• Title/Summary/Keyword: Simulation Method

Search Result 24,280, Processing Time 0.045 seconds

Computation of viscoelastic flow using neural networks and stochastic simulation

  • Tran-Canh, D.;Tran-Cong, T.
    • Korea-Australia Rheology Journal
    • /
    • v.14 no.4
    • /
    • pp.161-174
    • /
    • 2002
  • A new technique for numerical calculation of viscoelastic flow based on the combination of Neural Net-works (NN) and Brownian Dynamics simulation or Stochastic Simulation Technique (SST) is presented in this paper. This method uses a "universal approximator" based on neural network methodology in combination with the kinetic theory of polymeric liquid in which the stress is computed from the molecular configuration rather than from closed form constitutive equations. Thus the new method obviates not only the need for a rheological constitutive equation to describe the fluid (as in the original Calculation Of Non-Newtonian Flows: Finite Elements St Stochastic Simulation Techniques (CONNFFESSIT) idea) but also any kind of finite element-type discretisation of the domain and its boundary for numerical solution of the governing PDE's. As an illustration of the method, the time development of the planar Couette flow is studied for two molecular kinetic models with finite extensibility, namely the Finitely Extensible Nonlinear Elastic (FENE) and FENE-Peterlin (FENE-P) models.P) models.

Evaluating Service System Alternatives via a Computer Simulation-enabled MCDM Framework

  • Deng, Wei-Jaw;Pei, Wen;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • v.8 no.2
    • /
    • pp.100-114
    • /
    • 2007
  • Decision makers in the service industry must effectively cope with queuing problems, service capacity optimization, service efficiency and service quality problems. This study proposes a computer simulation-enabled MCDM framework that integrates computer simulation analysis, Taguchi method, expert opinion and multiple criteria decision making (MCDM) to assist decision makers in coping with decision problems. In this framework, Taguchi method is adopted to reduce the time required for the simulation experiment. Computer simulation analysis is adopted to obtain useful information for rapid decision-making without interrupting actual production. MCDM is used to select the optimal alternative. The illustrative result is extremely promising.

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

Parallel Structure Design Method for Mass Spring Simulation (질량스프링 시뮬레이션을 위한 병렬 구조 설계 방법)

  • Sung, Nak-Jun;Choi, Yoo-Joo;Hong, Min
    • Journal of the Korea Computer Graphics Society
    • /
    • v.25 no.3
    • /
    • pp.55-63
    • /
    • 2019
  • Recently, the GPU computing method has been utilized to improve the performance of the physics simulation field. In particular, in the case of a deformed object simulation requiring a large amount of computation, a GPU-based parallel processing algorithm is required to guarantee real-time performance. We have studied the parallel structure design method to improve the performance of the mass spring simulation method which is one of the methods of implementing the deformation object simulation. We used OpenGL's GLSL, a graphics library that allows direct access to the GPU, and implemented the GPGPU environment using an independent pipeline, the compute shader. In order to verify the effectiveness of the parallel structure design method, the mass - spring system was implemented based on CPU and GPU. Experimental results show that the proposed method improves computation speed by about 6,000% compared to the CPU Environment. It is expected that the lightweight simulation technology can be effectively applied to the augmented reality and the virtual reality field by using the design method proposed later in this research.

The Meaning and Usefulness of Simulation Method for Business Process Reengineering -Focused on the Korean Supreme Court BPR Project (1994-2003)-

  • Hong, Sung-wan;Roh, Tae-hoon;Kang, Sung-min;Lee, Jung-woo;Kang, Ga-na
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2001.10a
    • /
    • pp.170-202
    • /
    • 2001
  • Simulation is used to reduce a risk involved in the new project and decision-making in an organization and to save cost and time by forecasting different situations. The objectives of this research are to acknowledge the need of simulation through the real life sample and to encourage the use of the simulation method in the future consulting project by continuously making the necessary improvements. This research analyzed the effectiveness of the simulation based on the sample use of simulation method in 1994 and 1997 for the BPR project of certification issuance process at the Supreme Court. In order to evaluate the value of the proposed simulation model, we examined the gap, which existed between the simulation result and the operational data collected by visiting the actual sites where AROS (Automated Registry Office System: automation system developed by LG-EDS Systems) is being utilized. We also identified the causes for the existing gap. According to the analysis result, (1) the gap came from the status change of thinking that the concentration of certification issuance request has eased after the computerization, (2) the gap existed in the operational process because they failed to consider the situational factors of each registry office in the simulation model, and (3) lastly the gap came from the difficulty of formulating the mathematical model for predicting the complex and diverse behavior pattern of individuals requesting the certification issuance. In order to narrow the existing gaps, we made a proposal to improve the certification issuance process where software of certification issuance vending machine was upgraded in order to help the people to use the service conveniently, more part time workers were hared when there was a overload of certification issuance request, and the quality of the certification Issuance vending machine is improved, In this research, we examined an efficient way of resource allocation based on the simulation conducted in 1994 and 1997. By reflecting changes since the simulation of 1994 and allocating the clerk and machine based on the predicted results of the simulation, we maximized the efficiency of the certification issuance process. In conclusion, this research examined the future usability of simulation method based on the analysis result and identified the key issues to consider when using the simulation method in the future consulting project.

  • PDF

An Integrated Simulation Method to Support Virtual Factory Engineering

  • Zhai, Wenbin;Fan, Xiumin;Yan, Juanqi;Zhu, Pengsheng
    • International Journal of CAD/CAM
    • /
    • v.2 no.1
    • /
    • pp.39-44
    • /
    • 2002
  • This paper presents a structure and architecture of an integrated simulation method (ISM) to meet the requirements of virtual factory engineering (VFE). Combining CAD, VR and discrete event simulation techniques, the ISM provides static and dynamic simulation functions for implementation of VFE throughout the lifecycle. The static simulation can be used to evaluate the factory layout. The dynamic simulation enables us to evaluate ergonomics of factory, process performance of production system, feasibility of production plan and operation of factory, and to train operators safely, which cover the whole VFE lifecycle. The principles of the key techniques of VFE, including virtual factory data management system (VFDMS), static and dynamic simulation, are also discussed. To demonstrate and validate the ISM, a case study has been carried out in an assembly factory.

A Study on the Efficient Dynamic Memory Usage in the Path Delay Fault Simulation (經路遲延故障 시뮬레이션의 效率的인 動的 메모리 使用에 관한 硏究)

  • Kim, Kyu-Chull
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.11
    • /
    • pp.2989-2996
    • /
    • 1998
  • As the circuit density of VLSI grows and its performance improves, delay fault testing of VLSI becomes very important. Delay faults in a circuit can be categorized into two classes, gate delay faults and path delay faults. This paper proposed two methods in dynamic memory usage in the path delay fault simulation. The first method is similar to that used in concurrent fault simulation for stuck-at faults and the second method reduces dynamic memory usage by not inserting a fault descriptor into the fault list when its value is X. The second method, called Implicit-X method, showed superior performance in both dynamic memory usage and simulation time than the first method, called Concurrent-Simulation-Like method.

  • PDF

A Study On Missile Flight Simulation Method Using the Built-in Memory of Aviation Control Unit (비행제어장치 내장 메모리를 활용한 유도탄 모의비행기법 연구)

  • Kim, Tae-Hoon;Lee, Sang-Hoon;Gong, Min-Sik
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.22 no.4
    • /
    • pp.536-544
    • /
    • 2019
  • During the assembly and function inspection of missile system, flight simulation process is required. In the conventional flight simulation check of missiles, an inertial navigation system simulator was used to transmit the navigation output data acquired in HILS. There are several disadvantages in terms of check configuration complexity and data synchronization when using the simulator. So we proposed a new flight simulation method that utilizes the nonvolatile built-in memory of the aviation control unit. The data processing procedure and operation procedure of the proposed method for type I and type II missiles are presented. And we analyzed the causes of the difference between proposed method result and the HILS result for type II missile. By comparing the results obtained by the experiments using the proposed method with the results of HILS, the validity of proposed method was confirmed.

Second Order Bounce Back Boundary Condition for the Latice Boltzmann Fluid Simulation

  • Kim, In-Chan
    • Journal of Mechanical Science and Technology
    • /
    • v.14 no.1
    • /
    • pp.84-92
    • /
    • 2000
  • A new bounce back boundary method of the second order in error is proposed for the lattice Boltzmann fluid simulation. This new method can be used for the arbitrarily irregular lattice geometry of a non-slip boundary. The traditional bounce back boundary condition for the lattice Boltzmann simulation is of the first order in error. Since the lattice Boltzmann method is the second order scheme by itself, a boundary technique of the second order has been desired to replace the first order bounce back method. This study shows that, contrary to the common belief that the bounce back boundary condition is unilaterally of the first order, the second order bounce back boundary condition can be realized. This study also shows that there exists a generalized bounce back technique that can be characterized by a single interpolation parameter. The second order bounce back method can be obtained by proper selection of this parameter in accordance with the detailed lattice geometry of the boundary. For an illustrative purpose, the transient Couette and the plane Poiseuille flows are solved by the lattice Boltzmann simulation with various boundary conditions. The results show that the generalized bounce back method yields the second order behavior in the error of the solution, provided that the interpolation parameter is properly selected. Coupled with its intuitive nature and the ease of implementation, the bounce back method can be as good as any second order boundary method.

  • PDF

Analysis and Evaluation for Constraint Enforcement System (제한 시스템의 분석 및 평가)

  • Hong, Min;Park, Doo-Soon;Choi, Yoo-Joo
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.2
    • /
    • pp.57-64
    • /
    • 2009
  • Stable and effective constraint enforcement system is one of the crucial components for physically-based dynamic simulations. This paper presents analysis and evaluation for traditional constraint enforcement systems(Lagrange Multiplier method, Baumgarte stabilization method, Post-stabilization method, Implicit constraint enforcement method, Fast projection method) to provide a guideline to users who need to integrate a suitable constraint enforcement system into their dynamic simulations. The mathematical formulations for traditional constraint enforcement systems are presented in this paper. This paper describes a summary of evaluation which consists of constraint error comparison, computational cost, and dynamic behavior analysis to verify the efficiency of each traditional constraint enforcement system.