• Title/Summary/Keyword: Schedule risk

Search Result 222, Processing Time 0.028 seconds

민자사업의 사업관리 사례분석

  • Lee Kwan-Young;Kim Se-Jong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.13-19
    • /
    • 2004
  • In most PFI(Private Finance Initiative) projects in Korea, the project management are in charge of the Special Purpose Company(SPC) established for carrying out the project. This paper is a case study about an owner CM executed by the organizations and staffs of SPC itself. : Seoulbeltway (Ilsan $\~$ Toegaewon) Private Investment Project. In time management area, the SfC was the leader of project management throughout the life circle - plan, design, permit, construction, operation and maintenance - beyond the schedule manager's role. In cost management area, the methods of reducing the total costs by VE, new technologies, etc. has been needed assuming the construction risks were subject to SPC.

  • PDF

Design of maturity model for software project management level evaluation (소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.4
    • /
    • pp.609-615
    • /
    • 2011
  • In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.

Korean Nurses' Knowledge about Hereditary Colorectal Cancer (국내 간호사의 유전성 대장암 지식정도)

  • Choi, Kyung-Sook;Kim, Hack-Sun;Park, Jung-Ae;Lee, Joo-Hyun
    • Asian Oncology Nursing
    • /
    • v.11 no.2
    • /
    • pp.147-154
    • /
    • 2011
  • Purpose: This study was performed to evaluate Korean nurses' knowledge about hereditary colorectal cancer (HCRC). Methods: A modified 15-item HCRC knowledge questionnaire was developed based on previous research. One hundred and forty-eight nurses have completed the questionnaire from February to April, 2011. Results: The average score of nurses' knowledge was $11.25{\pm}1.54$. Ninety-seven percent of nurses knew about colonoscopy check up schedule and family pedigree. However, only 20% of nurses knew about the rate of passing on mutation genes to offspring and risk of developing CRC among carriers. Only 13.5% of nurses had previous genetic education experiences. Working in oncology units, taking care of CRC patients, and participating in genetic education were not associated with nurses' HCRC knowledge. Conclusion: Various factors influence nurses' knowledge about HCRC. Repeated study with larger national sample of nurses is recommended to identify the factors affecting nurses' knowledge level in order to develop efficient genetic education programs for HCRC patients and their families by nurses.

A parametric study on the use of passive fire protection in FPSO topside module

  • Friebe, Martin;Jang, Beom-Seon;Jim, Yanlin
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.6 no.4
    • /
    • pp.826-839
    • /
    • 2014
  • Fire is a continuous threat to FPSO topside modules as large amounts of oil and gas are passing through the modules. As a conventional measure to mitigate structural failure under fire, passive fire protection (PFP) coatings are widely used on main structural members. However, an excessive use of PFP coatings can cause considerable cost for material purchase, installation, inspection and maintenance. Long installation time can be a risk since the work should be done nearly at the last fabrication stage. Thus, the minimal use of PFP can be beneficial to the reduction of construction cost and the avoidance of schedule delay. This paper presents a few case studies on how different applications of PFP have influence on collapse time of a FPSO module structure. A series of heat analysis and thermal elasto-plastic FE analysis are performed for different PFP coatings and the resultant collapse time and the amount of PFP coatings are compared with each other.

Appraisal of re-irradiation for the recurrent glioblastoma in the era of MGMT promotor methylation

  • Kim, Il Han
    • Radiation Oncology Journal
    • /
    • v.37 no.1
    • /
    • pp.1-12
    • /
    • 2019
  • Despite recent innovation in treatment techniques and subsequently improved outcomes, the majority of glioblastoma (GBL) have relapses, especially in locoregional areas. Local re-irradiation (re-RT) has been established as a feasible option for recurrent GBL of all ages with safety, tolerability, and effectiveness both in survival and quality of life regardless of fractionation schedule. To keep adverse effects under acceptable range, cumulative dose limit in equivalent dose at 2 Gy fractions by the linear-quadratic model at α/β = 2 for normal brain tissue (EQD2) with narrow margin should be observed and single/hypofractionated re-RT should be undertaken very carefully to recurrent tumor with large volume or adjacent to the brainstem. Promising outcome of re-operation (re-Op) plus re-RT (re-Op/RT) need to be validated and result from re-RT with temozolomide/bevacizumab (TMZ/BV) or new strategy is expected. Development of new-concept prognostic scoring or risk group is required to select patients properly and make use of predictive biomarkers such as O(6)-methylguanine-DNA methyltransferase (MGMT) promotor methylation that influence outcomes of re-RT, re-Op/RT, or re-RT with TMZ/BV.

Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects

  • Cha Hee Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.144-152
    • /
    • 2004
  • Defining value as a measure of how well the project value objectives are met, Value Management Process (VMP) is considered to be any management effort or process that can proactively pursue one or more project objectives (i.e., security/safety, cost effectiveness, schedule optimization, and risk containment). The collection of 44 VMPs has been established based on a rigorous effort conducted by Construction Industry Institute (CII). Because varying circumstances on each project determine the level of suitability, it is crucial to identify which VMP should be implemented on a particular project. The current VMP selection process is primarily based on human intuition. The main objective of this paper is to provide a systematic method to facilitate the usage of VMPs on a particular project. This paper identified and quantified the selection principles (i.e., targeted value objectives, timing of initiation, project characteristics, and relative impact). The data collected from industry practitioners and VMP experts characterized each VMP in terms of the magnitude of benefit. An automated selection tool by Visual Basic Application (VBA) on MS Excel TM, was developed and proved its validity. As a pioneering study, this paper provides a comprehensive and structured knowledge on the subject of VMPs. From the industry's perspective, the automated selection tool, the premier of this study, contributes the facilitation of the VMP implementations in the construction industry thereby maximizing the potential benefits to a particular project.

Calculation of Sample Size for Guided Missile Considering Test Method and Reliability Growth (유도무기 시험평가 방법과 신뢰성 성장을 고려한 시험 수량 산출)

  • Lee, Youn-ho;Kim, Jae-hwang;Lee, Kye-shin;Lee, Jong-sin;Lee, Myoung-jin;Kim, Doo-hyun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.20 no.6
    • /
    • pp.844-852
    • /
    • 2017
  • Since guided weapon is high-cost and one-shot device which is non-reusable, it requires a lot of resources to prove required accuracy as a part of reliability demonstration. Once a test for proving accuracy rate of guided missile fails, it causes an additional cost and delay of schedule. This study introduces an equation for proper sample size and plan for guided-missile accuracy rate test in order to minimize the risk of test failure. Proper sample size for the test is derived by considering the reliability growth. Furthermore, each task for accuracy rate test is defined according to the development step. Therefore, this study can contribute to reduce sample size for accuracy rate test in order to meet the reliability requirement and assure transparency in the test process.

Associations between Sleep and Work-Related Cognitive and Emotional Functioning in Police Employees

  • Sorengaard, Torhild Anita;Olsen, Alexander;Langvik, Eva;Saksvik-Lehouillier, Ingvild
    • Safety and Health at Work
    • /
    • v.12 no.3
    • /
    • pp.359-364
    • /
    • 2021
  • Aim: We aimed to examine the cross-sectional and longitudinal associations between sleep and work-related impaired cognitive and emotional functioning in police employees. Methods: This study included 410 participants (52% men) employed in a police district in Norway at baseline, of which 50% also participated in the study at 6 months later follow-up. The questionnaires included items measuring work schedule, sleep length, insomnia, as well as impaired cognitive and emotional functioning at work. Results: The results showed that insomnia was related to impaired work-related emotional functioning measured at baseline, and to impaired cognitive functioning measured at both baseline and follow-up. Sleep length and rotating shift work were not associated with future decline in cognitive or emotional functioning. Conclusion: Our study indicates that the relationship between insomnia and emotional functioning at work may be transient, whereas insomnia can be related to both immediate and future impaired cognitive functioning. Replication of the findings in larger samples is advised. The findings call for an emphasis on the prevention and treatment of sleep problems among police employees as a mean of maintaining and improving cognitive and emotional functioning at work, and thereby reducing the risk for impaired performance and negative health and safety outcomes.

Development of Prediction Models of Dressroom Surface Condensation - A nodal network model and a data-driven model - (드레스룸 표면 결로 발생 예측 모델 개발 - 노달 모델과 데이터 기반 모델 -)

  • Ju, Eun Ji;Lee, June Hae;Park, Cheol-Soo;Yeo, Myoung Souk
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.169-176
    • /
    • 2020
  • The authors developed a nodal network model that simulates the flow of moist air and the thermal behavior of a target area. The nodal network model was enhanced using a parameter estimation technique based on the measured temperature, humidity, and schedule data. However, the nodal model is not good enough for predicting humidity of the target space, having 55.6% of CVRMSE. It is because re-evaporation effect could not be modeled due to uncertain factors in the field measurement. Hence, a data-driven model was introduced using an artificial neural network (ANN). It was found that the data-driven model is suitable for predicting the condensation compared to the nodal model satisfying ASHRAE Guideline with 3.36% of CVRMSE for temprature, relative humidity, and surface temperature on average. The model will be embedded in automated devices for real-time predictive control, to minimize the risk of surface condensation at dressroom in an apartment housing.

A Study on the Gate Review of Small and Medium-Sized Plants (SE 프로세스를 적용한 플랜트의 게이트 리뷰 프로세스 발전 방안)

  • Jin Il, Kim;Choong Sub, Yeum;Joong Uk, Shin;Sang Bae, Lee
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.2
    • /
    • pp.24-39
    • /
    • 2022
  • For the success of the plant project, it is necessary to review the project's progress through technical and business reviews at an appropriate time, such as design and construction, and determine whether to invest or to proceed with the project to manage risks. In particular, since the plant development projects are not mass-produced, trial and error in design and construction can have severe impacts in terms of cost and schedule. To this end, gate reviews are currently being conducted in plants and other industrial sectors, but there are few studies on how to conduct gate reviews suitable for the plant field. In addition, there is little literature to refer to when conducting gate reviews. So, in this study, we present an overall framework that includes the types of gate reviews to be performed and items to be checked in each gate review on small and medium-sized plant development projects in which the owner directly develops and operates plants.