• Title/Summary/Keyword: Seepage discharge

Search Result 32, Processing Time 0.03 seconds

Seepage Behavior of Sea Dyke Final Closure with Tidal Variation (조위변화에 따른 방조제 끝막이 사석단면의 침투거동)

  • Yoo, Jeon-Yong;Oh, Young-In;Kim, Hyun-Tae;Jeung, In-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.800-807
    • /
    • 2006
  • Sea dyke construction is simply defined that the cutting procedure of sea water flow. Sea dyke construction is more difficult than in-land construction because it’s placed on deep seabed and exposed sea wave attack. Especially, the final closure of sea dyke is most dangerous due to the fast velocity of tidal flow. The final closure section is consisted with vast rubble and heavy stone gabion, therefore the discharge velocity at land side of final close section is irregularly and sometime occur the fast discharge velocity. In this study, the seepage model test performed to evaluate seepage behavior with tidal variation of final closure and continuous sea dyke section such as discharge velocity, hydraulic gradient, and phreatic line. Based on the seepage model test results, the maximum discharge velocity of final closure section is 1.7m/sec. Also the local discharge velocity increment and vortex is occurred.

  • PDF

Seepage Behavior of Sea Dyke Final Closure with Installation of Bottom Protection Filter Mat (근고공 필터매트 설치에 따른 방조제 끝막이구간의 침투거동)

  • Oh, Young-In;Yoo, Jeon-Yong;Kim, Hyun-Tae
    • Journal of the Korean Geosynthetics Society
    • /
    • v.5 no.1
    • /
    • pp.25-32
    • /
    • 2006
  • Sea dyke construction is simply defined as a cutting procedure of sea water flow. Sea dyke construction is more difficult than in-land construction because it is placed on deep seabed and exposed sea wave attack. Especially, the final closure of sea dyke is most dangerous due to the fast velocity of tidal flow. The final closure is consisted with vast rubble and heavy stone gabion, therefore the discharge velocity at land side of final close section is irregularly and sometime occur the fast discharge velocity. In this paper, the seepage model test performed to evaluate seepage behavior of final closure and continuous sea dyke section such as discharge velocity, hydraulic gradient, and phreatic line with installation of bottom protection filter mat. Based on the seepage model test results, the maximum discharge velocity of final closure section is 1.7m/sec and the discharge velocity is decreased maximum 23.7% with installation of bottom protection filter mat.

  • PDF

Numerical Analysis on Seepage Discharge of Weir Reinforced with Sheet Piles (수치해석을 이용한 널말뚝으로 보강된 수중보의 침투유량 분석)

  • Kim, Mintae
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.4
    • /
    • pp.105-112
    • /
    • 2024
  • Increased extreme weather conditions have led to a rise in flood damage to domestic rivers in Korea. This in turn has caused increased discharge through the structures and foundations of submerged weirs, leading to piping phenomena that can destroy these weirs. Therefore, extensive research into increased infiltration rates is necessary for the management and design of submerged weirs. In this study, seepage discharges were calculated and comparatively analyzed for weirs by varying the depth of the stratum and the length and location of sheet piles using numerical analysis, the fragment method, and the Polubarino-Kochina method. The results showed that the seepage discharge decreased as S/T increased and tended to increase as X/b increased. Changes in the length of the sheet pile had a greater impact on the infiltration rate than changes in the position of the sheet pile. Therefore, it is considered that installing longer sheet piles upstream can decrease the seepage discharge, enabling a safer design against piping in the weir design.

Numerical Investigation on Seepage Discharge Inside a Cylindrical Cut-off Wall (수치해석을 이용한 대형원형강재 가물막이의 침투유량 분석)

  • Ssenyondo, Vicent;Tran, Van An;Kim, Sung-Ryul
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.10
    • /
    • pp.51-60
    • /
    • 2018
  • Recently, a cylindrical cut-off wall was proposed as a new technology for temporary offshore works. The cut-off wall has a cylindrical shape, so seepage analyses are necessary to analyze the effect of wall shape. In this study, a numerical analysis was performed to investigate the seepage discharge inside cut-off walls. The numerical modeling was verified by comparing with the theoretical solution for the cofferdam with double sheet piles. Two different flow conditions were compared between 2-dimensional flow and axisymmetric flow. The results showed that the discharge of the axisymmetric flow was about 1.55 times larger than that of 2-dimensional plain flow. A parametric study was carried out by varying wall radius, penetration depth of the wall, and total head difference between in and outside of the wall. The discharge decreased with the increase of the penetration depth and the wall radius. Finally, the design equations were suggested to determine the discharge for the preliminary design of the cylindrical cut-off wall.

The Estimation of the Uplift Pressure and Seepage Discharge under Gravity Dam: Development of a 3-D FDM Model in Heterogeneous Media (중력댐 하부 침투류에 의한 양압력과 누수량 산정 -비균질 3차원 FDM 모형의 개발 및 적용-)

  • Kim, Sang-Jun
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.12
    • /
    • pp.1221-1234
    • /
    • 2013
  • The purpose of this study is to suggest the methodology for the computation of uplift pressure and discharge of the seepage flow under gravity dam. A 3-dimensional FDM model is developed for this purpose and this model can simulate the saturated Darcian flow in heterogeneous media. For the verification of the numeric model, test simulation has been executed and the mass balance has been checked. The error does not exceed 3%. Using the developed model, The uplift pressure and seepage flow discharge under gravity dam has been calculated. The uplift pressure shows the similar pattern, comparing with the result of flow-net method. As the length of grout curtain increases, the uplift pressure decreases linearly, but the seepage flow discharge shows the non-linear decreasing pattern. The coefficients of the formulas in the dam-design criteria have been analysed, and ${\alpha}=1/3$ corresponds to the value when the length of curtain grout is 70% of the aquifer height. The uplift pressure near the pressure relief drain has the big curvature vertically and horizontally. The developed model in this study can be used for the evaluation of the effects of seepage flow under gravity dam.

The Characteristics for Seepage Behaviour of Soil Structure by Modeling Tests (모형실험에 의한 토공구조물의 침투거동특성)

  • 신방웅;강종범
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.4
    • /
    • pp.158-167
    • /
    • 1999
  • In parallel flow condition, to estimate the stability of the extended embankment constructed on a permeable foundation ground, a laboratory model test was performed due to extended materials and water level increasing velocity of a flood period. A laboratory model test was peformed for different permeability coefficients ($K_1=2.0{\times}10^{-5}cm/sec,\;K_2=1.5{\times}10^{-4}cm/sec,\;K_3=2.3{\times}10^{-3}cm/sec$) using seepage. The fluctuation of water level occurring to an extended embankment was analyzed by laboratory model tests as vary the increasing velocity of water level with 0.6cm/min, 1.2cm/min, 2.4cm/min respectively. In analysis results, the increase of water level into embankment occurs rapidly because seepage water moving along with a permeable soil flow into embankment. The larger the permeability coefficient of an extended part is the longer initial seepage distance, and the exit point of downstream slope is gradually increased and then shows unstable seepage behavior as occurring partial collapse. As the increasing velocity of water level increase, the initial seepage line is formed low, and the discharge increases. Therefore, the embankment extended by a lower permeable soil than existing embankment shows stable seepage behavior because an existing embankment plays a role as filter for an extended part.

  • PDF

Friction Factor of Seepage Flow (투수층흐름에서의 마찰계수)

  • 유동훈;권순국
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.6 no.4
    • /
    • pp.397-403
    • /
    • 1994
  • The seepage flow has been investigated conducting laboratory experiments mainly in order to determine the relation of seepage flow friction factor against Reynolds number. The apparatus of seepage flow measurements has the water flow almost horizontaly. Several sets of experiments were carried out, and various flow conditions were obtained in each set of flow. To cover wide range of flow conditions, used were various materials of different measurement sizes and various stages of water discharge in the seepage flow tests. Shape factor equation was developed using existing data, and based on the present laboratory data, an explicit equation was developed for the estimation of friction factor of seepage flow in the range of Reynolds number from about 1 to about 600. The same equation is expected for the flow condition of Reynolds number over 600, considering the trend of friction factor distribution.

  • PDF

Evaluation on the Performance of Relief Wells Using Geosynthetics Blanket Length as a Parameter in an Agricultural Reservoir Embankment (농업용 저수지 제방에서 토목섬유 블랭킷의 길이에 따른 감압정의 성능 평가)

  • Ryu, Jeonyong;Kim, Seungwook;Chang, Yongchai
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.6
    • /
    • pp.5-17
    • /
    • 2022
  • The performance of the relief wells installed for the purpose of controlling seepage of the dam embankment is affected by various parameters such as diameter, spacing, penetration rate, permeability coefficient of the ground, thickness of the foundation layer. Therefore, when the relief wells are adopted for the purpose of reducing seepage pressure, these parameters should be sufficiently reviewed to determine the installation specifications of the relief wells. This study evaluated the effect of the length of the geosynthetics blanket on the performance of the relief wells installed in the downstream part of the dam embankment with blankets in the upstream and downstream part of the dam embankment as countermeasure methods to control seepage of the dam embankment. In the relationship between the length of the upstream and downstream blanket and the discharge, the discharge of the relief wells decreases as the length of the upstream blanket increases, and on the other hand, the discharge of the relief wells decreases as the length of the downstream blanket increases. In the upper and lower blanket length-spacing relationship, as the length of the upstream blanket increases, the spacing of the relief wells increases and as the length of the downstream blanket increases, the spacing of the relief wells decreases. Therefore, when installing the relief wells in parallel with the blanket, it was found that increasing the length of the upstream blanket is more efficient than increasing the length of the downstream blanket in order to minimize the discharge of seepage discharge and to ensure economic feasibility by wider installation of the relief wells.

Temporal Variations of Submarine Groundwater Discharge (SGD) and SGD-driven Nutrient Inputs in the Coastal Ocean of Jeju Island (제주도 연안에서 해저 지하수 및 지하수 기원 영양염류 유입량의 시간적 변화)

  • Hwang, Dong-Woon;Koh, Byoung-Seol
    • The Sea:JOURNAL OF THE KOREAN SOCIETY OF OCEANOGRAPHY
    • /
    • v.17 no.4
    • /
    • pp.252-261
    • /
    • 2012
  • To determine the temporal variations of submarine groundwater discharge (SGD) and SGD-driven nutrients inputs, we measured the seepage rate and the nutrient concentrations of pore water/groundwater in Bangdu Bay of Jeju Island at two and three month intervals from September 2009 to September 2010. The seepage rate of groundwater ranged from 0 to 330 cm/day (average ~170 cm/day) during the five sampling periods, which increased sharply from high tide to low tide due to changes in hydraulic pressure gradient between water table in land and water sea level in the coastal ocean by the tidal cycles. The submarine inputs of groundwater were also relatively higher in summer than in winter. The nutrient fluxes from SGD were about 90~100%, 70~95%, and 65~100% of the total input (except from open ocean waters) for dissolved inorganic nitrogen (DIN), phosphorus (DIP), and silicate (DSi), respectively, potentially supporting about 0.9~33 g $carbon/m^2/day$ of new primary production in Baugdu Bay. Thus, our study suggests that SGD-driven nutrients may play an important role in the eutrophication and biological production in the coastal ocean of Jeju Island.

Effects of structural characteristics of screw conveyor on spewing during EPB shield tunnelling

  • Xiaochun Zhong;Siyuan Huang;Rongguo Huai;Yikang Hu;Xuquan Chen
    • Geomechanics and Engineering
    • /
    • v.35 no.6
    • /
    • pp.571-580
    • /
    • 2023
  • During EPB shield tunnelling, construction speed and safety are severely affected by spewing. In this study, a theoretical seepage model is established to capture of the effects of screw conveyor geometry and turbulent flow on spewing. Experimental test results are used to verify the proposed theoretical seepage model. It is found that the seepage is greatly affected by the length of screw conveyor and soil permeability. The proposed model can increase the screw conveyor length and reduce soil discharge sections simultaneously, the permeability of treated muck thus decreases by one order of magnitude. By using the proposed theoretical seepage model, the criterion of critical soil permeability used to identify spewing is proposed. When the water head applied at tunnel face reaches 40 m and 50 m, the critical permeability coefficients of treated muck should be less than 10-5 m/s and 10-6 m/s to avoid spewing. For a given permeability coefficient of soil, the water flow rate is overestimated if structural characteristics of screw conveyor is not considered. Consequently, the occurrence of spewing is greatly overestimated, which increases construction cost substantially.