Computers and automatic equipment are very sensitive to the disturbances such as voltage transients, voltage sag, and harmonics. These disturbances cause them to have a malfunction or fault which brings about damages and losses. UPS (uninterruptible power supply) and SPS(stand-by power supply) have been used to provide the required voltage in a critical load without disturbances. However, UPS has appreciable losses due to the operation of the inverter in full rated power at all times. SPS, although whose inverter losses are smaller than those of UPS, transfers disturbances with a short duration to the load, due to the limited reaction time. In this research, a dynamic voltage compensator, which can make up for the weakness of UPS and SPS, is proposed. The operation of the proposed system was verified by a computer simulation. A hardware scaled-model was fabricated and tested to conform the feasibility of the actual system development.
A self-blast type gas circuit breaker has been studied in this study to improve efficiency of interrupting performance of short line fault(SLF). Hot gas flows of gas circuit breaker have been simulated to evaluate interruption performance using CFD. Design parameters such as various types of expansion chamber and nozzles are suggested by using simulation results. Simulated results and experimental ones are compared with previous (ones that of in under development and with capacitor) GCB. Modified new shape of an expansion chamber and nozzle has been suggested to improve the efficiency of gas flow and to provide guidelines for designing self-blast breaker with a higher interruption capability.
동일한 변압기에서 인출된 서로 다른 선로중 하나의 선로에서 고장이 발생하는 경우 다른 선로에서는 순간적인 전압강하 현상을 경험하게 된다. 이렇게 발생되는 순간전압강하 현상은 비록 선로의 계전기에 의해 사고가 제거되기까지의 짧은 기간동안 지속되지만 기기에 따라서는 막대한 피해를 유발할 수 있다. 예로서, 반도체 공장의 정밀 공정중 순간전압강하가 발생하면 공정이 중단되거나 공정의 재시작등으로 인하여 a가대한 경제적 손실을 유발하게 된다. 또한 각종 정밀기기 등에는 기기의 수명저하를 유발하기도 한다. 본 논문에서는 전력계통에 직렬로 연결되는 인버터 시스템을 이용하여 계통에 전압을 주입함으로서 순간전압강하를 보상할 수 있는 시스템에 관하여 연구하고 운전 알고리즘을 제시하였다. 컴퓨터 시뮬레이션과 실험을 통하여 제시한 운전알고리즘의 유효성을 입증하였다.
본 논문은 LVI 시험기를 개발하여 모델 변압기 및 유입식 변압기에 적용해 LVI 시험 분석기술을 개발하였다. LVI시험기는 본체, 터미널 박스 및 케이블로 구성하였고, ANSI규격에서 요구하는 출력특성을 갖도록 설계 제작하였다. 모델 변압기는 탭들을 만들어 변압기의 권선변형 모델을 만들 수 있도록 하였고, 유입식 변압기는 실제 현장에서 사용되는 3상 변압기이다. LVI 시험기는 펄스폭이 1000 ㎱ 이하의 파두 시간과 펄스 최대 전압 500 V로 제작되었다. LVI 시험기로써 실험을 실시하여 성능을 평가한 결과 측정된 파형 분석으로 권선의 축방향과 반경방향으로의 움직임을 구별할 수 있어 변압기 예방 진단에도 효과가 기대된다.
We have limited the transfer power to capital area below a certain level which is called "The Capital Area Transfer Power Limit", and calculated on every Thursday for the application next week. This level is very important in our network operation, because if this level is not set properly, our power network can be fallen under great danger in case of a fault among the transfer power line. But the calculation procedure for the limit level is so complicated and iterative that it mace us spend much time and do much work. So, when a sudden trip of the related facility to the limit level we can't recalculate the limit level fast enough. And this can drop our network reliability below our standards, therefore our network can be dangerous. To avoid this kind of problems, we have figured out a method to calculate simply the limit level. That method uses the index related to the level. We think this method can make short of the calculation procedures for the level. This paper deals with the simplified method for the calculation of the level limit.
Owing to the increasing number of intelligent homes(or called Smart home), the corresponding cost is much higher. Low voltage circuit breakers are widely used in the intelligent homes to interrupt fault current rapidly and to assure the reliability of the power supply. The distribution of magnetic field induced by arc current in the contact system of molded case circuit breaker depends on the shape, arrangement, and kinds of material of grids. This paper is focused on understanding the interrupting capability, more specifically of the grid and the arc runner, based on the shape of the contact system in the current MCCB. The magnetic driving force was calculated by using the flux densities induced by the arc current, which are obtained by three-dimensional finite element method. There is a need to assure that the optimum design required to analyze the electromagnetic forces of the contact system generated by current and the flux density be present. This is paper present our computational analysis on contact system in MCCB.
Recently, new dispersed power sources such as photovoltaics, wind power, fuel cell etc. are energetically interconnected and operated in the distribution systems, as one of the national projects for alternative energy. This paper deals with the optimal countermeasures for the mal-function of protective devices at primary feeder in distribution systems when new power sources like photovoltaic (PV) systems are interconnected, based on the symmetrical components of short circuit studies. When new power sources are considered to be interconnected to distribution systems, bi-directional power flow and interconnection transformer connection of new power sources may cause the operation problems of protective devices (mainly re-closer), since new power sources can change typical characteristics of distribution systems. Therefore, this paper shows an analysis skill of the mal-functional mechanism of protective relay and proposes the optimal solution for the mal-function problem using the symmetrical components of fault analysis. And, this paper also shows the effectiveness of proposed method by the simulation at the field distribution systems.
For hard rock subsea tunnels the most challenging rock mass conditions are in most cases represented by major faults/weakness zones. Poor stability weakness zones with large water inflow can be particularly problematic. At the pre-construction investigation stage, geological and engineering geological mapping, refraction seismic investigation and core drilling are the most important methods for identifying potentially adverse rock mass conditions. During excavation, continuous engineering geological mapping and probe drilling ahead of the face are carried out, and for the most recent Norwegian subsea tunnel projects, MWD (Measurement While Drilling) has also been used. During excavation, grouting ahead of the tunnel face is carried out whenever required according to the results from probe drilling. Sealing of water inflow by pre-grouting is particularly important before tunnelling into a section of poor rock mass quality. When excavating through weakness zones, a special methodology is normally applied, including spiling bolts, short blast round lengths and installation of reinforced sprayed concrete arches close to the face. The basic aspects of investigation, support and tunnelling for major weakness zones are discussed in this paper and illustrated by cases representing two very challenging projects which were recently completed (Atlantic Ocean tunnel and T-connection), one which is under construction (Ryfast) and one which is planned to be built in the near future (Rogfast).
ALTIBASE 시스템은 메인 메모리를 주 저장장치로 사용하는 관계형 주기억장치 DBMS이다. 본 논문에서는 최근 데이터베이스 응용들의 요구사항으로 부각되고 있는 데이터베이스의 고가용성과 실시간 데이터베이스 시스템의 높은 트랜잭션 처리율을 동시에 보장하기 위하여 ALTIBASE 시스템의 구조에 대하여 기술하고 설계 요소 기술에 대한 성능 분석 및 평가 결과를 보인다. 표준 성능평가 방법인 Wisconsin 벤치마크 테스트 결과 및 TPC-H 성능평가 결과를 통해 전체 시스템의 가용성을 입증한다. 또한 인덱스 관리 기법, 트랜잭션 처리 기법, 이중화 관리 기법 등의 각 설계 요소 기법에 대하여 기존 다른 기법과의 성능 비교를 통해 설계에 적용된 요소기술의 우수성을 입증한다.
태양광 발전은 특성상 간헐성과 불확실성이 항상 존재하기 때문에 정확한 예측은 어려우며, 실시간 발전량 진단을 위한 이상감지 기술이 중요하다. 본 논문에서는 다양한 파라미터의 상관관계를 도출하고 최근접 이웃 알고리즘을 적용하여 정상데이터와 비정상데이터를 분류한다. 두 분류의 결과는 발전 시스템의 결함에 의한 아웃라이어와 구름 등에 의해 단기간 동안 발생하는 부분 음영 및 전체 음영의 일시적인 전력손실을 보여준다. 100kW 발전소 데이터를 대상으로 머신러닝 분석을 수행하여 테스트 결과를 산출하였으며 실제 이상치와 이상치 후보지를 검증하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.