• 제목/요약/키워드: Schematic design

검색결과 363건 처리시간 0.026초

한국인 안구의 임상자료를 통한 모형안 설계 (Design of the Schematic Eye of Koreans using the Clinical data)

  • 김봉환;김세진;임현선;지택상
    • 한국안광학회지
    • /
    • 제9권1호
    • /
    • pp.117-124
    • /
    • 2004
  • 본 논문에서는 한국인 안구의 영상자료를 가지고 실안에 유사한 광학적 성능을 갖는 모형안을 설계하였다. 설계 시 활용된 한국인 안구의 임상자료로는 기존에 조사 되어진 젊은 사랑의 정시안 임상자료를 가지고, 그 평균값을 구하여 기초 설계 제원으로 삼았다. 설계 목표로는 구연수차와 비점수차가 실안과 유사한 성능을 갖도록 설정하였다.

  • PDF

오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델 (Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs)

  • 박성호;구교진;박성철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

An Integrated ECAD Library System for Standard Part Management in a Heterogeneous ECAD Environment

  • Yoo, Byung-Hoon;Lee, Hwa-Jong;Rho, Ho-Chang
    • 산업공학
    • /
    • 제7권1호
    • /
    • pp.67-74
    • /
    • 1994
  • In this study, we propose an integrated CAD(Computer Aided Design) library database in a heterogeneous commercial ECAD(Electronic CAD) environment. To effectively solve engineering problems focused on BOM data extraction we use a software system called schematic capture and company-wide standard electronic part information loaded on different commercial ECADs. We unify many commercial ECADs into one schematic capture and a variety of PCB(Printed Circuit Board) design tools. For this purpose we develope a model for linking CAD symbol library with company-wide standard part information. We also develope a schematic design data conversion scheme and show how to extract PBA level BOM data using our customized schematic capture. This system is being operated in an X-Window based engineering work station and commercial RDBMS base.

  • PDF

오브젝트-파라미터기반 건축마감공사비 개산견적 모델 (Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings)

  • 구교진;박성호;박성철;송종관
    • 한국건설관리학회논문집
    • /
    • 제9권6호
    • /
    • pp.175-184
    • /
    • 2008
  • 건설 프로젝트의 수익성 및 타당성을 판단하기 위한 기준으로 설계초기단계에 활용되는 개산견적은 설계의사결정 업무와 밀접한 연계성을 가지고 수행되어야 할 뿐만 아니라, 정확하고 신뢰성 있는 견적결과를 도출해야 한다. 설계초기단계에서 설계자의 의사결정 지원과 설계변경에 대한 즉각적인 대처를 위해 프로토타입기반 개산견적 시스템이 개발되었지만, 파라미터에 의해 산정되는 공사항목 및 사용자에 의한 추가공사에 대한 공사비 고려가 미흡하였다. 따라서 본 연구에서는 견적의 정확도를 향상시키기 위해 실제 고층 오피스 빌딩 프로젝트의 실적자료 분석을 통해 기본설계단계에서 오브젝트-파라미터기반 건축마감공사비 산정 모델(Object & Parameter based Schematic Estimation Model, OPSEM)을 개발하였다. 모델 개발을 위해 공사비 내역서, 도면으로부터 얻은 작업항목에 대한 정보를 분석 및 분류하고, 각 작업항목 속성에 맞는 공사비 산정 방식을 제안하였다. 본 연구의 실무 효용성 검증을 위해 유사 사례 프로젝트를 바탕으로 기존의 견적방식과 제시된 모델을 활용한 견적방식의 오차율을 분석하여 정확도 비교를 실시하였다.

기술초대석 I - IFC를 이용한 기본설계단계 철근배근의 표현 (Representation of Rebar using IFC at Schematic Structural Design Stage)

  • 정종현;김치경;김지현
    • 건축구조
    • /
    • 제19권4호
    • /
    • pp.51-60
    • /
    • 2012
  • In recent years, BIM has been applied to many building projects. However, IFC, which is the core technology of data exchange in BIM, has not been used widely. In particular, IFC has almost never been used to represent rebars in RC structures. This is because the lack of understanding and utilization strategy for data model of IFC on rebars. The purpose of this study is to store and manage the data on rebars using IFC at the schematic design stage. For this, we investigated the data to represent rebars for RC members, such as beam, column, wall, and slab at the schematic design stage. And, we analyzed the data model of IFC on rebars at the schematic design stage. Based on these investigation and analysis on data, we proposed the strategy for utilization of the data model of IFC on rebars. Finally, for verification, we generated a sample IFC file to represent the rebars of a simple RC structure according to the proposed strategy and imported the sample IFC file into the software, which we developed for this study. Based on the results of the import, we concluded that the data on rebars can be stored and managed using the proposed strategy for utilization of the data model of IFC on rebars.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

스키메틱 자동생성기의 개발 (The Development of Automatic Schematic Generator)

  • 배영환;백영석;박성범;이성봉;장영조;이현찬
    • 전자공학회논문지A
    • /
    • 제28A권9호
    • /
    • pp.761-773
    • /
    • 1991
  • In this paper, an algorithm for automatic schematic generation which creates schematic diagram from netlist are proposed. The important objectives on schematic generation are readability and clarity of resulting schematics. Each stage of generation should aim at enhancing these objectives. For this reason, schematic generation problem is divided into 5 subproblems` preprocessing, logical placement, pin assignment and improvement of placement, global routing, and detailed routing. The algorithm is implemented in C language, and it generates schematics from the results of logic synthesis in order to make it east for designers to understand the design and reflect their knowledge into design.

  • PDF

일제강점기 도청사.부청사의 설계주체와 설계과정 (Planning Organizations and Planning Process of To(道) and Pu(府) Government Office Buildings under the Rule of Japanese Imperialism)

  • 김명선
    • 한국실내디자인학회논문집
    • /
    • 제20권2호
    • /
    • pp.102-109
    • /
    • 2011
  • Under the rule of Japanese Imperialism, there were two kinds of architectural government organizations inside the Chosun(朝鮮) Governor-General which designed To(道) and Pu(府) government office buildings; one was the organization inside the central government office and the other inside the local government offices(To and Pu). By the administrative approval procedure of the Chosun Governor-General, the local architectural organization planned site and floors of the building in the schematic design stage, and in the detail design stage not only the central but sometimes the local planned the building design. The design accomplished by the local in schematic stage was believed as a kind of guideline in detail design and the local organization was able to insist their own needs to the central and to change the central's planning. Even though the central had the authority of the design, the local took part in the planning of To and Pu government office buildings at least in the schematic design stage.

Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage

  • Choi, Jungsik;Kim, Hansaem;Kim, Inhan
    • Journal of Computational Design and Engineering
    • /
    • 제2권1호
    • /
    • pp.16-25
    • /
    • 2015
  • Since construction projects are large and complex, it is especially important to provide concurrent construction process to BIM models with construction automation. In particular, the schematic Quantity Take-Off (QTO) estimation on the BIM models is a strategy, which can be used to assist decision making in just minutes, because 70-80% of construction costs are determined by designers' decisions in the early design stage. This paper suggests a QTO process and a QTO prototype system within the building frame of Open BIM to improve the low reliability of estimation in the early design stage. The research consists of the following four steps: (1) analyzing Level of Detail (LOD) at the early design stage to apply to the QTO process and system, (2) BIM modeling for Open BIM based QTO, (3) checking the quality of the BIM model based on the checklist for applying to QTO and improving constructability, and (4) developing and verifying a QTO prototype system. The proposed QTO system is useful for improving the reliability of schematic estimation through decreasing risk factors and shortening time required.

영향변수에 따른 수량변화 분석을 이용한 기본설계단계의 개산견적 모델 개발 (Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase)

  • 손보식;이현수;김성태
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.155-166
    • /
    • 2007
  • 본 연구는 건축공사 프로젝트의 기본 설계 단계에서의 개산견적 개념모델을 제안하고, 제안된 개산견적 개념을 적용하여 실제 주상복합 건물 프로젝트의 실적자료의 분석을 바탕으로 한 프로토타입 개발을 목적으로 한다. 국내의 건설산업은 급격한 시장 변화와 경쟁 심화의 과정을 겪고 있다. 특히 프로젝트의 조달 방식의 변화와 함께 입찰과 관련한 정보가 부족한 사업초기, 기본설계 단계에서 중요한 의사 결정이 이루어지며, 이러한 의사 결정의 기준이 되는 개산 견적의 중요성이 더욱 증가 되고 있다. 따라서 본 연구에서는 기존의 개산견적 방법을 분석하고 그것을 보완할 수 있는 공사 수량 변화 분석에 기반 한 개산견적 방법을 제안하고 프로토타입을 구축하였다. 또한, 이 연구에서는 기존의 공종별 공사비 분류체계에 빌딩구성요소(BE)별 및 층별 수량 분류를 추가하고 있다. 이러한 개념을 바탕으로 제안 모델을 Q-BASE (Quantity Based Active Schematic Estimating) 모델로 정의하였다.