• Title/Summary/Keyword: Schedule information

Search Result 1,101, Processing Time 0.029 seconds

Optimization of Unit Commitment Schedule using Parallel Tabu Search (병렬 타부 탐색을 이용한 발전기 기동정지계획의 최적화)

  • Lee, yong-Hwan;Hwang, Jun-ha;Ryu, Kwang-Ryel;Park, Jun-Ho
    • Journal of KIISE:Software and Applications
    • /
    • v.29 no.9
    • /
    • pp.645-653
    • /
    • 2002
  • The unit commitment problem in a power system involves determining the start-up and shut-down schedules of many dynamos for a day or a week while satisfying the power demands and diverse constraints of the individual units in the system. It is very difficult to derive an economically optimal schedule due to its huge search space when the number of dynamos involved is large. Tabu search is a popular solution method used for various optimization problems because it is equipped with effective means of searching beyond local optima and also it can naturally incorporate and exploit domain knowledge specific to the target problem. When given a large-scaled problem with a number of complicated constraints, however, tabu search cannot easily find a good solution within a reasonable time. This paper shows that a large- scaled optimization problem such as the unit commitment problem can be solved efficiently by using a parallel tabu search. The parallel tabu search not only reduces the search time significantly but also finds a solution of better quality.

Fuzzy-MOEH : Resource Constraints Project Scheduling Algorithm with Fuzzy Concept (Fuzzy-MOEH : 퍼지 개념을 이용한 자원제약 프로젝트 스케줄링 알고리즘)

  • Koh, Jang-Kwon;Shin, Ye-Ho;Ryu, Keun-Ho;Kim, Hong-Gi
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.7 no.4
    • /
    • pp.359-371
    • /
    • 2001
  • Project scheduling under resource constraint conditions have contained to many uncertain factors and it is perfonned by human experts. The expert identifies the activities of the project, decides the precedent relationships between these activities, and then construct the schedule using expected activity's duration. At this time, most of the scheduling methods concentrate on one of scheduling factor between activity duration and cost. And the activity duration, which is the most important factor in scheduling, is decided by heuristic of expert. Therefore it may cause uncertainty of activity duration decision and the use of this activity duration may increase the uncertainty of constructed schedule. This paper proposes Fuzzy-MOEH scheduling algorithm, which is the aggregation of the fuzzy number for deciding activity duration and applies the cost function for solving the problems of previous scheduling methods. This paper also analyze the utility and property of Fuzzy-MEOH algorithm through the comparison between Fuzzy-MEOH algorithm and existing MEOH algorithm.

  • PDF

A Development of the Optimization Model for Reactive Scheduling Considering Equipment Failure (장치이상을 고려한 동적 생산계획 최적화 모델 개발)

  • Ha, Jin-Kuk;Lee, Euy Soo
    • Korean Chemical Engineering Research
    • /
    • v.43 no.5
    • /
    • pp.571-578
    • /
    • 2005
  • We propose a new optimization framework for the reactive scheduling. The proposed rescheduling scheme is specially focused on how to generate rescheduling results when equipment failure occurs. The approach is based on a continuous-time problem representation that takes into account the schedule in progress, the updated information on the batches still to be processed, the present plant state, the deviations in plant parameters and the time data. To update the predictive scheduling, we used right shift rescheduling and total regeneration when equipment failure occurs. And, a practical solution to the rescheduling problem requires satisfaction of two often confliction measures: the efficiency measure that evaluates the satisfaction of a desired objective function value and the stability measure that evaluates the amount of change between the schedules before and after the disruption. In this paper, the efficiency is measured by the makespan of all jobs in the system. And, the stability is measured by the percentage change in makespan and the modified sequence deviation in the predictive scheduling and rescheduling.

Periodic Scheduling Problem on Parallel Machines (병렬설비를 위한 주기적 일정계획)

  • Joo, Un Gi
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.12
    • /
    • pp.124-132
    • /
    • 2019
  • Scheduling problems can be classified into offline and online ones. This paper considers an online scheduling problem to minimize makespan on the identical parallel machines. For dynamically arrived jobs with their ready times, we show that the sequencing order according to the ERD (Earliest Ready Date) rule is optimal to minimize makespan. This paper suggests an algorithm by using the MIP(Mixed Integer Programming) formulation periodically to find a good periodic schedule and evaluates the required computational time and resulted makespan of the algorithm. The comparition with an offline scheduling shows our algorithm makes the schedule very fast and the makespan can be reduced as the period time reduction, so we can conclude that our algorithm is useful for scheduling the jobs under online environment even though the number of jobs and machines is large. We expect that the algorithm is invaluable one to find good schedules for the smart factory and online scheduler using the blockchain mechanism.

A Study of Microscopic Energy Simulation based on BIM - Illuminance & Energy Analysis of Illuminance Sensor Lighting (BIM 기반의 미시적 에너지 시뮬레이션에 관한 연구 -조도센서등의 조도 및 에너지 분석을 중심으로)

  • Baek, Ji-Woong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.1
    • /
    • pp.384-390
    • /
    • 2019
  • The importance of architecture design focused on eco-friendly and low energy continues to grow. In addition, the energy conservation design is required from a micro-perspective. Energy simulations based on BIM have attracted recent attention because of the high efficiency. On the other hand, the parameters concerned with microscopic energy are not included in BIM data. This study examined the necessity of the sensor-light parameter using a simulation of illuminance sensor light. In this study, illuminance sensors were installed into the BIM data and the operating schedule data of sensor light were generated by an illuminance simulation. The schedule data was then inputted into the simulation application, and the reduction ratio of power consumption was verified by the simulation. According to research, the power consumption and thermal load decreased by more than 20 %. Therefore, it is necessary to supplement the sensor-light parameter into BIM data for microscopic energy conservation design. This study was not confined to checking whether sensor-light parameter is necessary or not, but to ascertaining the necessary of applying a microscopic factor to generate BIM data.

Effects of Personality by Each Sasang Constitution on Sleep (체질별 성격요인이 수면에 미치는 영향)

  • Kim, Sang-Hyuk;Park, Ki-Hyun;Jeong, Kyoungsik
    • Journal of Sasang Constitutional Medicine
    • /
    • v.33 no.3
    • /
    • pp.127-137
    • /
    • 2021
  • Objectives The purpose of this study was to identify the effects of personality by each Sasang constitution on sleep using Positive Affect and Negative Affect Schedule(PANAS) and NEO-personality inventory(NEO-PI). Methods The subjects of this study were 2,078 people who had information on Sasang constitutional type and personality(PANAS, NEO-PI) among the data established at the Korean Medicine Data Center. Sleep time and sleep quality were investigated through self-written questionnaires. Sleep time was collected by hand-writing, and sleep quality was checked on a 4 point Likert scale. Pearson correlation analysis was conducted to see the correlation between personality and sleep in each constitutional type. Logistic regression was performed using personality as independent variables to find out how much personality affects sleep time. In order to find out how much personality affects sleep quality, regression analysis was performed using personality as independent variables. Results & Conclusions Sleep time was hardly affected by personality. As a result of Pearson correlation analysis, sleep time in all subjects did not show a significant correlation with personality. In logistic regression on sleep time as the dependent variable, no statistically significant results were obtained except for the Negative Affect(NA) in Taeeumin. Sleep quality showed a statistically significant correlation with the negative affect(NA), neuroticism(N), extraversion(E), Physical Component Summary(PCS) and Mental Component Summary(MCS). As a result of regression analysis on sleep quality as the dependent variable, neuroticism(N), negative affect(NA), positive affect(PA), and extraversion(E) were found in the factors affecting sleep quality. Besides, how much personality affected sleep quality might differ in each constitution. In all constitutions, sleep quality was affected by N, but the rank of N was different in each constitution. The sleep quality of Soyangin was not affected by E, and the sleep quality of Taeeumin was specifically affected by O.

Analysis on Performance Assessment Framework of Construction Phase for Road Construction Projects (도로건설사업 시공단계 성과평가 프레임워크 연구)

  • Mun, Junbu;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.801-809
    • /
    • 2023
  • Road construction projects have a long duration so cost overruns and schedule delays are occurred. However, performance assessment system that can manage and prepare for this in advance is insufficient. In addition, road construction are affected by many factors during under construction. Therefore it is necessary to conduct performance assessment considering the characteristics of roads and prepare for similar projects in the future. The purpose of this study is to provide a framework to evaluate construction phase performance and present a performance management plan using road construction information. Also, This study conducted time adjustment between the start and the finish of the project and developed performance metrics based on absolute and relative indicator. This study analyzed the cost, schedule, and changes of the road project construction process, showing the possibility of advancement of performance assessment and how to use it when planning new road construction projects.

INTRA-AND INTERGOVERNMENTAL INFORMATION SYSTEM TO MANAGE INFORMATION IN URBAN RENEWAL PROJECT

  • Dong-bum Kim;Jin-Won Kim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.561-566
    • /
    • 2011
  • In general, the early stage of urban renewal such as preparing a master plan and processing administrative works including planning permission are conducted by local governments in Korea. The local governments need to review the status of projects that are undergone in other local governments' territories. However, no integrated information system to manage information to this end at the level of nation exists in Korea. If the system would be developed, it may support central government to obtain information on required resources at the national level. In addition, local governments can gain guidance on the process and recognize potential problematic situations from others experience. The system should include functions to collect data on project summary, cost and schedule of projects according to local governments. The expected effects from using the information system are as following. First, information generated from project practice become more credible on account of management at the national level. Because the authorized party such as system administrative agents of governments are responsible for collecting and managing data. Second, the unified information system with no regard to the place where projects progresses reduces the efforts for accumulating reference data for aiding local governments decision making by providing appropriate information timely. Also, enhanced information accessibility for stakeholders make the project process clear. Finally, oversight management is enforced with visualization technology adopted in the system, presenting master plan and mass model including information on usage by floors and progressing information graphically. Ultimately, potential challenges can be anticipated by considering records accumulated from other local governments' projects. This paper presents concept, functionalities, and architecture of information system enabling to manage data from individual projects and aggregate those for oversight management for local and central governments. As a part of systems analysis, general requirements of briefing system for governments and necessary data fields to this end are identified.

  • PDF

TASL: A Traffic-Adapted Sleep/Listening MAC Protocol for Wireless Sensor Network

  • Yang, Yuan;Zhen, Fu;Lee, Tae-Seok;Park, Myong-Soon
    • Journal of Information Processing Systems
    • /
    • v.2 no.1
    • /
    • pp.39-43
    • /
    • 2006
  • In this paper, we proposed TASL-MAC, a medium-access control (MAC) protocol for wireless sensor networks. In wireless sensor networks, sensor nodes are usually deployed in a special environment, are assigned with long-term work, and are supported by a limited battery. As such, reducing the energy consumption becomes the primary concern with regard to wireless sensor networks. At the same time, reducing the latency in multi-hop data transmission is also very important. In the existing research, sensor nodes are expected to be switched to the sleep mode in order to reduce energy consumption. However, the existing proposals tended to assign the sensors with a fixed Sleep/Listening schedule, which causes unnecessary idle listening problems and conspicuous transmission latency due to the diversity of the traffic-load in the network. TASL-MAC is designed to dynamically adjust the duty listening time based on traffic load. This protocol enables the node with a proper data transfer rate to satisfy the application's requirements. Meanwhile, it can lead to much greater power efficiency by prolonging the nodes' sleeping time when the traffic. We evaluate our implementation of TASL-MAC in NS-2. The evaluation result indicates that our proposal could explicitly reduce packet delivery latency, and that it could also significantly prolong the lifetime of the entire network when traffic is low.

ECS : Energy efficient Cluster-head Selection algorithm in Wireless Sensor Network (무선 센서 네트워크에서의 에너지 효율적인 클러스터 헤드 선출 알고리즘)

  • Choi, Koung-Jin;Yun, Myung-Jun;Sim, In-Bo;Lee, Jai-Yong
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.32 no.6B
    • /
    • pp.342-349
    • /
    • 2007
  • Clustering protocol of Wireless sensor networks(WSNs) not only reducing the volume of inter-node communication by the nodes's data aggreation but also extending the nodes's sleep times by cluster head's TDMA-schedule coordination. In order to extend network lifetime of WSNs, we propose ECS algorithm to select cluster-head using three variables. It consists of initial and current energy of nodes, round information and total numbers which have been selected as cluster head until current round.