• Title/Summary/Keyword: Schedule information

Search Result 1,093, Processing Time 0.031 seconds

A Genetic Algorithm Based Task Scheduling for Cloud Computing with Fuzzy logic

  • Singh, Avtar;Dutta, Kamlesh
    • IEIE Transactions on Smart Processing and Computing
    • /
    • v.2 no.6
    • /
    • pp.367-372
    • /
    • 2013
  • Cloud computing technology has been developing at an increasing expansion rate. Today most of firms are using this technology, making improving the quality of service one of the most important issues. To achieve this, the system must operate efficiently with less idle time and without deteriorating the customer satisfaction. This paper focuses on enhancing the efficiency of a conventional Genetic Algorithm (GA) for task scheduling in cloud computing using Fuzzy Logic (FL). This study collected a group of task schedules and assessed the quality of each task schedule with the user expectation. The work iterates the best scheduling order genetic operations to make the optimal task schedule. General GA takes considerable time to find the correct scheduling order when all the fitness function parameters are the same. GA is an intuitive approach for solving problems because it covers all possible aspects of the problem. When this approach is combined with fuzzy logic (FL), it behaves like a human brain as a problem solver from an existing database (Memory). The present scheme compares GA with and without FL. Using FL, the proposed system at a 100, 400 and 1000 sample size*5 gave 70%, 57% and 47% better improvement in the task time compared to GA.

  • PDF

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Suh Sang-Wook;Kim Jae-Ho;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.145-154
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

Design of Automated Negotiation Scheduling System for Medical Services (의료서비스를 위한 자동협상 스케줄링 시스템 설계)

  • Kim, Kyoung-Hwan
    • Journal of Internet Computing and Services
    • /
    • v.9 no.3
    • /
    • pp.59-67
    • /
    • 2008
  • New system solves scheduling problem in medical services. The existing scheduling system by FCFS is for a hospital but new system expresses the condition of a hospital and the profit of separate system's parties by the automated negotiation. This system expresses user preference time as a priority number and is designed that the schedule is changed according to the priority number with a negotiation strategy for a patient. And a hospital makes a schedule according to the policy. The system supports customer satisfaction in medical services by considering not only equipment efficiency but also the patent waiting time unlike the existing system considering the idle time for a equipment.

  • PDF

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Kim Jea-Ho;Suh Sang-Wook;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.126-134
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

  • PDF

On Energy-Optimal Voltage Scheduling for Fixed-Priority Hard Real-Time Systems (고정 우선순위 경성 실시간 시스템에 대한 최적의 전압 스케줄링)

  • 윤한샘;김지홍
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.31 no.10
    • /
    • pp.562-574
    • /
    • 2004
  • We address the problem of energy-optimal voltage scheduling for fixed-priority hard real-time systems. First, we prove that the problem is NP-hard. Then, we present a fully polynomial time approximation scheme (FPTAS) for the problem. for any $\varepsilon$>0, the proposed approximation scheme computes a voltage schedule whose energy consumption is at most (1+$\varepsilon$) times that of the optimal voltage schedule. Furthermore, the running time of the proposed approximation scheme is bounded by a polynomial function of the number of input jobs and 1/$\varepsilon$. Experimental results show that the approximation scheme finds more efficient voltage schedules faster than the best existing heuristic.

An Exploratory Study on the IS Audit's Effectiveness Determination between Interest Groups (정보시스템 감리 이해집단별 감리효과 결정요인에 관한 탐색적 연구)

  • Choi, YoungJin;Jung, YongKyu;Ra, JongHei
    • Korean Management Science Review
    • /
    • v.34 no.2
    • /
    • pp.115-123
    • /
    • 2017
  • IS audit has been regarded as contributing to the improvement of the quality of information Systems, recently, it has been argued that it is not possible to expect a effectiveness, because it can offset the schedule burden due to the preparation of additional documents for Audit and it affect to the project schedule. The effectiveness and quality criteria of IS audit are different between groups, because IS audit is responsible for checking the results and process of the developer company. In this study, we modeled between IS effectiveness and auditor competence, audit firm competence, IS audit standards. As a result, it was concluded that auditor competence, audit firm competence, IS audit standards have a positive effect on IS audit effectiveness. However, according to the result of comparing between interest groups, audit firm competence and audit standards were significant in auditor group, but audit standard was significant in requesting organization and developing company thought that auditor was a important factor to audit effectiveness.

A Study on Preventive Maintenance of Container Cranes (컨테이너 크레인의 예방정비 일정에 관한 연구)

  • Yun, Won-Young;Son, Bum-Shin;Choi, Yong-Seok
    • Journal of Navigation and Port Research
    • /
    • v.33 no.6
    • /
    • pp.429-436
    • /
    • 2009
  • Container cranes are main equipments to load and unload containers to container ships at container terminals. If a crane breakdowns, it can reduce the productivity of container terminals. This paper deals with Preventive Maintenance (PM) schedules for the container cranes. The cranes consist of many parts and we analyze the structure of a container crane using the tree models. Next, we apply a Genetic Algorithm (GA) for determining optimal PM schedule and evaluate the performance of the proposed method through simulation system Finally, we explain how to adjust the PM schedule found in industry based on work schedules.

Design and Prototype Implementation of the Curved Plates Flow Tracking and Monitoring System using RFID (RFID 기술을 이용한 곡가공 부재 추적 및 모니터링 시스템 설계 및 프로토타입의 구현)

  • Noh, Jac-Kyou;Shin, Jong-Gye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.6
    • /
    • pp.424-433
    • /
    • 2009
  • In order to improve productivity and efficiency of ship production process, production technology converged with Information Technology can be considered. Mid-term scheduling based on long-term schedule of ship building and execution planning based on short-term production schedule have an important role in ship production processes and techniques. However, data used in the scheduling are from the experiences of the past, cognitive, and often inaccurate, moreover the updates of the data by formatted documents are not being performed efficiently. This paper designs the tracking and monitoring system for the curved plates forming process with shop level. At first step to it, we redefine and analyze the curved plates forming process by using SysML. From the definition and analysis of the curved plates forming process, we design the system with respect to operational view considering operational environment and interactions between systems included and scenario about operation, and with respect to system view considering functionalities and interfaces of the system. In order to study the feasibility of the system designed, a prototype of the system has been implemented with 13.56 MHz RHD hardware and application software.

CPS: Operating System Architecture for Efficient Network Resource Management with Control-Theoretic Packet Scheduler

  • Jung, Hyung-Soo;Han, Hyuck;Yeom, Heon-Young;Kang, Soo-Yong
    • Journal of Communications and Networks
    • /
    • v.12 no.3
    • /
    • pp.266-274
    • /
    • 2010
  • The efficient network resource management is one of the important topics in a real-time system. In this paper, we present a practical network resource management framework, control-theoretic packet scheduler (CPS) system. Using our framework, an operating system can schedule both input and output streams accurately and efficiently. Our framework adopts very portable feedback control theory for efficiency and accuracy. The CPS system is able to operate independent of the internal network protocol state, and it is designed to schedule packet streams in fine-grained time intervals to meet the resource requirement. This approach simplifies the design of the CPS system, and leads us to obtain the intended output bandwidth. We implemented our prototype system in Linux, and measured the performance of the network resource management system under various network QoS constraints. The distinctive features of our principles are as follows: It is robust and accurate, and its operation is independent of internal network protocols.

기후요소를 활용한 철골공사기간 예측 시스템에 관한 연구 - 실시간 진도관리 시스템 적용을 중심으로 -

  • Park, Jung-Lo;Yoo, Seung Kyu;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.213-217
    • /
    • 2009
  • Weather factors affect cost increases and progress management under construction. Because progress schedule is delayed by weather factors, the construction costs are increased. It is an essential element to control the progress schedule applying weather factors to the progress management. This study applies monthly working-day percentages which is estimated by databases of past weather information to RTPM system. Through do progress management in construction projects exactly, will try to minimize risk of process control that do that is to weather factors. Also, will compare calamity in safety supervision side that do that is to weather factors beforehand. Based on the factors and the expected impact of factors together with the weather data during the last 50 years in Seoul region gathered from Korea. Through it, calculated number of month working day of RCA's structural steel work. Studied way that apply to RTPM system.

  • PDF