Process Improvements for Elevating Pre-outfitting Rate of FPSO (FPSO의 선행의장률 향상을 위한 생산관리 및 공법개선 사례연구)

  • Shin, Sung-Chul;Cho, Jong-Burm;Shin, Ki-Young;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.3
    • /
    • pp.325-334
    • /
    • 2009
  • Generally, functional design of FPSO has been done by the engineering firm designated by ship owner. Main equipment such as topside facility is imported from abroad. But sometimes, OFE (Owner Furnished Equipment) does not satisfy the PND (Product Need Date) of each production stage because the delivery date of OFE is not scheduled to satisfy the PND. And sometimes many loose items and equipment are complex from engineering which does not consider pre-outfitting. Main objective of this study is process improvements by maximizing pre-outfitting rate in the stage of equipping STP (Submerged Turret Production), one of main equipment on FPSO. In this study, we analyzed the factors which obstructed pre-equipping STP using the past records of FPSO projects.

Study on the Optimal Design of Automatic Data Recovery System in case of Communication Loss in Remote Management of Hydraulic Facilities (수리시설물 원격관리에 있어 통신두절시 데이터 자동복구 시스템 최적설계에 관한 연구)

  • Ahn, Tae-Hyung;Kim, Sang-Yu;Ko, Jeong-Min;Kim, Jae-Yeol
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.21 no.4
    • /
    • pp.46-52
    • /
    • 2022
  • In the existing wired communication network, wired communication is frequently interrupted by lightning, which accompanies rain, and remote management cannot be performed when it is actually necessary. In the case of communication interruption, field data stored in the database are lost, and data at an important point in time may go missing; this causes a decrease in the reliability of the stored data. Therefore, in this study, wireless communication using the Internet of Things (IoT) communication network of the 4th industrial technology is installed in the prototype to reduce wired communication construction costs, prevent resource waste and environmental damage due to communication facility construction, and prepare for communication loss.

Study on Schematic Design for Educational Facilities of Hanyang Women's College (한양여자대학 교육시설의 계획설계에 관한 연구)

  • Jung, Won-Ju
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.2 no.1
    • /
    • pp.32-38
    • /
    • 2002
  • Hanyang woman's college educational facility general planning presents "Long-term and expansive space organization plan" of Hanyang woman's collage to correspond to sudden decline and "Globalization specialization" of "Matriculation competition rate by school age decrease in population" but there is primary purpose. To detailed item, secure "Flexibility of campus space by learning environment change" and studies and examines "Campus ashes construction plan by step by new earth purchase" we wish to propose "Long-term and systematic synthesis master plan" and "Newly-appointed official and present official new construction plan".

  • PDF

Development of Risk-Based Inspection(RBI) Technology for LNG Plant Based on API RP581 Code (API RP 581 Code를 기반으로한 LNG 플랜트의 Risk-Based Inspection(RBI) 기술 개발)

  • Choi, Song-Chun;Choi, Jae-Boong;Hawang, In-Ju
    • Corrosion Science and Technology
    • /
    • v.11 no.5
    • /
    • pp.179-183
    • /
    • 2012
  • As one of promising solutions to overcome high oil price and energy crisis, the construction market of high value-added LNG plants is spotlighted world widely. The purpose of this study is to introduce LNG-RBI system to develop risk assessment technology with RAM(Reliability, Availability, Maintainability) modules against overseas monopolization. After analyzing relevant specific features and their technical levels, risk assessment program, non-destructive reliability evaluation strategy and safety criteria unification class are derived as core technologies. These IT-based convergence technologies can be used for enhancement of LNG plant efficiency, in which the modular parts are related to a system with artificial optimized algorithms as well as diverse databases of facility inspection and diagnosis fields.

A MODEL FOR SELECTION, AWARDING, AND MONITORING OF PPP PROJECTS IN DEVELOPING COUNTRIES; HEALTH CARE FACILITIES IN COLOMBIA

  • Henry Arboleda-Mantilla;Carlos A. Arboleda
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.344-351
    • /
    • 2013
  • Private participation on public infrastructures projects is being promoted by governments of several developing countries, among them Colombia. As a result, several advantages such as service delivery efficiency, technology application and faster execution of the projects have been recognized. Hence, the Colombian Government is looking for schemes that allow the private investment in projects like hospitals, schools, prisons and public edification. In this paper, experiences in PPP from other countries were analyzed and adjusted to the Colombian environment. As a result, a model adapted to Colombia is presented, based on a well-developed case from Spain. The awarding process is defined by economic criteria, previous compliance of minimum technical exigencies. Once the infrastructure is operating, contractual periodical payments will be done, based on the performance of the facility.

  • PDF

DECISION SUPPORT SYSTEM FOR SUBURBAN STATION REHABILITATION

  • TaeHoon Hong;Sangyoub Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.855-861
    • /
    • 2005
  • Every public agency governing infrastructure has to plan effectively for rehabilitation of existing facilities within the constraints of the capital program. Numerous technical, social, political, financial, and management constraints govern the decision to rehabilitate a facility. However, without a systematic procedure for selecting facilities for rehabilitation, within the prevailing constraints, it is possible that the funds available for rehabilitation might be suboptimized. Therefore, a decision support system that assists the user in selecting facilities for rehabilitation while considering the technical, social, financial, and political and management constraints will be useful in the decision-making process. This paper compares the Analytical Hierarchy Process (AHP) with the Swing Weight method used to prioritize functional criteria for suburban station rehabilitation. This paper also contains a brief discussion about the relevance of the Multi Attribute utility theory in developing a decision model for the problem at hand. The results of this paper provides the user with a decision support system that would prioritize the stations in order of their weights obtained by a systematic evaluation of various criteria and sub-criteria involved in the decision making process

  • PDF

Investigating the Maintenance Cost of Rest Areas: A Case Study of Nevada

  • Shrestha, Kishor;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.624-631
    • /
    • 2022
  • Highway Rest Areas are envisioned to provide an accessible space for rest and parking for travelers, especially those driving a long distance. In addition, modern highway Rest Areas provide many amenities to highway users, including wifi service, picnic tables, litter barrels, running water, public telephones, and sometimes even free coffee. Various studies were conducted in the domain of Rest Area facility design and their operating costs in different states; however, limited studies were conducted on the maintenance costs of these facilities. Therefore, this study's main objective is to compute the annual maintenance cost of Rest Areas in the state of Nevada. This study also analyzes the main cost categories of the maintenance works. The raw cost data of Nevada Rest Area maintenance from 1990 to 2012 were collected from the Nevada Department of Transportation (NDOT). Results show that the maintenance cost fluctuated over the study period; the maintenance cost decreased from 1991 to 2004 and then increased until 2012. The primary cost categories of maintenance work are labor, equipment, and material costs. Among these, labor cost was the largest category with 56 percent of the total maintenance cost, followed by equipment cost and material cost. The findings of this study may help NDOT and other transportation agencies plan their budget for future Rest Area maintenance activities.

  • PDF

Causes of Delay in Tall Building Projects in GCC Countries

  • Sanni-Anibire, Muizz O.;Zin, Rosli Mohamad;Olatunji, Sunday Olusanya
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.50-59
    • /
    • 2020
  • The 21st century is witnessing a rapid growth of tall buildings in urban centers globally to create more urban space for an anticipated urban population. Tall buildings, however suffer from incessant delays and sometimes total abandonment. Consequently, this study investigated and ranked the causes of delay in tall building projects, while focusing on the Gulf Cooperation Council (GCC) countries. Initially, 36 common delay causes investigated globally were categorized into 9 groups, and then further ranked utilizing the Relative Importance Index (RII) through a questionnaire survey. Tall building professionals in the GCC countries (Saudi Arabia, United Arab Emirates, Bahrain, Kuwait, Oman and Qatar) were contacted. The respondents' categories include Consultants, Contractors, and Clients' Representatives/Facility Managers. The results reveal that the top three causes include "client's cash flow problems/delays in contractor's payment", "contractor's financial difficulties", and "poor site organization and coordination between various parties". The findings from this study could help construction professionals develop guidelines and controls for delay mitigation, as well as support them in risk-based decision making in the planning of tall building projects.

  • PDF

A Study on School Dietitians' Satisfaction with Foodservice Facilities and Utilities in the Chonbuk Area of Korea (전북 지역 학교 급식 영양사의 학교 급식 시설${\cdot}$설비에 대한 만족도 연구)

  • Choi, Hyu-Yeun;Rho, Jeong-Ok
    • The Korean Journal of Food And Nutrition
    • /
    • v.20 no.2
    • /
    • pp.218-225
    • /
    • 2007
  • This study was conducted to investigate the satisfaction of school dietitians with foodservice facilities and utilities in the Chonbuk area of Korea. Self-administered questionnaires were collected from a total of 22 dietitians. Statistical data analysis was completed using the SPSS v. 10.0 program. The results are summarized as follows. Among the 222 school foodservice systems, 68.5% of the schools prepared meals the conventional way and 31.5% prepared them the commissary way. Most of the school foodservice facilities were located on the first floor. Satisfaction with the location of the foodservice facility was not significantly different between the conventional and commissary systems. However, overall dietitian satisfaction with the foodservice facility locations was poor. Approximately 30% of the dietitians responded that one of the most important problems for foodservice management was the limited space and worn-out equipments in the kitchens. For dietitians' satisfaction on the types of facilities present, most schools had constructed dietitian offices, food storage facilities, cafeterias, rest rooms, dressing rooms, and preparation facilities. Yet, the amenities most often missing were storage facilities, preparation facilities, dressing rooms, rest rooms, etc. For overall satisfaction with the status of facilities and utilities, we found no significant differences between dietitians in the conventional(2.89) and commissary foodservice systems(2.86); however, the satisfaction level among the dietitians was poor. Therefore, governmental regulation agencies need to review and approve plans prior to the new construction or extensive remodeling of school foodservice facilities. Finally, content analysis was also conducted regarding the dietitians' opinions on foodservice facilities and utilities.

The Actual Conditions and Improvement of the Eco-Forests Mater Plan, South Korea (우리나라 생태숲조성 기본계획 실태 및 개선방향)

  • Heo, Jae-Yong;Kim, Do-Gyun;Jeong, Jeong-Chae;Lee, Jeong
    • Korean Journal of Environment and Ecology
    • /
    • v.24 no.3
    • /
    • pp.235-248
    • /
    • 2010
  • This study was carried out to the actual conditions and improvement of the eco-forests master plan in South Korea, and suggested its problems and improvement direction. Results from survey and analysis of limiting factors or constraints in the construction plans of eco-forests in Korea revealed that there were highly frequent problems involving site feasibility, topographic aspect, and existing vegetation. The results of survey on the status of land use indicated that the average ratio of the use of private estate was 29.7%, so then it was estimated that a great amount of investment in purchase of eco-forest site would be required. Results from survey on major introduced facilities showed that there was high frequency of introduction of infrastructure, building facility, recreational facility, convenience facility, and information facility, and that there was low frequency of introduction of plant culture system, ecological facility, structural symbol and sculpture, and the likes. There was just one eco-forest park where more than 500 species of plants grew, and the result of investigation indicated that the diversity of plant species in 11 eco-forest parks was lower than the standards for construction of eco-forest. Results from analysis of the projects costs revealed that investment cost in facilities was higher than planting costs, and that a large amount of investment was made in the initial stage of the project. There was no planned budget for the purpose of cultivating and maintaining the plants and vegetation after construction of eco-forest. The basic concepts in construction of eco-forests were established according to the guidelines presented by the Korea Forest Service; however, the detailed work of the project was planned with its user-oriented approach. Then the construction of eco-forest was being planned following the directions, which would lead to development of a plant garden similar to arboretum or botanical garden. Therefore, it is required that the architect who designs eco-forest as well as the public officer concerned firmly establish the concepts of eco-forest, and that, through close analysis of development conditions, a candidate site to fit the purpose of constructing eco-forest be selected, and also a substantive management plan be established upon completion of construction of eco-forest.