• 제목/요약/키워드: Sea Bridge

검색결과 152건 처리시간 0.03초

Effects of Sling Bridge Exercise with Rhythmic Stabilization Technique on Trunk Muscle Endurance and Flexibility in Adolescents with Low Back Pain

  • Kim, Kyung-Yoon;Sim, Ki-Chol;Kim, Tae-Gon;Bae, Sea-Hyun;Lee, Jun-Cheol;Kim, Gi-Do
    • International Journal of Contents
    • /
    • 제9권4호
    • /
    • pp.72-77
    • /
    • 2013
  • The purpose of this study was to examine the effects of general sling-bridge exercise (GSE) and sling-bridge exercise with rhythmic stabilization technique (SER) on trunk muscle endurance and flexibility in adolescents with low back pain (LBP). 30 adolescents who had complaints of LBP were randomly assigned to one of the two groups: the GSE group (n=15) and SER group (n=15). Subjects performed each exercise programs for 4 weeks with the aim of improving trunk muscle stability; GSE group trained general bridge exercise with sling, SER group trained rhythmic stabilization bridge exercise with sling. The static and dynamic trunk muscle endurance and flexibility were measured before and at the end of the exercise program. The static and dynamic trunk muscle endurance were significantly improved in both groups (p<.05) and the SER group showed significant difference from the GSE group after the exercise (p<.05). The trunk muscle flexibility was significantly improved in both groups (p<.05) and the SER group were significantly different from GSE group post-exercise (p<.05). The results of this study showed that sling bridge exercise with rhythmic stabilization technique may be appropriate for improving trunk muscle stability in adolescents with LBP.

해상 사장교의 Pipe형 케이블 정착구에 관한 구조해석 (Structural Analysis of a Cable Anchor System for a Cable-Stayed Bridge over the Sea)

  • 공병승;홍남식
    • 한국해양공학회지
    • /
    • 제19권5호
    • /
    • pp.34-42
    • /
    • 2005
  • The cable connection zone of the cable-stayed bridge transfers deal-load, live-load, and second-load to the cables on the structural joint zone of the cables and the main girders are the most critical parts in which big cable tensile forces are generated by those loads. Therefore, it is necessary to thoroughly check the main girder, structurally to secure the required stability. Because of the heavy tensile force of cables linked in the connection zone of the cable-stayed bridge, locally concentrated stress, as well as the dispersion of stress, occurs in the structurally contacted point of cable and main girder thus, we need to make a thorough investigation through a detailed structural analysis. Directly delivering the tensile force to the connection zone of the cable, the consequently big effect in the tensile force fluctuation caused by the live-load will make it necessary to review the fatigue strength. As the connection zone of the cable is designed to resist the tensile force of the cable, which is applied to a connecting section as a concentrated force, thick plates are used. These plates are frequently made of welded structure, thus, the investigation of the welding workability is inevitable.

부산 신항-낙동강 하구역 연결잔교부의 물질수송 해석(I) - 현장조사를 통한 잔교부 해수소통량 평가 - (Analysis of Seawater Transport based on Field Measurements at Pier-bridge between Busan New-port and the Nakdong River Estuary)

  • 이영복;;김헌태;윤한삼
    • 해양환경안전학회지
    • /
    • 제14권3호
    • /
    • pp.189-195
    • /
    • 2008
  • 신항과 낙동강 하구역의 접점인 연결잔교를 통해 소통되는 해수의 수리적인 특성을 파악하기 위하여 연결잔교부에서 현장관측을 실시하고 두 해역간의 상호작용을 해석하고자 하였다. 현장조사 결과로서 연결잔교상의 최대 유속은 1차관측시 13.18 cm/sec, 2차관측시 30.80 cm/sec를 나타내었다. 해수소통량 계산결과는 1차 관측기간 동안 단위시간당 해수소통량은 $184.71\;m^3/sce$이고, 잔차해수소통량은 $59.74\;m^3/sec$로 신항만에서 낙동강 하구역 방향으로 유출되었다. 또한 2차 관측기간 동안 단위시간당 해수소통량은 $331.15\;m^3/sec$이고, 잔차해수소통량은 $28.88\;m^3/sec$로 낙동강 하구역에서 신항만 방향으로 유출되었다.

  • PDF

선박 평형수 처리용 Phase Shift Full Bridge Converter 출력 제어 알고리즘 (An Output Control Algorithm for Phase Shift Full Bridge Converter for Ballast Water Treatment)

  • 이상리;김학원;조관열;정호철;김종혁;박귀철
    • 전력전자학회논문지
    • /
    • 제18권6호
    • /
    • pp.530-539
    • /
    • 2013
  • In large vessels, proper water level must be maintained with a balance for right and left equilibrium by absorbing or draining sea water in ballast water tank. However, this ship's ballast-water can be drained marine organisms to local sea area by world trade and this can be a source of ecological disturb. In order to solve these problems, marine organisms must be removed in accordance with the international covenant for the emission of microorganisms. By this reason, the seawater electrolysis rectifier of low-voltage high-current rectifiers with excellent ability for microbial treatment is required. In this paper, PSFB converter will be discussed for the seawater electrolysis rectifier. Furthermore, a new output control method with the power limit operation under the limited maximum voltage condition is proposed for this rectifier. The simulation for the proposed current control method for PSFB Converter is shown using MATLAB/SIMULINK. Finally the usefulness of the proposed control method is presented by the experimental results.

2006-2007 기간 중 신생 새만금호 '만경대교' 정점에서 식물플랑크톤 군집 급변에 대한 연구 (Drastic Change of Phytoplankton Community at the Station 'Mankyeong Bridge' of the New Saemankeum Lake during 2006-2007)

  • 장건강;박종우;박장호;하나;이원호
    • Ocean and Polar Research
    • /
    • 제31권1호
    • /
    • pp.71-76
    • /
    • 2009
  • Drastic changes in the water quality and phytoplankton community of the new Saemankeum Lakeduring the first decade following the construction of the Saemankeum Sea Wall has been considered to be unavoidable. Input of eutrophicated water through the Mankyeong River and Dongjin River might produce more direct effects on the water quality and phytoplankton community, which lead us to launch a long-term semi-weekly investigation at the "Mankyeong Bridge" monitoring point to resolve its short-term effect as well as long-term stabilization of the ecosystem in the new Saemankeum Lake. During 15 months starting from June 2006, the water temperature varied in accordance with the typical seasonal variations in temperate on the coasts, and no significant daily variations evoked by tidal cycle could be detected. However, there was an inverse relationship between seasonal precipitation and salinity even though the range in annual variation was drastically reduced right after the construction of the Saemankeum Sea Wall. Species richness in the phytoplankton community was also reduced due to the narrowed annual range of salinity, which would eliminate the mid-high salinity species from the Mankyeong Bridge monitoring point. Similarly, species diversity was decreased with increased dominance of the phytoplankton community after the construction. Between the two summer seasons during the present study, species diversity was higher in 2007 than in 2006, which might indicate the early stage of a gradual stabilization in the ecosystem including the phytoplankton community at the monitoring station. The phytoplankton community thus needs to be monitored on a long-term basis to identify indirect signals that can be used to assess the stability of the ecosystem in the young Saemankeum Lake.

새만금 하구역의 이화학적 환경요인에 따른 수질 평가 (The Evaluation of Water Quality in Coastal Sea of Saemangeum by Chemical Environmental factors)

  • 김재옥;김원장;조국현
    • 한국농공학회논문집
    • /
    • 제49권5호
    • /
    • pp.57-65
    • /
    • 2007
  • The objective of this study was to evaluate chemical water quality by hourly monitoring(25hr) of Saemangeum esturary. For this study, we selected 2 sites like a Mangyong Bridge(St. 6) and Dongjin Bridge(St. 7). Inflow of salt water was not detected during low tide(maximum 553, 508cm) of all stations, while the salinity rises were detected in spring tide(750cm). When 602m of maximum tide was reached, salinity concentration was increased at St. 7, while there was no change in St. 6. Therefore, We know that salinity variation is greatly influenced by tide height at survey site. Also, significant variance of salinity(p<0.05) was found between St. 6 and St. 7 because dike construction made the flood tide move into the Dongjin river. Total suspened solids(TSS) concentration was increased because of the river runoff at St. 6, and also the turbulance and resuspension according to salt intrusion at St. 7. During the high tide, the water discharge from the sea seemed to dilute the nutrient but to elevate TSS concentration in St. 7. Silicate and nitrate concentrations in the studied site were decreased by the mixing of sea water, whereas the evident trend of phosphate concentration was not found. This result can be explained by the phosphorus condition. Phosphorus exists inactive when it is affected by hydrated iron and adsorbed onto suspended matters. Compared to the environmental conditions of the St. 6 and St. 7, physical factors such as temperature, dissolved oxygen and TSS have statistically no significant difference(p<0.001), but nutrient concentrations were higher at St. 6 than St. 7. It could be suggested from these results that it is important to control the discharge of fresh water by sewage treatment plants located in St. 6 for water quality management.

GEOTECHNICAL DESIGNS OF THE SHIP IMPACT PROTECTION SYSTEM FOR INCHEON BRIDGE

  • Choi, Sung-Min;Oh, Seung-Tak;Park, Sang-Il;Kim, Sung-Hwan
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회 3차
    • /
    • pp.72-77
    • /
    • 2010
  • The Incheon Bridge, which was opened to the traffic in October 2009, is an 18.4 km long sea-crossing bridge connecting the Incheon International Airport with the expressway networks around the Seoul metropolitan area by way of Songdo District of Incheon City. This bridge is an integration of several special featured bridges and the major part of the bridge consists of cable-stayed spans. This marine cable-stayed bridge has a main span of 800 m wide to cross the vessel navigation channel in and out of the Incheon Port. In waterways where ship collision is anticipated, bridges shall be designed to resist ship impact forces, and/or, adequately protected by ship impact protection (SIP) systems. For the Incheon Bridge, large diameter circular dolphins as SIP were made at 44 locations of the both side of the main span around the piers of the cable-stayed bridge span. This world's largest dolphin-type SIP system protects the bridge against the collision with 100,000 DWT tanker navigating the channel with speed of 10 knots. Diameter of the dolphin is up to 25 m. Vessel collision risk was assessed by probability based analysis with AASHTO Method-II. The annual frequency of bridge collapse through the risk analysis for 71,370 cases of the impact scenario was less than $0.5{\times}10^{-4}$ and satisfies design requirements. The dolphin is the circular sheet pile structure filled with crushed rock and closed at the top with a robust concrete cap. The structural design was performed with numerical analyses of which constitutional model was verified by the physical model experiment using the geo-centrifugal testing equipment. 3D non-linear finite element models were used to analyze the structural response and energy-dissipating capability of dolphins which were deeply embedded in the seabed. The dolphin structure secures external stability and internal stability for ordinary loads such as wave and current pressure. Considering failure mechanism, stability assessment was performed for the strength limit state and service limit state of the dolphins. The friction angle of the crushed stone as a filling material was reduced to $38^{\circ}$ considering the possibility of contracting behavior as the impact.

  • PDF

선박충돌방지공이 설치된 해상교량의 교각 세굴 특성 분석 - 인천대교를 대상으로 - (Pier-Scour Characteristics of the Marine Bridge with Ship Impact Protection - Incheon Bridge Case -)

  • 여운광;지운;김창성;임종철
    • 한국해안·해양공학회논문집
    • /
    • 제20권2호
    • /
    • pp.203-211
    • /
    • 2008
  • 최근 들어 선박의 항로에 위치하고 있는 대형 해상교량의 건설이 활발해짐에 따라 선박충돌의 위험성을 고려하여 교각 주변에 충돌방지공을 설치하는 경우가 많다. 이러한 충돌방지공 설치로 인해 교각의 세굴특성은 충돌방지공 설치 전의 교각 주변의 세굴양상과 매우 다르게 나타난다. 따라서 본 연구에서는 충돌방지공의 설치 유무에 따른 세굴의 형태를 분석하기 위해 인천대교를 대상으로 수리모형실험을 실시하였다. 충돌방지공 설치 전의 고정상, 이동상실험을 통해 유황과 세굴심 및 세굴공 범위를 파악하였으며 또한 충돌방지공 설치 후 실험을 통하여 최종적으로 충돌방지공으로 인한 교각 세굴 특성 변화를 분석하였다. 실험결과, 충돌방지공이 설치됨으로 인해 최대세굴심이 W1교각의 경우 약 0.24 m, W2+3+4교각의 경우 2.4 m 증가하는 것으로 나타났다. 또한 최대세굴심의 발생위치는 W1교각의 경우 충돌방지공 설치 전 후가 동일한 위치에서 발생하였으나 W2+3+4교각의 경우 설치 후 최대세굴심이 교각주변이 아닌 충돌방지공 주변에서 발생하였다.

드론과 A.I.를 이용한 특수교 주탑부 표면 손상 탐지 방법 연구 (A Study on the Surface Damage Detection Method of the Main Tower of a Special Bridge Using Drones and A.I.)

  • 이성진;주봉철;김정호;이태희
    • 한국방재안전학회논문집
    • /
    • 제16권4호
    • /
    • pp.129-136
    • /
    • 2023
  • 높은 주탑을 가지는 해상특수교량은 특수한 구조적 특징으로 인해 육안점검이 어려운 점검사각지대가 존재하게 되며, 이를 해결하기 위해 드론을 활용한 안전점검 방법들이 연구되고 있다. 본 연구에서는 드론을 이용하여 해상특수교량 주탑의 영상 데이터를 취득하고, 인공지능 알고리즘을 개발하여 주탑부 표면 손상에 대한 탐지를 수행하였다. 인공지능 알고리즘은 서로 다른 구조를 지닌 딥러닝 네트워크를 활용하여 앙상블을 형성한 모델을 구축하고 결과를 취합하는 스태킹 앙상블 학습법을 적용하였다.

거가대교 케이슨기초 그라우트 충전 사례연구 (A Case Study on Caisson Foundation Grouting in Geo-Ga Bridge)

  • 배경태;차경섭;김영진;박충환;정경환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.1046-1050
    • /
    • 2010
  • During construction of a sea-crossing bridge grouting was used to fill densely the space between the bottom of caisson and the ground. This grout mixture was mixed with an anti-washout admixture after locating accurately the pre-cast caisson on three concrete landing pads. This method differs significantly from the costly conventional method, for bridge foundations offshore, where concrete is placed in situ after excavating inside of a temporary concrete coffering wall. To verify the grouting method in advance, the full-scale field tests were performed twice on land. After identifying the fluidity of the grout material to be filled, finding some possible problems with the main construction and revising the original design, the main construction has been continuing successfully with 20 caissons completed to date. The purpose of this paper is to introduce for the first time in Korea the grouting method including the automatic and the manual monitoring system based on the main construction of the caisson foundation.

  • PDF