• 제목/요약/키워드: Schematic design

검색결과 363건 처리시간 0.027초

실안의 수정체 굴절률 분포를 갖는 정밀모형안 설계 (Design of the Finite Schematic Eye with the Crystalline Lens with GRIN Index)

  • 김봉환
    • 한국광학회지
    • /
    • 제18권2호
    • /
    • pp.167-170
    • /
    • 2007
  • 젊은 한국인 정시안에 대한 임상 자료를 가지고 구면수차 이외에 비축수차인 비점수차, 상면만곡과 왜곡수차들을 포함하는 실안의 광학적 성능과 유사한 정밀모형안을 설계하였다. 또한 수정체가 갖는 Gradient index 형태의 매질을 광학적으로 조사하였고, GRIN 매질을 수정체에 도입하여 정밀모형안을 설계하였다.

果川(과천) 갈현 초(初).중학교(中學校) 계획설계(計劃設計) 연구(硏究) (A Schematic Design Study for Galhyeon Elementary.Middle School in Gwacheon)

  • 임창복;서기영;정진국
    • 교육시설
    • /
    • 제10권1호
    • /
    • pp.54-65
    • /
    • 2003
  • This paper aims to analyse design conditions and propose schematic design for Galhyeon Elementary Middle School in Gwacheon. As for site conditions, it has the size of $32,000m^2$ and Hilly areas. And the area is surrounded high density housing. As a program, Education Facilities Bureau required to provide 36 classes and supporting facilities. To design the schemes, we followed the 7th education policy guidelines. During the design development stage, 3 alternatives are suggested as in the paper. However, staffs of Education Bureau and teachers favoured and selected our scheme, which gives symbolic image, as a new high school education environment.

포항(浦港) 장성고등학교(長城高等學校) 계획설계(計劃設計) 연구(硏究) (A Schematic Design Study for Jangsung High School in Pohang)

  • 임창복;양관목
    • 교육시설
    • /
    • 제9권4호
    • /
    • pp.5-13
    • /
    • 2002
  • This paper aims to analyse design conditions and propose schematic design for Jangsung High School in Pohang. As for site conditions, it has the size of $14,900m^2$ and a rather flat condition near to the ocean East Sea. And the area is under development with land subdivision method expecting high density housing around it. As a program, Education Facilities Bureau required to provide 36 classes and supporting facilities. To design the schemes, we followed the 7th education policy guidelines. During the design development stage, 3 alternatives are suggested as in the paper. However, staffs of Education Bureau and teachers favoured and selected our scheme, which gives symbolic image, as a new high school education environment.

구미(龜尾) 도량고등학교(高等學校) 계획설계(計劃設計) 연구(硏究) (A Schematic Design Study for Doryang High School in Gumi)

  • 임창복;이준혁
    • 교육시설
    • /
    • 제9권6호
    • /
    • pp.15-23
    • /
    • 2002
  • This paper aims to analyse design conditions and propose schematic design for Doryang High School in Gumi. As for site conditions, it has the size of $14,988m^2$ and a rather flat condition. And the area is under development with land subdivision method expecting high density housing around it. As a program, Education Facilities Bureau required to provide 36 classes and supporting facilities. To design the schemes, we followed the 7th education policy guidelines. During the design development stage, 3 alternatives are suggested as in the paper. However, staffs of Education Bureau and teachers favoured and selected our scheme, which gives symbolic image, as a new high school education environment.

Schematic Estimation Process using Architectural Object BIM Library

  • Lee, Ji Yong;Kim, In Han;Choi, Jung Sik
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.289-293
    • /
    • 2015
  • The construction industry has been evolving with the development of information technology. According to this trend, the current industry changes from 2d drawings to Building Information Modeling(BIM). Current studies on the BIM-based estimation have problems such as Quantity Take-Off(QTO) specificity toward a particular software, the uncertainty of the amount in accordance with the model quality. These studies focus on QTO based on BIM rather than schematic estimation. In addition, studies on the connection with the QTO and unit cost for schematic estimation are insufficient. The purpose of this study is to propose schematic estimation process by utilizing construction codes and QTO in architectural object BIM libraries. Construction codes are classified in detail in order to input codes inside each. This study has connected unit cost and construction classification codes that obtain from BIM model. The results of this study will be helpful in decision-making and communication for schematic estimation of the design phase. It will improve the efficiency and reliability problems of existing schematic estimation.

  • PDF

한강교량 경관조명의 기본계획에 관한 연구 (The study on the schematic design of outdoor lighting for Han river bridges)

  • 정근영;정봉근;이준형;최안섭
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2001년도 학술대회논문집
    • /
    • pp.27-30
    • /
    • 2001
  • This paper describes the geographical and cultural characteristics of Han river and presents a schematic design of outdoor lighting for Han river bridges. Basic design concept for Han river and detail theme for each bridge was developed. With lighting simulation program, lamp, color, and image of bridge in Han river modeled and simulated. Lighting visualizations of the three major bridges were shown and detail design concept for such bridges were introduced.

  • PDF

BlM 도구의 사용자 인터페이스 개선사항에 관한 연구 - 건축기획과 계획 설계 과정을 중심으로 - (A Study on Improving Usability focused User Interface in the BIM tool sets - Focused on Preliminary-Design and Schematic-Design in Architecture -)

  • 정혁진
    • 한국디지털건축인테리어학회논문집
    • /
    • 제9권1호
    • /
    • pp.31-40
    • /
    • 2009
  • This study is intended to suggest methodologies in theory that is dedicated to improve existing features in BlM tool sets and introduce a new horizon for developing new features in the future so that more functionality can be provided to the work process of architect. To be more utilized of BlM tool sets in a useful way, it is important to make sure to program a calculation method used in the design process which is based on the information provided by architect, such as design item with detailed process and transformed parametric information on warranty data. Finding pros and cons in the usability from the well-known 3D modeling applications and taking highly usable UI features from the existing applications, and using a common wording were carried out. Design architect identifies reusable parametric information and then finds an algorithm between each items so that BlM tool sets can contribute to design field in the future. Therefore, the formula has been developed for the items considering business aspects and architecturing size in the preliminary-design, and design aspects in the schematic design with idendifying inputs and outputs that is necessary to become fixed factors.

  • PDF

BIM 적용을 위한 계획설계 단계의 파라메트릭 설계방법에 관한 연구 - 교과교실제 설계를 중심으로 - (A Research on the Parametric Design Method in Schematic Design Phase for BIM application - Focused on Subject Classroom Design of Variation Type -)

  • 윤용집;강태웅
    • 교육시설 논문지
    • /
    • 제20권5호
    • /
    • pp.11-18
    • /
    • 2013
  • This study has revisited the definition and characteristics of BIM to contribute to the better understanding of this concept. For the successful application of BIM in architectural design field, it should start with public buildings like schools which can be standardized. Since a number of conditions of school design appear to suit the schematic design phase for BIM application more than do other types of building design, the viability of BIM was examined by applying parametric modeling(one of BIM's basic characteristics) to mass study in schematic design phase for the configuration of schools that adopt the variation type of subject classroom design of the $7^{th}$ National Educational Curriculum. In addition, this modeling technique was used with software of Rhino 3D and Grasshopper, which will have a linkage to environmental analysis in near future. Finally, it can be expected that the work efficiency will be maximized if BIM is going to be applied in the early design stage instead of the end stage.

설계단계에서 건축주 만족도 증진을 위해 가치평가방법을 활용한 설계자 접근절차에 대한 연구 (The Study of Designer's Approaching Procedure by Applying Value Evaluation Method to improve Degree of Owner's Satisfactions in Design Phase)

  • 이도형;박찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.117-122
    • /
    • 2006
  • 기본설계단계에서 설계자가 건축주 요구사항 만족을 위해 접근하는 방법이 다양하나, 설계과정에서 건축주 및 관련자가 참여하여 정량적으로 설계의 중간과정을 평가하는 것이 부족하다. 이로 인해 설계가 완료된 후에 수많은 변경을 하여 설계자로 하여금 많은 손해를 입게 한다. 이러한 것을 방지하지 위해 기본설계 초기단계에서부터 건축주의 요구사항을 체계적으로 정리하고, 설계자는 그 것을 만족시키는 설계 초안에 대해 건축주 및 관련자들에게 가치평가를 하게한다. 이 후로 일정가치가 이상이 되면 다음 설계단계로 진행되게 하여, 설계가 완료된 후에 건축주의 의도가 제대로 반영되지 않거나 건축주가 의사를 변경하여 발생되는 재설계를 방지하게 함으로써 설계자의 추가 비용을 현저히 줄일 수 있다. 또한 건축주도 설계결과 및 시공결과에 대해 평가하게 하고 건축주의 의도가 제대로 반영되었는지를 알 수 있게 한다. 또한 건축주의 만족도를 평가하게 하고, 건축주나 설계자가 상호 설계 및 시공결과를 정량적으로 확인시켜 시공 후에 발생되는 논란을 최소화 시킨 수 있는 장점이 있다. 본 논문은 설계과정에서 각 결과물에 대해 가치를 평가한 후 일정 전수가 이상 되면 다음단계로 넘어가게 하여 설계자의 손해를 최소화 시킬 수 있다는 것을 나타낸 것이다.

  • PDF

건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 - (Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project -)

  • 김수민;조재호;이종식;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.212-215
    • /
    • 2008
  • 건축공사의 공사비 절감은 시공단계보다 사업초기단계 및 설계단계에서 정확한 공사비 예측을 함으로써 더욱 효율적으로 절감될 수 있다. 하지만 현행 공공 건설공사의 공사비 산정 및 관리는 실시설계 이후로 집중되어 있어, 계산견적을 중심으로 실시되는 기획 및 기본설계단계에서의 사업비관리는 매우 취약하다고 볼 수 있다. 이에 본 연구에서는 현행 공사비 산정 방법의 문제점 및 실적공사비 사례정보 분석하여 기본설계단계에서 구체적 비용 계획을 세우고 이에 부합되는 설계가 진행되는지 검토 가능한 공사비 산정모델 개발을 위한 예비적 연구를 수행하였다.

  • PDF