• 제목/요약/키워드: Settlement estimation method

검색결과 126건 처리시간 0.031초

3차원 수치해석을 이용한 RPS 공법의 적용성 평가 (Estimation of RPS Method Using 3-Dimensional Numerical Analysis)

  • 노정민;신은철
    • 한국철도학회논문집
    • /
    • 제9권2호
    • /
    • pp.174-179
    • /
    • 2006
  • Recently, the crossing tunnel has been constructed frequently to connect the separated area by highway and railroad. The construction of crossing tunnel must be progressed while maintaining the existing traffic of the highway as well as railroad. There are many cross funnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross funnelling methods are needed a little volume of concrete and easy to change the direction of cutting shoe during the construction of pipe roof, The 3-dimensional numerical analysis of RPS to consider the arching effect was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

터널굴착에 따른 인접건물 손상위험도 평가시스템 (Tunneling-induced Building Damage Risk Assessment System)

  • Park, Yong-Won;Yoon, Hyo-Seok
    • 한국지반공학회논문집
    • /
    • 제18권3호
    • /
    • pp.51-59
    • /
    • 2002
  • 이 논문에서는 터널막장 주변지반의 3차원적 지반거동을 고려한 인접건물의 손상위험도 평가시스템 개발에 관한 내용을 다루었다 이 시스템은 크게 건물 및 지반정보 모듈, 계측데이터 모듈, 침하평가모듈 및 건물 손상평가모듈로 구성되어 있다. 지반 침하평가 및 건물 손상평가 모듈은 이 시스템의 핵심 모듈로서 Attewell 등(1982)이 제안한 침하평가 모형을 토대로 터널시공으로 인한 침하량 및 범위를 정량적으로 평가한 후, 터널노선에 인접한 건물의 손상위험도를 Mair 등(1996)이 제시한 건물손상 평가방법을 근거로 평가한다. 터널굴착으로 인한 지반거동 평가에서 가장 큰 영향인자인 지반손실률($V_{s}$)또는 최대침하량($w_{max}$)및 변곡점(i)의 위치는 계측자료, 수치 해석 결과 그리고 각종 경험식을 사용하여 자동적으로 계산되도록 구축하였다. 한편, 건물 손상평가는 터널막장의 위치를 변화시키며 임의 구간의 인접건물에 대한 손상위험도 평가가 수행될 수 있는 기능을 부여하였다. 개발된 시스템 검증은 Boscardin과 Cording(1989)이 워싱턴 DC의 매트로 터널에 인접한 2층 조적식 건물의 계측사례를 적용하여 수행하였다.

지반특성을 고려한 연직배수재의 통수능 시험 및 선정 (The Discharge Capacity Test & Vertical Drain Adoption Considering the Ground Condition)

  • 정헌철;신경하;정기문;허집
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2007년 가을학술발표회
    • /
    • pp.373-382
    • /
    • 2007
  • In the vertical drain method, discharge capacity is generally one of the most important factor which affect on the estimation of the drain efficiency. However, adopting the drain considering discharge capacity only is not sufficiently considered method so that systematic criteria for adoption is necessary to choose the most suitable drain. Therefore, this study represents the application method considering behavior of the ground and vertical drain which is coupled together and ground improvement efficiency analyzing various cases of discharge capacity test performed in the recent soft ground improvement projects. According to the analysis, most drains tend to satisfy the required discharge capacity. It presents that deformed shape of the drains and well resistance estimation along the ground settlement, improvement efficiency by water content ratio along the depth and shear strength obtained after ground improvement should be considered altogether with the discharge capacity to select the proper drain. Also, appropriate adoption of drain material considering the ground condition is vital through analyzing the field measured data and comparing the result of the discharge capacity test as various vertical drain materials are being constructed continuously.

  • PDF

간척지 온실기초 보강을 위한 심층혼합처리공법의 허용지내력 및 침하량 산정 (Estimation of Allowable Bearing Capacity and Settlement of Deep Cement Mixing Method for Reinforcing the Greenhouse Foundation on Reclaimed Land)

  • 이학성;강방훈;이광승;이수환
    • 생물환경조절학회지
    • /
    • 제30권4호
    • /
    • pp.287-294
    • /
    • 2021
  • 국가관리 간척지내 원예단지 조성에 필요한 기반기술 중에 하나인, 온실기초 연구가 부족한 실정이며 고사양의 PHC파일을 대체하기 위한 대안을 검토하고자 하였다. 지반개량공법 중 심층혼합처리공법(DCM) 적용시 허용지지력과 침하량 산정을 통하여 온실기초 공법으로써의 적용가능성을 검토하였다. 새만금간척지 농생명용지 1공구 지반조사를 통해 지반 특성을 파악하고, Terzaghi, Meyerhof, Hansen, Schmertmann 이론식을 적용하여 허용지지력과 침하량을 산정하였다. 직경 800mm를 기준으로, 독립 기초 폭과 길이가 3-6m이고, 기초 심도 3-7m 조건에서 허용지지력과 침하량을 검토하였다. 온실기초 심도가 얕고 콘크리트 매트 간격이 넓을수록 시공비가 절감되는 측면을 고려하여 독립 기초 폭과 길이가 4m, 기초 심도가 3m인 경우가 가장 적합한 것으로 판단되었다. 독립 기초 폭과 길이가 4m이고, 기초 심도가 3m인 조건에 대한 해석 결과로 허용지지력은 169kN/m2, 침하량은 2.73mm로 지지력은 이론식 대비 5.6%의 오차를, 침하량은 62.3%의 오차범위를 나타냈다. 향후, 위 검증된 설계 값을 기준으로 구조 시험과 침하모니터링을 통해 신뢰성을 검증하고자 한다. 그 외 나무말뚝, 헬리컬기초 등 유리온실, 내재해형온실에 적용 가능한 기초 공법과의 비교 검증을 통해 각각의 장, 단점을 파악하고 PHC 파일의 대체 가능 유무를 검토할 예정이다. 이는 온실 유형별 시공 공법을 선정하는데 필요한 기초 데이터로 제시될 수 있을 것으로 기대된다.

Shallow ground treatment by a combined air booster and straight-line vacuum preloading method: A case study

  • Feng, Shuangxi;Lei, Huayang;Ding, Xiaodong;Zheng, Gang;Jin, Yawei
    • Geomechanics and Engineering
    • /
    • 제24권2호
    • /
    • pp.129-141
    • /
    • 2021
  • The vacuum preloading method has been used in many countries for soil improvement and land reclamation. However, the treatment time is long and the improvement effect is poor for the straight-line vacuum preloading method. To alleviate such problems, a novel combined air booster and straight-line vacuum preloading method for shallow ground treatment is proposed in this study. Two types of traditional vacuum preloading and combined air booster and straight-line vacuum preloading tests were conducted and monitored in the field. In both tests, the depth of prefabricated vertical drains (PVDs) is 4.5m, the distance between PVDs is 0.8m, and the vacuum preloading time is 60 days. The prominent difference between the two methods is when the preloading time is 45 days, the injection pressure of 250 kPa is adopted for combined air booster and straight-line vacuum preloading test to inject air into the ground. Based on the monitoring data, this paper systematically studied the mechanical parameters, hydraulic conductivity, pore water pressure, settlement and subsoil bearing capacity, as determined by the vane shear strength, to demonstrate that the air-pressurizing system can improve the consolidation. The consolidation time decreased by 15 days, the pore water pressure decreased to 60.49%, and the settlement and vane shear strengths increased by 45.31% and 6.29%, respectively, at the surface. These results demonstrate the validity of the combined air booster and straight-line vacuum preloading method. Compared with the traditional vacuum preloading, the combined air booster and straight-line vacuum preloading method has better reinforcement effect. In addition, an estimation method for evaluating the average degree of consolidation and an empirical formula for evaluating the subsoil bearing capacity are proposed to assist in engineering decision making.

극한상태의 정재하시험결과를 이용한 타입말뚝의 안전율 적용성 평가 (An Applicative Estimation of Safety Factors about Driven Pile Using the Results of Static Loading Test on the Ultimate State)

  • 기완서;박노환;김선학
    • 지질공학
    • /
    • 제19권4호
    • /
    • pp.441-457
    • /
    • 2009
  • 본 연구는 국내 외의 사질지반에 시공된 타입말뚝에 대해 파괴가 현저하게 나타날 때까지 재하한 정재하시험 실측값을 이용하여 극한하중 항복하중 침하량기준의 각각 판정법으로 극한하중을 추정하였다. 추정된 극한하중을 실측된 파괴하중으로 정규화하고 말뚝특성에 따라 판정법별 비교 분석 하였다. 또한 극한하중 추정시 적합한 판정법을 검토하고 허용하중 결정시 안전율을 재평가하여 다음과 같은 결론을 얻었다. 극한하중 판정법으로 구한 극한하중은 Chin 방법에 의해 해석된 값이 실측값 보다 과대평가하는 경향을 나타냈으며 B. Hansen 80%기준과 Stability Plot 방법이 실측치와 거의 일치하여 가장 신뢰성이 있는 방법으로 판단되었다. 허용하중 산정시 극한하중 판정법에 의해 구한 파괴하중에 적용해야 할 안전율을 구조물기초설계기준에 적용된 안전율을 기준으로 환산하면 B. Hansen 90% 방법을 제외하고 3.0보다 큰 값이 적용되어야 할 것으로 판단되었으며 항복하중 판정법들의 경우 기준안전율 2.0보다 큰 값이 적용되어야 할 것으로 판단되었다. 침하량 기준에 의해 구한 하중에 적용해야 할 안전율을 극한하중에 대한 안전율 3.0을 기준으로 환산해 보면, 전침하량 기준 및 순침하량 기준은 3.0보다 작은 값이 적용되어야 할 것으로 판단되었다.

쉴드 TBM의 장비 형상 및 굴진 데이터를 고려한 체적손실 산정 연구 (A Study of Shield TBM Tunnelling-induced Volume Loss Estimation Considering Shield Machine Configurations and Driving Data)

  • 박현구;장석부;이승복
    • 터널과지하공간
    • /
    • 제25권5호
    • /
    • pp.397-407
    • /
    • 2015
  • 본 논문에서는 쉴드 TBM 굴진 중 체적손실 산정과 관련한 기존 사례 및 정량적인 산정 방안에 대한 문헌 분석을 수행하여 장비 형상과 운전 중 주요 기계데이터를 활용한 산정 방안을 도출하였다. 도출된 방안은 기존 문헌에 보고된 토압식 및 이수식 TBM 굴진 사례 분석에 적용되었다. 전반적으로 계측 결과와 잘 부합하는 것으로 나타났으며 일부 차이에 대한 분석을 실시하였다.

연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로 (Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City)

  • 허강국;박형근;안병철;민병욱
    • 대한토목학회논문집
    • /
    • 제36권4호
    • /
    • pp.705-713
    • /
    • 2016
  • 연약지반 공사는 설계단계에서 고려하지 못한 변수들이 시공단계에서 발생되어 구조물의 안정성과 설계변경에 따른 공사비 증가의 원인이 된다. 본 연구는 충청북도 오창지역에 조성되는 산업단지 진입도로 조성구간을 연구대상으로 하며, 연약지반 처리공법으로 암버럭을 이용한 치환공법 및 사용하중을 고려한 과재성토를 연약지반 처리대책으로 선정, 구조물의 안정성 및 공기 단축으로 공사비 절감효과 분석에 목적이 있다. 연구구간의 연약지반 두께는 사질토 및 점성토 연약지반으로 2.4~5.5m로 규모가 작으나 지표하 1.5~5.9m의 지층사이에 불균등하게 분포하며, 침하발생은 크지 않으나 장래 부등침하와 단차 발생이 예상되어 연약지반 처리후 현장 계측결과를 분석하여 장래 침하거동을 예측하였다. 또한, 치환재료는 지역특성 및 경제성을 고려하여 양질토사를 암버럭으로 치환하여 안정성 증가, 공기단축 등으로 공사비 29%를 절감하였다. 본 연구를 바탕으로 향후 제체내 간극수압 소산, 지하수위 변동 등의 예측과 실제 계측된 연약지반의 압밀과의 관계 등에 대한 추가적인 연구를 수행할 경우, 다양한 현장조건에서 연약지반 거동을 정확히 예측할 수 있을 것으로 기대된다.

Mikasa 압밀이론에 의한 준설토지반의 압밀기간 산정에 관한 연구 (Estimation of Consolidation Period for Dredged Soil by Mikasa Theory)

  • 주재우;정규향;조진구
    • 한국지반공학회논문집
    • /
    • 제19권6호
    • /
    • pp.299-306
    • /
    • 2003
  • 준설토지반은 보통 연약지반에 비해 상당히 큰 압밀침하가 발생하기 때문에 압밀과정 중 층 두께의 변화가 크다. Mikasa는 층 두께의 변화를 고려하는 더욱 합리적인 압밀계산법을 연구 발표하였으나 아직 국내 현장에서 많이 활용되고 있지 않은 실정이다. 본 연구에서는 100%, 120%, 133%, 150%의 함수비를 갖는 준설토 지반에 대해 Rowe cell 압밀시험기를 이용한 시험을 수행하여 준설토의 압밀특성을 분석하였으며, 층 두께의 변화를 고려하지 않는 경우와 층 두께의 변화를 고려하는 경우 각각 압밀계수를 구하여 비교하였다. 또한 실제 현장 예를 상정하여 압밀기간을 구하여 보았는데, 그 결과 압밀기간은 층 두께의 변화를 고려한 Mikasa 이론의 경우가 그렇지 않은 Terzaghi이론의 경우보다 짧게 산정되었다. 그리고, 더욱 정확한 결과를 주는 Mikasa이론이 실용적으로 이용될 수 있도록 압밀계산법에 대해 자세히 언급하였다.

굴착방법에 따른 구조물의 손상도 평가 (Damage assessment of structures according to the excavation methods)

  • 전재현;박종덕;임영덕;이석원
    • 한국터널지하공간학회 논문집
    • /
    • 제15권2호
    • /
    • pp.161-173
    • /
    • 2013
  • 도심지와 같이 개발가능한 지역이 제한되어 있으면 기존 건물에 인접하여 지반을 굴착하는 경우가 종종 발생한다. 이러한 경우 지반은 이완되고 따라서 토압에 따라 가시설 벽체에 변형이 발생하므로 인접 구조물의 안정성에 문제가 발생할 수 있다. 따라서 본 연구에서는 실내 모형실험을 통하여 여러 가지 형태의 지반 굴착방법에 따른 인접 지반의 지표면 변위를 산정하고, 이를 수치해석에 적용하여 지표면 침하에 따른 구조물의 변형 양상을 연구하였다. 이렇게 얻어진 구조물 변형 형상 중에서 각 변위와 수평 변형율을 추출하여 최종적으로 인접 구조물의 손상 정도를 평가하였다.