on the Road Drainage Poor Site (도로배수 취약구간의 개선방안에 대한 연구)

  • Lee, Man-Seok;Kim, Heung-Rae;Lee, Kyung-Ha;Kang, Min-Soo;Song, Min-Tae
    • International Journal of Highway Engineering
    • /
    • v.13 no.2
    • /
    • pp.125-131
    • /
    • 2011
  • This research aims to investigate the cause of the occurrence of a weak road drainage section scientifically and specifically through a site survey for a poorly drained section occurring due to rainfalls during road operation. This paper deeply reviewed the existing research results and current situation data on the poorly drained sections accumulated in Korea Expressway Corporation in order to investigate the cause of the occurrence of a weak road drainage section, and deeply verified and analyzed the weak sections for the road surface drainage facilities and the other road drainage facilities by visiting the expressway controlled by the 6 local headquarters and 33 branches of Korea Expressway Corporation. As a result of site surveys for the weak road drainage sections, i) in a road surface section, occurrence of ponding in the road shoulder pavement due to slope changes, bad collection of water in the collecting well at a median strip, shortage of road shoulder dike height, and inferior construction, etc. was analyzed to be the main cause of the occurrence of poorly drained sections, and ii) in a road neighborhood section, the occurrence of pavement height difference in a main road and shoulder section due to inferior ditches on a slope and the bad drain age at the inlet and outlet of a culvert due to soil deposits, debris, etc. were analyzed to be the main cause of the occurrence of weak sections. Proposed as a plan to improve the poorly drainage section of road were i)calculation of capacity through material changes at the ditch, enhancement of vertical sections and hydraulic analysis in terms of construction and other aspects, ii)derivation of a combined slope considering a slope and a vertical linearity and maintenance of proper distance between drainage structures in a vertical concave section in terms of geometrical structure, and iii)calculation of the drainage facility installation interval using a minutely rainfall intensity formula and a non-uniform flow analysis technique in terms of hydraulics and hydrologics and prompt removal of rainfalls from the road surface according to a linear drainage method.

Analysis of the Stability and Behavior of a Calcareous Rock Slope During Construction of a Tunnel Entrance (터널출입구 시공에 따른 석회암 사면의 안정성 및 거동 분석)

  • Song, Young-Suk;Yun, Jung-Mann
    • The Journal of Engineering Geology
    • /
    • v.23 no.3
    • /
    • pp.283-292
    • /
    • 2013
  • A calcareous rock slope failed during excavation of the slope for construction of a tunnel entrance. The slope is located at the construction site for widening highway in Yeongwol, Korea. Field surveys, laboratory tests, and numerical analyses were performed to determine the reason for the slope failure. The numerical analysis revealed that the safety factor of the slope before construction of the entrance was less than 1, and that this decreased after construction. After construction of the entrance, the sliding zone of the slope increased and slope stability decreased because the shear strain and plastic zone in the slope over the tunnel entrance showed an increase relative to the lower part of the slope. To enhance the stability of the slope for construction of the tunnel entrance, countermeasures such as rock bolts, rock anchors, and FRP (Fiber glass Reinforced Plastic) grouting were adopted in light of the field conditions. Serial field monitoring performed to confirm the reinforcing effects of the adopted countermeasures revealed a small amount of horizontal deformation of the slope soils, most of the elastic deformation that can regain its former value. In addition, the axial forces of the rock bolt and anchor were more strongly affected by slope excavation during construction of the tunnel entrance than by tunnel excavation or the rainy season, and the axial forces tended to converge after excavation of the tunnel. Therefore, we can confirm that the slope is currently safe.

Rock Slope Monitoring using Acoustic Emission (미소파괴음을 이용한 절토사면계측)

  • Jang, Hyun-Ick;Kim, Jin-Kwang;Kim, Chan-Woo;Kim, Kyung-Suk;Cheon, Dae-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.743-748
    • /
    • 2010
  • The stability forecasting of rock slope is more difficult than soil slope because catching the sign of failure in monitoring is not easy and deformation of the rock is small in failure process. But in the rock slope, there is small deformation like crack propagation in rock itself and it accumulates gradually in failure process. If it is possible to detect the small change in the rock slope, we can know the failure time exactly. Because the individual signal is gathered in the acoustic emission monitoring, it is possible to monitoring the slope if many sound signal is accumulated. Detection test of acoustic emission was performed. Uniaxial, two types of bending test, and two plane shear test were done with various cement paste sample. Wave propagation velocity of uniaxial test sample was increased with curing time. Wave Analysis give us the result that there is a AE sign signal before the failure, the AE count is suddenly increased. And frequency level 125kHz before failure is changed to level 200-250kHz after failure. In two plane shear test we can catch the AE signal and can know the failure type from wave shape. Monitoring test site is tunnel slope in Hongcheon but special signal is not collected.

  • PDF

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF

Prediction of the Optimal Growth Site and Estimation of Carbon Stocks for Quercus acuta in Wando Area (완도지역의 붉가시나무 생육 적지예측 및 탄소저장량 추정)

  • Hwang, Jeong-Sun;Kang, Jin-Teak;Son, Yeong-Mo;Jeon, Hyun-Sun
    • Journal of Climate Change Research
    • /
    • v.6 no.4
    • /
    • pp.319-330
    • /
    • 2015
  • This study was carried out to predict the optimal growth site and estimate carbon stocks of Quercus acuta, evergreen broad-leaved trees in warm temperate zone according to climate change. The criterion for the optimal site prediction was created by quantification method with quantitative and qualitative data, collected from growth factors of stands and environmental factors of survey sites of 42 plots in Q. acuta by study relationship between growth of tree and site environmental factors. A program for the optimal site prediction was developed by using GIS engine tools. To prediction of the suitable growth site of Quercus acuta, developed program in this study applied to Wando in Jeollanam-do, distributing a various evergreen bread-leaved trees of warm temperate zone. In the results from analysis of the optimal site prediction on Q. acuta, the characteristics of the optimal site showed as follows; site environmental features of class I (the best site class for Q. acuta) was defined as 401 ~ 500 m of altitude, $21{\sim}25^{\circ}$ of slope with above hillside, residual of deposit convex of slope type with west of aspect. The area and carbon stocks of optimal site prediction by class for Q. acuta in classI showed 147.1 ha (2.5%), total 316.5 tC/ha, total $1,161tCO_2/ha/yr$ of class I, 2,703.5 ha (46.3%), total 5,817.4 tC/ha, total $21,331tCO_2/ha/yr$ of class II, 2,845.5 ha (48.6%), total 6,123.0 tC/ha, total $2,845.5tCO_2/ha/yr$ of class III and 153.7 ha (2.6%), total 330.7 tC/ha, total $1,213.7tCO_2/ha/yr$ of class IV.

Analysis of the Effect on the Location Evaluation of Golf Course according to the Unit Grid Size applied in the Slope Analysis(In flank of Environment) (경사도 분석에 적용하는 단위격자크기가 골프장의 입지 평가에 미치는 영향 분석(환경적 측면에서))

  • Um, Dae Yong;Lee, Beung Soo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.5
    • /
    • pp.467-475
    • /
    • 2012
  • In this study, the problems were analyzed that derived a different position evaluation results depending on the unit grid size that are applied to the terrain slope analysis conducted to assess the its position and environmental impacts in the prior environment reviewing process of golf course construction projects. For this purpose, the unit grid size were analyzed that can precisely reflect a actual terrain by analyzing the change of a slope percentage according to the change of unit grid size about 12 golf courses is currently in progress of construction work through the environmental consultation or ongoing consultation. And the consultation availability of environmental assessment was reverified by applying the unit grid size derived through this study about a study golf course. In the result of study, the bigger grid size for slope analysis is set, the greatly gradient is changed and the slope ratio of the higher elevation was lowly evaluated in comparison with actual terrain. The analytical result that most closely match the actual terrain was extracted in the case applied $5m{\times}5m$ of the unit grid sizes setting in this study. So, we proposed this study results to the ministry of environment and could be amended the unit grid size of $5m{\times}5m$ as standard for the analysis of slope. Also, if new grid size for site evaluation is applied to the study sites, 4 sites exceed the standard suggested the existing regulations and they are not proper as golf course site in flank of environment.

Yi-dong Basin(KARICO Experimental Site) Rainfall-Runoff Characteristics (이동유역(농기공 시험유역) 강우-유출특성)

  • Park, Jae-Heung;Huh, Yoo-Man
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.427-430
    • /
    • 2003
  • Yi-dong experimental site is operated for research on the rural basin characteristics and accumulation of a long term data by hydrological observation equipments. This basin area is 9,300ha, length 14.4km and slope 0.67%. Hydrological observation network has 3 rainfall meter3, 3 reservoir storage levels and 2 river water levels.

  • PDF