• Title/Summary/Keyword: Site Management Work

Search Result 686, Processing Time 0.037 seconds

Analysis Techniques for Accident Causes of Subcontract Work at Construction Site (전문 건설공사 재해원인 분석 기법에 관한 연구)

  • Son, Ki-Sang;Rhee, Kyung-Yong;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.5
    • /
    • pp.34-42
    • /
    • 2009
  • There are many accident causes related to even an accident. As well four(4) stepped causes of one accident at construction sites are analyzed in the study. First, eleven(11) cause factors are set up at each step such as policy level, management, indirect, direct level which are discussed and determined by field experts with 15year experience or more. Therefore, one direct cause occurred in construction site can be connected to the previous cause than in direct and management, and policy problem of previous management. These questionnaires results are analyzed with three different methods such as weighing level by Delphi technique, correlation analysis, critical pass method. Three different methods show their characteristic to see which subcontract work is more dangerous or not. Subcontract or at a construction site can be use the above three different cases as they need at their site in order to make more effective countermeasures.

A Study on the Effective Management Methods of Craftsmen through Job Environment and Productivity Analysis of Construction Craft Workers (건설기능인력의 업무환경 및 생산성 분석을 통한 기능인력의 효율적인 관리방안에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su;Yi, Dong-Ryul
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.12
    • /
    • pp.173-180
    • /
    • 2019
  • Construction work is a labor-intensive industry, which is required systematic production activities using materials, manpower, and equipment. Among them, manpower resources play a very important role in achieving efficiently production in the organization. Construction work is highly dependent on construction craft workers, and the level of proficiency can be directly related to the construction productivity and quality. However, a rapidly aging construction craft workers in Korea, is being replaced by a foreign construction craft workers because of advoidance of new laborers in the construction site. In the future, if the continuous development and management of construction manpower is not made properly, it may be lead to adverse effects such as setbacks in production, delayed completion, faulty construction, industrial disasters, and decreased productivity in construction site. In this study, it was proposed four important factors for work capacity management of construction craft workers. These were ensuring of physical strength through the health management of construction craft workers, securing of proficiency through career management, ensuring of productivity through work capacity and establing of informatization through work capacity management. By introducing a systematic system, it is possible to improve construction craft workers' professionalism, enhancing the level of welfare, reflecting the realities of labor costs, increasing the quantitative and qualitative levels of construction craft workers, Futhermore it was demanded the continued interest and policy support for the realization of effective management of construction craft workers.

Process Progress Pattern Analysis based on Daily Work Report Analysis (작업일보 데이터 분석 기반 공정 진척 패턴 분석)

  • Ko, Yong-Ho;Shin, Young-Keun;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.156-157
    • /
    • 2016
  • Construction projects have shown a dramatic increase in size and complexity during the recent years that precise management has been recognized as one of key factors leading the project to success. It has been investigated that management in construction sites is generally done based on the experience of site engineers. Such experience based decision making lacks reliability that could bring disastrous results such as delay and cost overruns. The purpose of this study is to suggest a process progress pattern analysis method that is expected to be used as an objective reference for site managers to aid the decision making done regarding process progress management.

  • PDF

A Study on the Smart Construction Technology for Safety Management in Construction Sites (건설현장 안전관리를 위한 스마트건설 기술에 관한 연구)

  • Jung, In-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.297-298
    • /
    • 2021
  • The construction industry is a representative high levels of hazardous work environment, and the number of disasters in the construction industry is the highest compared to other industries. Information & Communication Technology(ICT) convergence technologies are being introduced worldwide, and this study considers ICT-based safety management cases at domestic and foreign, resulting in a list of technologies to recognize and resolve to construction site hazards. Technologies such as 「Development of hazard map considering cause, age, proficiency, type and timing of accident in construction industry」, 「Development of hazard map-based accident prediction platform using AI」, 「Development of smart safety management plan for whole construction work cycle」, 「Development of intelligent safety devices and smart safety equipment for mitigating hazard factors」 were derived as smart construction technologies that could solve this problem.

  • PDF

A Development of Internet-based Image Management System for Collection of Construction Knowledge (건설 현장지식 수집을 위한 인터넷기반의 이미지관리 시스템 개발)

  • Chin Sangyoon;Shin Tae-Hong;Shin Dongwoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.129-136
    • /
    • 2001
  • Advances in new information technology enable practitioners at construction sites to capture image information on overall sites and various work results through digital cameras. Also more and more government agencies and clients are accepting construction site information in a digital format. This research developed an Internet-based construction image information management system for effective construction management and sharing information among project participants. This system named CiMS provides a way to store/search/share site image information by representing the information through the combination of work items, work areas, performing companies, captured dates and purposes. CiMS has been applied in a real construction project for system refinement and verification. It is expected that CiMS can improve the construction site photo management paradigm, and the contents of CiMS can be incorporated into the corporate knowledge database.

  • PDF

Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building (보-기둥구조 PC공동주택 골조공사 작업관계 분석)

  • Kim, Ki-Ho;Kim, Jin-Won;Kim, MIn-Jun;Lee, Dong-Gun;Sohn, Jeong-Rak;Lee, Bum-Sik
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

A Study on the Impact to Safety Management and the Prevention Measure by the Speedy Construction Work (돌관공사가 안전관리에 미치는 영향 및 예방대책에 관한 연구)

  • Ha, Haeng-Bong;Bang, Myung-Seok;Lim, Kyu-Won
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.243-254
    • /
    • 2013
  • Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.

  • PDF

A Study On the Safety Management of construction equipment Using Smart Phone Technology (Focused on poclain and mobile elevated work platform) ("스마트폰" 기반을 활용한 건설장비 안전관리에 관한 연구 (굴삭기, 고소작업대중심으로))

  • Jo, Jeong-Ho;Im, Jae-Chang;Go, Yeong-Uk;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.43-59
    • /
    • 2012
  • As contemporary building construction type is getting higher and deeper,construction equipment usage is getting more, and related fatal accidents are on an increasing trend. In these days, due to the deteriorating construction business circumstance, job finding problem of equipment operator, and dumping contract, equipment lease suppliers are putin jeopardy. In high-rise building construction, especially tower crane, mobile elevated work platform and other High place operation cars among construction equipment cause many critical accidents because of drop supply of construction biding bringing out dumping contract could cause unsafe and poor construction management. Because of this, a method was drawn which could grasp the present state of construction equipment management and manage safety of the equipment more easily for accident prevention by choosing 2 kinds of Construction equipment which cause safety accident frequently among the equipment mainly used in construction site. This study suggested a method about construction equipment safety management using "smart phone" base which could be used in safety management for construction equipment by whomever in construction site. After attachment of QR code included safety checklist, It became possible that site managers could check more efficiently by scanning with their smart phone when they inspect equipment. Moreover, by the construction interested who didn't know what and how they have to inspect could point out unsafe condition in the early stage of equipment entering or take unsafe one out of the site by using new smart phone safety checking system is installed, it became possible that critical accident caused by construction equipment was prevented in advance.

  • PDF

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

Construction Information Process Using Digital Pen -Focused on Defect management System- (디지털 펜 입력 시스템을 활용한 건설 정보 처리에 관한 연구 -하자관리 시스템을 중심으로-)

  • Park, Gyu-Tae;Jung, Young-Chul;Nam, Hyun-Jung;Son, Bong-Ki;Kim, Tae-Hui;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.135-138
    • /
    • 2010
  • In the construction industry, construction management system using information technology has been applied diversely to increase productivity. Although IT device such as PDA, RFID, Barcode, wireless network and web camera has been introduced in construction site, the usage of these device is restricted, because these cause engineer to do additional work. The suggested process using Digital Pen in this study, which can lessen engineer's additional work, get defect data promptly. Also accumulated data is utilized effectively for analyzing construction site. The purpose of this study is to introduce Digital Pen System as a means of construction data acquisition for improving productivity.

  • PDF