• Title/Summary/Keyword: Sediment control dam

Search Result 55, Processing Time 0.033 seconds

Characteristics Evaluation of Non Point Source Treatment Facilities in Construction Site (건설 현장 내 비점오염원 처리 시설의 제거 특성 평가)

  • Choi, Younghoa;Jeong, Seolhwa;Kim, Changryong;Kim, Hyosang;Oh, Jihyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.3
    • /
    • pp.53-62
    • /
    • 2009
  • This study was conducted to investigate characteristics of the non-point source pollution under construction and evaluate available pollution control methods. Suspended solid loading is high when soil disturbs by rainfall and this phenomenon is much more severe at the initial stage of construction than at the final one. There are three methods available for erosion and sediment control, which are check dam, silt fence, and geotextile. Check dam and silt fence are for control of suspense solids and geotextile is for preventing soil erosion during rainfall. They can be installed as temporary control facilities at construction sites. From the comparison of those methods, it was found that geotextile method was the most efficient for the runoff control of non-point source pollution. Check dam and silt fence can remove suspense solids by pore spaces to some degree, but the removal of pollutants mainly occurs through sedimentation. Because the temporary control facilities have limited removal efficiency of pollutant, they often cause civil claims and contamination of water environment. Hence, using a pressurized filtration system along with temporary control facilities, highly enhanced treatment efficiency was anticipated. In addition, the loading capacity of these techniques depends on filtration velocity and input loading. And their pre-treatments are necessary for efficient operation.

  • PDF

Prediction of the Suitable Area on Erosion Control Dam by Sediment Discharge in Small Forest Catchments (산림소유역 토사유출량에 의한 사방댐 시공적지 예측기법 개발)

  • Lee, Sung-Jae;Kim, Seon-Jeong;Lee, Eun-Jai;Ma, Ho-Seop
    • Journal of Korean Society of Forest Science
    • /
    • v.109 no.4
    • /
    • pp.438-445
    • /
    • 2020
  • The characteristics of forest environmental factors were analyzed using the quantification theory (I) for prediction of the suitable area of erosion control dams. The results indicated that sediment discharge in small forest catchments was significantly correlated with dredging passage (0.7495) and age class (0.6000). In contrast, area (0.3416), slope gradient (0.3207), rainfall (0.3160), altitude (0.2990) and soil type (0.2192) were poorly correlated. Following quantification theory (I), we developed a selection decision table for erosion control dams based on sediment discharge rate as class I (highly suitable site, greater than 2.2496), class II (suitable site, 1.1248~2.2495), and class III (poorly suited site, lower than 1.1247).

The Comparative Analysis of Reservoir Capacity of Chungju Dam based on Multi Dimensional Spatial Information (다차원 공간정보 기반의 충주댐 저수용량 비교분석)

  • Lee, Geun Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5D
    • /
    • pp.533-540
    • /
    • 2010
  • Dam is very important facility in water supply and flood control. Therefore study needs to analyze reservoir capacity accurately to manage Dam efficiently. This study compared time series reservoir capacity using multi-dimensional spatial information to Chungju Dam reservoir and major conclusions are as follows. First, LiDAR and multi beam echo sounder survey were carried out in land zone and water zone of Dam reservoir area. And calibration process was performed to enhance the accuracy of survey data and it could be constructed that multi dimensional spatial information which was clearly satisfied with the standard of tolerance error by validation with ground control points. Reservoir capacity by water level was calculated using triangle irregular network from detailed topographic data that was constructed by linked with airborne LiDAR and multi beam echo sounder data, and curve equation of reservoir capacity was developed through regression analysis in 2008. In the comparison of the reservoir capacity of 2008 with those of 1986 and 1996, the higher water level goes, total reservoir capacity of 2008 showed decrease because of the increase of sediment in reservoir. Also, erosion and sediment area could be analyzed through calculating the reservoir capacity by the range of water level. Especially the range of water level as 130.0~135.0 which is the upper part of average water level, showed the highest erosion characteristics during 1986~2008 and 1996~2008 and it is considered that the erosion of reservoir slant by heavy rainfall is major reason.

A study on Location Condition for Erosion Control Dam - Focus on Chungcheong region and Kyeongsangbuk-do - (사방댐 입지조건에 관한 연구 - 충청지역과 경북지역을 중심으로 -)

  • Park, Sae-Jun;Lee, Joon-Woo;Choi, Yeon-Ho;Kim, Myeong-Jun;Kweon, Hyeong-Keun;Jeon, Yong-Jun
    • Korean Journal of Agricultural Science
    • /
    • v.37 no.2
    • /
    • pp.223-229
    • /
    • 2010
  • This study is to analyze location conditions for erosion control dams to be constructed in Chungcheongnam-do, Daejeon Metropolitan City, Chungcheongbuk-do and Gyeongsangbuk-do in order to establish proper conditions for erosion control dams in the future. 199 sites where erosion control dams are expected to be built in 2010 were chosen and investigated in terms of 12 factors including basin area, basin slope, and landslide risk. The results showed that erosion control dams for Chungcheongnam-do and Daejeon Metropolitan City are mostly impermeable gravity dams mainly composed of concrete. In contrast, Chungcheongbuk-do and Gyeongsangbuk-do are increasing the number of permeable or compound erosion control dams. Basin analysis at planned erosion control dam sites showed that at least 44.5% of the total area has high landslide risk. Gyeongsangbuk-do had the largest basin area for erosion control dam sites at 157.3ha, followed by Chungcheongbuk-do at 64.4ha and Chungcheongnam-do at 54.8ha. Analysis of sand deposits in the Chungcheongnam-do erosion control dam built in 2010 confirmed an average deposit of 971.8m3. The sand deposit capacity and amount of sediment control for erosion control dams have a very low correlation with basin area or flow path slope, and this needs to be addressed in future sand deposit capacity designs.

Operation of CROM System and its Effects of on the Removal of Seston in a Eutrophic Reservoir Using a Native Freshwater Bivalve (Anodonta woodiana) in Korea. (담수산 이매패 펄조개를 이용한 흐름형 유기물 제어(CROM) 운영 - 퇴적물의 영향)

  • Kim, Baik-Ho;Baik, Soon-Ki;Hwang, Su-Ok;Hwang, Soon-Jin
    • Korean Journal of Ecology and Environment
    • /
    • v.42 no.2
    • /
    • pp.161-171
    • /
    • 2009
  • A 'continuous removal of organic matters (CROM) system' using a native freshwater bivalve in Korea Anodonta woordiana, was developed to determine its potential of controlling various sestons in eutrophic lake system, and to evaluate its effect on water quality improvement under consideration of sediment addition as habitat. We designed CROM experiments with four treatments: no mussels and no sediment (W, negative control), no mussels and sediment (WS, positive control), mussels and no sediment (WM), and mussels and sediment (WMS). The experiments were performed at the condition of 18${\sim}$25 L $h^{-1}$ of inflow, mussel density of 486.1 indiv. $m^{-2}$, and temperatures between 15 and $22^{\circ}C$ for 13 consecutive days. Physicochemical and biological parameters were measured at daily (10:00 am) intervals after the mussel addition. Results indicated that mussel stockings without addition of sediment effectively removed sestons (suspended solids and chlorophyll-a) at nearly same level over 80 percentage of the control during the study, while there were no differences in removal activities of sestons between with and without sediment (P>0.5). Therefore, it clearly suggests that CROM system using A. woordiana has a strong potential to control the seston in surface water of eutrophic lake.

Studies on Effects of Channel Bed Fixation by Erosion Control Dams in Torrential Streams (황폐계류(荒廢溪流)에 있어서 사방시설물(砂防施設物)에 의한 하도고정(河道固定)에 관한 연구(硏究))

  • Chun, Kun Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.79 no.3
    • /
    • pp.269-277
    • /
    • 1990
  • In planning the disaster prevention by the erosion control facilities, it is essential to focus on the microtopography of the channel bed and the chronological process of sedimental movement in the torrential streams. For this purpose, the microtopographical change of the channel bed and the effects of the erosion control facilities in the mountain torrents were analyzed by the experimental channel and the field survey of the torrents where low-dam series had been constructed in the channel. The results of this experiment showed that the effects of construction of the low-dam series on the channel bed fixiation were the prevention of the local scouring in the experimental channel and the expansion of flow channel width and deposit space. The results are summarized as follows : 1. When the low-dam series were constructed over the whole channel bed (L'/L=1), the conning water and the sediment were seperated, simultaneously resulting in deposition of sediment and reduction of the tractive force for the running water. Therefore, the F.A. (Fluctuation area in cross-section: value was decreased to about 65% compared with that of non-work (L'/L=0). 2. The efficiencies of the low-dam series on the channel width were increased with an increment in length of working space. After the construction of low-dam series on the whole channel bed (L'/L=1), flow channel width was increased to about 1.53 times compared with that of non-work (L'/L=0). 3. It needs a deposition area to store the sediment with decrease in tractive force. The low-dam series in the experimental channel widened the deposition area about 2.10 times compared with that of non-work.

  • PDF

Prediction of reservoir sedimentation: A case study of Pleikrong Reservoir

  • Thu Hien Nguyen;XuanKhanh Do
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.36-36
    • /
    • 2023
  • Sedimentation is a natural process that occurs in all reservoirs. Sedimentation problem reduces the storage capacity of the reservoir and limits its ability to provide water for various uses, such as irrigation, hydropower generation, and flood control. Therefore, predicting reservoir sedimentation is important for ensuring the efficient operation and sedimentation management of a reservoir and . In this study, the HECRAS model was applied to predict longitudinal distribution of deposited sediment in the Pleikrong reservoir to 2050. Different scenarios was considered: (i) no climate change, (ii) climate change (under two emissions scenarios, RCP4.5 and RCP8.5), and (iii) climate change and land use change (followed land use planning of the watershed). The computation results with different scenarios were analyses and compared. The results show that the reservoir reduced storage volume's rate and sedimentation proceed toward to the dam in the case of climate change is faster than in the case of no climate change. Analyses also indicates that following the land used planning could also improve the long-term problem of the reservoir sedimentation. The outcomes of this study will be helpful for a sustainable plan of sediment management for the Pleikrong reservoir.

  • PDF

Analyzing the Occurrence Trend of Sediment-Related Disasters and Post-Disaster Recovery Cases in Mountain Regions in N orth Korea Based on a Literature Review and Satellite Image Observations (문헌 및 위성영상에 기초한 북한의 산지토사재해 발생경향 및 복구사례 분석)

  • Kim, Kidae;Kang, Minjeng;Kim, Suk Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.110 no.3
    • /
    • pp.419-430
    • /
    • 2021
  • This study investigated spatiotemporal trends of sediment-related disasters in North Korea from 1960 to 2019 and post-disaster recovery cases based on a literature review and satellite images. Results showed that occurrence status of sediment-related disasters was initially externally reported in 1995 (during the Kim Jongil era); their main triggering factor was heavy summer rainfall. Furthermore, forest degradation rate was positively correlated with population density (R2 = 0.4347, p = 0.02) and occurrence number of sediment-related disasters was relatively high on the west coast region, where both variables showed high values. This indicates that human activity was a major cause of forest degradation and thus, significantly affected sediment-related disasters in mountain regions. Finally, sediment- related disasters due to shallow landslides, debris flow, and slow-moving landslides were observed in undisturbed forest regions and human-impacted forest regions, including terraced fields, opencast mines, forest roads, and post-wildfire areas, via satellite image analysis. These disaster-hit areas remained mostly abandoned without any recovery works, whereas hillside erosion control work (e.g., treeplanting with terracing) or torrent erosion control work (e.g., check dam, debris flow guide bank) were implemented in certain areas. These findings can provide reference information to expand inter-Korean exchange and cooperation in forest rehabilitation and erosion control works of North Korea.

Estimation of sediment deposition rate in collapsed reservoirs(wetlands) using empirical formulas and multiple regression models (경험공식 및 다중회귀모형을 이용한 붕괴 저수지(습지) 비퇴사량 추정)

  • Kim, Donghyun;Lee, Haneul;Bae, Younghye;Joo, Hongjun;Kim, Deokhwan;Kim, Hung Soo
    • Journal of Wetlands Research
    • /
    • v.23 no.4
    • /
    • pp.287-295
    • /
    • 2021
  • As facilities such as dam reservoir wetlands and agricultural irrigation reservoir wetlands are built, sedimentation occurs over time through erosion, sedimentation transport, and sediment deposition. Sedimentation issues are very important for the maintenance of reservoir wetlands because long-term sedimentation of sediments affects flood and drought control functions. However, research on resignation has been estimated mainly by empirical formulas due to the lack of available data. The purpose of this study was to calculate and compare the sediment deposition rate by developing a multiple regression model along with actual data and empirical formulas. In addition, it was attempted to identify potential causes of collapse by applying it to 64 reservoir wetlands that suffered flood damage due to the long rainy season in 2020 due to reservoir wetland sedimentation and aging. For the target reservoir, 10 locations including the GaGog reservoir located in Miryang city, Gyeongsangnam province in South Korea, where there is actual survey information, were selected. A multiple regression model was developed in consideration of physical and climatic characteristics, and a total of four empirical formulas and sediment deposition rate were calculated. Using this, the error of the sediment deposition rate was compared. As a result of calculating the sediment deposition rate using the multiple regression model, the error was the lowest from 0.21(m3km2/yr) to 2.13(m3km2/yr). Therefore, based on the sediment deposition rate estimated by the multi-regression model, the change in the available capacity of reservoir wetlands was analyzed, and the effective storage capacity was found to have decreased from 0.21(%) to 16.56(%). In addition, the sediment deposition rate of the reservoir where the overflow damage occurred was relatively higher than that of the reservoir where the piping damage occurred. In other words, accumulating sediment deposition rate at the bottom of the reservoir would result in a lack of acceptable effective water capacity and reduced reservoir flood and drought control capabilities, resulting in reservoir collapse damage.

Contamination of Heavy Metals in Stream Sediments in the Vicinity of the Sambo Pb-Zn-Barite Mine (삼보 연-아연-중정석 광산 주변 하상퇴적물에서의 중금속 오염 연구)

  • Kim, Sang-Hyun;Chon, Hyo-Taek
    • Economic and Environmental Geology
    • /
    • v.26 no.2
    • /
    • pp.217-226
    • /
    • 1993
  • Stream sediment samples were collected in the vicinity of the Sambo Pb-Zn-barite mine in order to investigate dispersion patterns and pollution levels of heavy metals, and to find out their mode of occurrences. Those samples were analyzed for Cd, Cu, Pb, Zn, Fe, and Mn by using partial extraction and sequential extraction methods. Stream sediments of this studied area has been contaminated severely by Pb, Zn, and Cd. Dispersion patterns of heavy metals in those sediments are different according to their pollution source and sampling distance from the mine. The stream sediment pH is generally neutral in control area, and is slightly acidic in the lower part of tailing dam. The main pollution source of stream sediments was confirmed as tailing and mine drainage. Their pollution level depends mainly on inflowed water and distance from the mine. The tolerance index ranges from -0.9 to 0.7. The mode of occurrances of heavy metals in polluted stream sediment are identified as Fe-Mn oxides, organic bounded and carbonate-bounded compound which show high potential of bioavailablity.

  • PDF