• Title/Summary/Keyword: Schematic design

Search Result 363, Processing Time 0.03 seconds

Design of the Schematic Eye of Koreans using the Clinical data (한국인 안구의 임상자료를 통한 모형안 설계)

  • Kim, Bonghwan;Kim, Sejin;Lim, Hyeonseon;Ji, Taeksang
    • Journal of Korean Ophthalmic Optics Society
    • /
    • v.9 no.1
    • /
    • pp.117-124
    • /
    • 2004
  • In this paper, we took the clinical data of Korean eyes and designed the schematic eye with the same optical properties of the real eye. In the design process, we took the clinical emmetorpia data of young Korean adults collected in the past and analyzed to get a basic specification of the real eye for the design of schematic eye. The purpose of design was for the schematic eye to have the same optical properties of real eye in spherical aberration and astigmatism.

  • PDF

Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs (오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델)

  • Park, Sung-Ho;Koo, Kyo-Jin;Park, Sung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

An Integrated ECAD Library System for Standard Part Management in a Heterogeneous ECAD Environment

  • Yoo, Byung-Hoon;Lee, Hwa-Jong;Rho, Ho-Chang
    • IE interfaces
    • /
    • v.7 no.1
    • /
    • pp.67-74
    • /
    • 1994
  • In this study, we propose an integrated CAD(Computer Aided Design) library database in a heterogeneous commercial ECAD(Electronic CAD) environment. To effectively solve engineering problems focused on BOM data extraction we use a software system called schematic capture and company-wide standard electronic part information loaded on different commercial ECADs. We unify many commercial ECADs into one schematic capture and a variety of PCB(Printed Circuit Board) design tools. For this purpose we develope a model for linking CAD symbol library with company-wide standard part information. We also develope a schematic design data conversion scheme and show how to extract PBA level BOM data using our customized schematic capture. This system is being operated in an X-Window based engineering work station and commercial RDBMS base.

  • PDF

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

Representation of Rebar using IFC at Schematic Structural Design Stage (기술초대석 I - IFC를 이용한 기본설계단계 철근배근의 표현)

  • Jeong, Jong-Hyeon;Kim, Chi-Gyeong;Kim, Ji-Hyeon
    • 건축구조
    • /
    • v.19 no.4
    • /
    • pp.51-60
    • /
    • 2012
  • In recent years, BIM has been applied to many building projects. However, IFC, which is the core technology of data exchange in BIM, has not been used widely. In particular, IFC has almost never been used to represent rebars in RC structures. This is because the lack of understanding and utilization strategy for data model of IFC on rebars. The purpose of this study is to store and manage the data on rebars using IFC at the schematic design stage. For this, we investigated the data to represent rebars for RC members, such as beam, column, wall, and slab at the schematic design stage. And, we analyzed the data model of IFC on rebars at the schematic design stage. Based on these investigation and analysis on data, we proposed the strategy for utilization of the data model of IFC on rebars. Finally, for verification, we generated a sample IFC file to represent the rebars of a simple RC structure according to the proposed strategy and imported the sample IFC file into the software, which we developed for this study. Based on the results of the import, we concluded that the data on rebars can be stored and managed using the proposed strategy for utilization of the data model of IFC on rebars.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

The Development of Automatic Schematic Generator (스키메틱 자동생성기의 개발)

  • 배영환;백영석;박성범;이성봉;장영조;이현찬
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.28A no.9
    • /
    • pp.761-773
    • /
    • 1991
  • In this paper, an algorithm for automatic schematic generation which creates schematic diagram from netlist are proposed. The important objectives on schematic generation are readability and clarity of resulting schematics. Each stage of generation should aim at enhancing these objectives. For this reason, schematic generation problem is divided into 5 subproblems` preprocessing, logical placement, pin assignment and improvement of placement, global routing, and detailed routing. The algorithm is implemented in C language, and it generates schematics from the results of logic synthesis in order to make it east for designers to understand the design and reflect their knowledge into design.

  • PDF

Planning Organizations and Planning Process of To(道) and Pu(府) Government Office Buildings under the Rule of Japanese Imperialism (일제강점기 도청사.부청사의 설계주체와 설계과정)

  • Kim, Myung-Sun
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.2
    • /
    • pp.102-109
    • /
    • 2011
  • Under the rule of Japanese Imperialism, there were two kinds of architectural government organizations inside the Chosun(朝鮮) Governor-General which designed To(道) and Pu(府) government office buildings; one was the organization inside the central government office and the other inside the local government offices(To and Pu). By the administrative approval procedure of the Chosun Governor-General, the local architectural organization planned site and floors of the building in the schematic design stage, and in the detail design stage not only the central but sometimes the local planned the building design. The design accomplished by the local in schematic stage was believed as a kind of guideline in detail design and the local organization was able to insist their own needs to the central and to change the central's planning. Even though the central had the authority of the design, the local took part in the planning of To and Pu government office buildings at least in the schematic design stage.

Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage

  • Choi, Jungsik;Kim, Hansaem;Kim, Inhan
    • Journal of Computational Design and Engineering
    • /
    • v.2 no.1
    • /
    • pp.16-25
    • /
    • 2015
  • Since construction projects are large and complex, it is especially important to provide concurrent construction process to BIM models with construction automation. In particular, the schematic Quantity Take-Off (QTO) estimation on the BIM models is a strategy, which can be used to assist decision making in just minutes, because 70-80% of construction costs are determined by designers' decisions in the early design stage. This paper suggests a QTO process and a QTO prototype system within the building frame of Open BIM to improve the low reliability of estimation in the early design stage. The research consists of the following four steps: (1) analyzing Level of Detail (LOD) at the early design stage to apply to the QTO process and system, (2) BIM modeling for Open BIM based QTO, (3) checking the quality of the BIM model based on the checklist for applying to QTO and improving constructability, and (4) developing and verifying a QTO prototype system. The proposed QTO system is useful for improving the reliability of schematic estimation through decreasing risk factors and shortening time required.

Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase (영향변수에 따른 수량변화 분석을 이용한 기본설계단계의 개산견적 모델 개발)

  • Son, Bo-Sik;Lee, Hyun-Soo;Kim, Sung-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.155-166
    • /
    • 2007
  • The purpose of this research is to develop a conceptual model and prototype that establishes a new approach for building cost estimating in the schematic design phage. This research use the method that analyzes quantity and unit price separately to enhance schematic cost estimating through conducting literature review andi analyzing existing schematic cost estimating methods. In addition, this study proposes tile concept of cost breakdown structure including two more classifications: building element and floor compared to existing one only classified by trade. Thus, a Quantity Based Active Schematic cost Estimating(Q-BASE) model is developed founded on those two concepts. By applying proposed schematic cost estimating model, historical structure cost of residential complex building project is analyzed, and then, based on this analysis, prototype is implemented.