• Title/Summary/Keyword: Schedule information

Search Result 1,096, Processing Time 0.025 seconds

Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

  • Kim, Hyun-Joo
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.1-10
    • /
    • 2019
  • In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

A Study constructing a Function-Based Records Classification System for Korean Individual Church (한국 개(個)교회기록물의 기능분류 방안)

  • Ma, Won-jun
    • The Korean Journal of Archival Studies
    • /
    • no.10
    • /
    • pp.145-194
    • /
    • 2004
  • Church archives are the evidential instruments to remember church activity and important information aggregate which has administrative, legal, financial, historical, faithful value as the collective memory of church community. So it must be managed necessarily and the management orders are based on the Bible. The western churches which have a correct understanding about the importance of church records and management order have taken multilateral endeavor to create, manage church archives systematically. On the other hand, korean churches don't have the records management systems. Therefore, Records created in individual church are mostly managed unsystematically and exist as 'backlogs', finally, they are destructed without reasonable formalities. In those problems, the purpose of this study is to offer the way of records classification and disposition instrument with recognition that records management should be done from the time of creation or previous to it. As a concrete device for them, I tried to embody the function-based classification method and disposal schedule. I prefer the function-based classification and disposal schedule to the organization and function-based classification to present stable classification and disposal schedule, as we can say the best feature of the modern organization is multilateral and also churches have same aspect. For this study, I applied DIRKS(Designing and Implementing Recordkeeping Systems) manual which National Archives of Australia provide and guidelines in ICA/IRMT series to construct the theory of the function-based classification in individual churches. Through them, it was possible to present a model for preliminary investigation, analysis of business activity, records survey, disposal schedule. And I took an example of 'Myong Sung Presbyterian Church' which belong to 'The Presbyterian church in Korea'. I explained in detail codifying process and results of preliminary investigation in 'Myong Sung Presbyterian Church', analysis of business activity based on it, process of presenting the function-based classification and disposal schedule got from all those steps. For establishing disposal schedule, I planned 'General Disposal Schedule' and 'Agency Disposal Schedule' which categorized 'general function' and 'agency function' of an agency, according to DIRKS in Australia and ICA/IRMT. And for estimation of disposal date I had a thorough grasp of important records category presented in 'Constitution of General Assembly', interview to know the importance of tasks, and added examples of disposal schedule in western church archives. This study has significance that it was intended to embody 'the function-based classification' and 'disposal schedule' suitable for individual church, applying DIRKS in Australia and ICA/IRMT on absence of the theory or example which tried to present the function-based classification and disposal schedule for individual church. Also it is meaningful to present a model that can classify and disposal real records according to the function in individual church which has no recognition or way about records management.

Design and Implementation of Scheduler Applications for Efficient Daily Management (효율적 일상 관리를 위한 일정관리 어플리케이션의 설계와 구현)

  • Park, Eunju;Han, Seungjun;Yoon, Jimin;Lim, Hankyu
    • Journal of Internet Computing and Services
    • /
    • v.22 no.2
    • /
    • pp.41-50
    • /
    • 2021
  • According to the progress of IT and data processing technology, the usage of internet increased rapidly and various smart devices are appearing. As such, modern people use smartphone to acquire informations they wish and also on daily life including leisure activity free of place. This study has designed and implemented schedule managing application that can help effective managing of our daily life, such as taking note of schedule and sharing appointments. The schedule managing application in this study offers diary taking, sharing the registrated schedule with other users on kakaotalk, saving the deleted schedule or diary to certain folder when users delete file, continuous alarm of daily schedule function together with schedule registration function. The application which is differentiated to other applications and raised usage is expected to effectively manage the busy everyday life.

A Study on the Operation and Special Quality of the Records Disposition Schedule (기록물분류기준표 특성 및 운영에 관한 연구)

  • Park, Yoo-Jin
    • Journal of Information Management
    • /
    • v.35 no.1
    • /
    • pp.71-91
    • /
    • 2004
  • This study focuses on establishing a base for approaching record disposition schedules, which may be felt unfamiliar, through the overview of record disposition schedules. For this purpose, this study examined the meaning of record disposition schedules, the significance and principle of their elements, and their operation. In addition, it presented tasks to perform for record disposition schedules to play a central role of record management in the future. This study showed that record disposition schedules authorize people to control and process records, and are closely related to the development and the stability of record disposition system in Korea. What is more, it proved that record disposition schedules enable the assessment of the historical values of records, so it is possible to maintain records from the perspective of historical records. Besides, record disposition schedules are important in that they contain information on organizations and their functions, based on which we can preserve and manage extrinsic information about records.

A study on the relationship between design and construction information for the Integrated Construction Information System (통합 건설 정보 시스템 구축을 위한 설계-공정 정보의 연계 방안에 관한 연구)

  • Yun Seok-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.107-114
    • /
    • 2002
  • As many software tools are used for managing construction projects, integration of their data and information is gradually becoming critical. Focusing on the integration of design and scheduling data, a generic scheduling information model is designed through this research, with appropriate consideration for past research results on construction information model and also object oriented CAD technology. In order to test the practical usage of this model, a small prototype system which can derive schedule information from the design information is implemented.

  • PDF

Automatically Registering Schedules from SMS Messages on Handheld Devices (휴대전화에서 단문 메시지로부터 일정 자동 등록)

  • Kim, Jae-Hoon;Kim, Hyung-Chul
    • Korean Journal of Cognitive Science
    • /
    • v.22 no.1
    • /
    • pp.1-18
    • /
    • 2011
  • With rapid spread of handheld devices like cellular or smart phones, a short message service (SMS) comes on the public as a communication means. SMS is very cheap and can be easily written down on the storage in order not to forget it, hence it is widely used to inform schedules (time and place). In this paper, we develop a system for automatically registering schedules extracted from SMS text messages. SMS text messages are very short and concise, but include a lot of Internet words like slangs and abbreviations. These have made it difficult to extract information on schedules from them. Also handheld devices have some limitations on computing power and storage and then applying general natural language processing modules like morphological analysis to the devices are somewhat hard. To relax these burdens, we extract schedule informations from SMS messages using machine learning methods like condition random field (CRF) without using any language processing modules and register the informations on the schedule management system of handheld devices. Our proposed automatic schedule registration system has implemented on Samsung Omnia phone for experiments.

  • PDF

Design of Protocol for Collaborative Multimedia Applications (협동적 멀티미디어 응용을 위한 프로토콜의 설계)

  • Hwang, Een-Jun
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.8 no.1
    • /
    • pp.25-35
    • /
    • 2002
  • Many multimedia presentation applications involve retrieval of objects from more than one collaborating server. Presentations of objects from different collaborating servers might be interdependent. This implies that objects should be retrieved from remote servers and delivered continuously according to given time constraints. Such applications need an estimate of the avaliable network resources to each of the collaborating servers and local system resources in order to identify a schedule for retrieving the objects composing the presentation. A collaborating server can suggest modifications of the retrieval schedule depending on its load. these modifications can potentially affect the retrieval schedule for other collaborating applications. Hence, a sequence of negotiations has to be carried out with the collaborating servers in order to commit for a retrieval schedule of the objects composing the presentation. In this paper, we propose an application sub-layer protocol, RLCP(Resource Lock Commit Protocol), for handling the negotiation and commitment of the resources required for a collaborative multimedia presentation and apply it to distributed video presentation application.

Duplication with Task Assignment in Mesh Distributed System

  • Sharma, Rashmi;Nitin, Nitin
    • Journal of Information Processing Systems
    • /
    • v.10 no.2
    • /
    • pp.193-214
    • /
    • 2014
  • Load balancing is the major benefit of any distributed system. To facilitate this advantage, task duplication and migration methodologies are employed. As this paper deals with dependent tasks (DAG), we used duplication. Task duplication reduces the overall schedule length of DAG along-with load balancing. This paper proposes a new task duplication algorithm at the time of tasks assignment on various processors. With the intention of conducting proposed algorithm performance computation; simulation has been done on the Netbeans IDE. The mesh topology of a distributed system is simulated at this juncture. For task duplication, overall schedule length of DAG is the main parameter that decides the performance of a proposed duplication algorithm. After obtaining the results we compared our performance with arbitrary task assignment, CAWF and HEFT-TD algorithms. Additionally, we also compared the complexity of the proposed algorithm with the Duplication Based Bottom Up scheduling (DBUS) and Heterogeneous Earliest Finish Time with Task Duplication (HEFT-TD).

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF

A study on progress measurement method of a construction project (건설공사의 진도율 산정 방법에 관한 연구)

  • Park se-Jung;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2003
  • It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.

  • PDF