• 제목/요약/키워드: Schedule information

검색결과 1,093건 처리시간 0.026초

수술용 최대혈액신청량(MSBOS)의 설정 (Guidline for the Maximum Surgical Blood Order Schedule (MSBOS) for Surgical Operations)

  • 신경아;최종태;김현수
    • 대한임상검사과학회지
    • /
    • 제36권2호
    • /
    • pp.153-157
    • /
    • 2004
  • The aim of our study is to determine maximum surgical blood order schedule (MSBOS) in each surgical operation through analyzing usage of blood products at Bundang Jesaeng General Hospital. We investigated the amount of transfused red cells for each operation and calculated crossmatching-to-transfusion ratio (C/T ratio) and MSBOS. This was accomplished by referring to the Laboratory Information System program during 1 year from January through December 2003. Coronary artery bypass surgery and decompressive craniectomy showed the highest MSBOS in our hospital. The average C/T ratio was 3.2 and excessive reservations for blood products have been made for many operations. From this study, guidelines for the optimal blood ordering for each surgery were suggested.

  • PDF

작업분류체계(WBS)를 이용한 안전해체공사 시스템 개발에 관한 연구 (A Study on the Development of Safety Demolition Work System by using Work Breakdown Structure)

  • 김광서;양극영;이용수;윤여완;김천학
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제2권3호
    • /
    • pp.176-187
    • /
    • 1998
  • The Dismantlement and Construction of the buildings have the characteristic of floating change with repetition within a Time Schedule which has fixed resources, that is, Manpower, Materials and Equipments, and involve many disaster factors in performing each processes. But as these factors are variable, a work supervisor should be able to understand data analysed distinctive factors of each activities systematically, organizationally, and scientifically, and diagrammatic information media so that he can control any complex and situation beyond forecast. Thus this study is intended to be a barometer of weighing if the existing process schedule has taken security into consideration by making the characteristics of organization and action of Work package per process in a building field with more factors like these into a network system and is intended to minimize construction disasters by systematizing this into a Transformational Network.

  • PDF

중복시험을 배제할 수 있는 사이버대학의 온라인 실시간 시험 시간표 작성 방안 (A Heuristic Approach for Establishing On-line Real-time Exam Timetables in Cyber Universities)

  • 박찬권;김형도;염지환
    • Journal of Information Technology Applications and Management
    • /
    • 제14권3호
    • /
    • pp.227-236
    • /
    • 2007
  • Students in cyber universities can take every course because there are no physical constraints such as class rooms. On the other hand. cyber universities should take a heavy burden to schedule real-time exams in a designated time period. Any two courses a student takes must not be simultaneously allocated to a time slot in such a schedule. It is well known that the complexity of this kind of scheduling problem increases exponentially as the number of courses does. This research provides a heuristic method to make on-line real-time exam timetables with minimal exam time span. It considers the constraint of not allocating courses a student takes to simultaneous exam time and prioritizes courses by the number of students.

  • PDF

성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구 (A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System)

  • 이상현;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

철도시설의 효율적 4D구현을 위한 개선된 Morphing 시각화 방법론 구축 (Improved Morphing Visualization Methodology for Effective 4D Expression of Railway Facility)

  • 문현석;권중희;김창학;지상복;강인석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.350-353
    • /
    • 2006
  • Generally, 4D CAD can be used for visualizing construction schedule information in railway construction project. It is important that 3D CAD object should be represented by real construction situation according to construction site condition. However, it is difficult to visualize real construction situation in 4D CAD viewer because 3D objects should be separated by limited duration of each activity. This study suggests a morphing technology for visualizing 4D object by each activity schedule according to real construction progress.

  • PDF

Microsoft Project 98을 이용한 금형공장의 일정계획 시스템 개발 (Development of a Scheduling System for Mould and Die Manufacturing Factory Using Microsoft Project 98)

  • 주상윤;옥경진
    • 산업공학
    • /
    • 제13권2호
    • /
    • pp.246-252
    • /
    • 2000
  • As moulds and dies are manufactured through complex processes under the make-to-order production environment, it is very difficult that the manufacturing activities as like observance of the due date, trace of the progress, etc are controlled with a real time. In this paper, a schedule-planning system using the commercial software Microsoft Project 98 is developed to control the procedures of mould and die manufacturing with real time. Once an initial schedule is planned from the BOM information in the intranet, it is rescheduled by data collected from machines on the shop floor. The system is suitable to medium- or small-sized manufacturing companies as well as large-sized ones, because it can be installed with a low cost.

  • PDF

Development and Verification of Operation Management Tool for KASS

  • Minhyuk Son;ByungSeok Lee
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제12권4호
    • /
    • pp.431-436
    • /
    • 2023
  • In order to provide continuous Korea Augmentation Satellite System (KASS) services, the operation organization should continuously and systematically perform operations, maintenance, and technical activities. All subsystems of KASS, all Line Replacement Units (LRUs), and Software Replacement Units (SWRUs) should be operated and maintained continuously. In order to effectively manage these activities, it is necessary to develop an Operation Management Tool (OMT). For this purpose, operation management, operation organization, and operation activities were defined. The defined requirements were divided into general, function, interface, and database for OMT development, and functions and decision-making procedures consisting of site/asset/trouble/work order/schedule management were designed. The OMT developed by reflecting the site and asset information as well as the design content met predefined requirements. The OMT will be actively used in actual KASS operation and will evolve by continuously reflecting the additional requirements of operators. Through this tool, KASS will support continuous service provision.

4D-CAD시스템의 공사정보관리 효율화방안 (Improved Methodology of Construction Information Management in 4D CAD System)

  • 강인석;김창학;지상복;한주아
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1132-1135
    • /
    • 2004
  • Recently. our construction industry is using 4D-CAD system but the public Database (DB) for the 4D-CAD system is insufficiently built. It is difficult to connect 4D-CAD system information such as schedule, drawings. Therefore this study suggest a methodology to link the 4D-CAD system information with work breakdown structure(WBS) and the methodology suggested in this study was applied to a 4D-CAD system

  • PDF

High-speed Hardware Design for the Twofish Encryption Algorithm

  • Youn Choong-Mo;Lee Beom-Geun
    • Journal of information and communication convergence engineering
    • /
    • 제3권4호
    • /
    • pp.201-204
    • /
    • 2005
  • Twofish is a 128-bit block cipher that accepts a variable-length key up to 256 bits. The cipher is a 16­round Feistel network with a bijective F function made up of four key-dependent 8-by-8-bit S-boxes, a fixed 4­by-4 maximum distance separable matrix over Galois Field$(GF (2^8)$, a pseudo-Hadamard transform, bitwise rotations, and a carefully designed key schedule. In this paper, the Twofish is modeled in VHDL and simulated. Hardware implementation gives much better performance than software-based approaches.

한국음악자료 분류에 관한 연구 (A Study of the Classification of Korean Music Materials)

  • 한경신
    • 한국문헌정보학회지
    • /
    • 제32권2호
    • /
    • pp.5-34
    • /
    • 1998
  • 본 연구의 목적은 오늘날 한국음악에 관한 각종 다양한 자료를 융통성있게 수용하면서 학문적 전문지식에 근거한 보편성을 갖는 한국음악분류표를 제시하고자 하는 것이다. 이를 위하여 이론적배경으로서 한국 음악 및 한국음악학의 체계와 각종 음악자료의 유형을 살펴보고, KDC의 한국음악 분야를 비롯 현재 도서관 및 각종 관련기관에서 사용되고 있는 한국음악 관련 분류표들을 분석하여 조사 분석된 분류전개에서 이론적 배경을 근거로 문제점을 찾아 이를 기초로 각종 한국음악 관련 문헌들을 참고로 하여 새로운 한국음악 분야의 분류표를 전개하였다.

  • PDF