• Title/Summary/Keyword: Schedule Risk Management System

Search Result 63, Processing Time 0.026 seconds

Quality Cost Mitigation Strategy through Satellite's Mission Assurance (임무보증활동을 통한 인공위성 품질비용 저감방안)

  • Kim, You-gwang;Lee, Woo-jun;Baek, Myung-jin;Chun, Young-Sik;Lee, Nak-young
    • Journal of Aerospace System Engineering
    • /
    • v.9 no.2
    • /
    • pp.41-46
    • /
    • 2015
  • The various risk factors that affected schedule, costs and mission success, etc. in development of the satellite. This paper derives the considerable "Cost of Quality" factors in the satellite development phase through the survey of practical techniques in respect of measurement of quality cost in the commercial products manufacturing, and proposes mitigation strategy of quality cost using the approach that can be minimized it.

Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

Development of Project Management Process for Product Development (제품개발 프로젝트관리 프로세스 개발)

  • Min, Taek-Kee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.93-101
    • /
    • 2010
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to product development projects and introduces the application cases. This product development project management process model is composed of five top processes of initiation and preparation, planning, implementation management, control, and termination and transfer. The five processes are re-divided into 18 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. This model is applied to the new car development project of a Korean automobile company and introduces the cases, which shows a project charter, a work breakdown structure, a project schedule, a progress s-curve, a risk register, and a performance report.

Domestic Application Plan of Fatigue Risk Management System by Air Traffic Controller (항공교통관제사의 피로위험관리시스템 도입에 따른 국내 적용 방안)

  • Lee, Young-Jong
    • Journal of Advanced Navigation Technology
    • /
    • v.23 no.6
    • /
    • pp.501-506
    • /
    • 2019
  • This paper presents a prescriptive alternative for establishing a FRMS suitable for us based on scientific data ahead of the introduction and implementation of the FRMS for air traffic controllers in order to meet the International Civil Aviation Organization (ICAO) international standards. I would like to present. Therefore, we confirmed the operation of each air traffic control agency against the current domestic operating standards, and compared and reviewed the operation methods and standards of air traffic control agencies in each country. The controller in Korea defines 10 hours of working hours per day, 8 hours of minimum breaks, and 40 hours per week. Currently, in the case of air traffic control agencies, the daytime and the appropriate working hours are used in the daytime, but in the nighttime, the average time exceeds 5.9 hours. In the case of 40 hours a week, they work an average of 15.7 hours overtime. By adjusting the nighttime work time, this work can be solved by diversifying the form of the worker's input method according to the personal schedule rather than the two-day (day / night) method, as well as the appropriate nighttime time distribution by supplementing the personnel.

Major Studios' Risk Sharing Mechanism in the US TV Drama Industry (미국 TV드라마 산업에서 메이저 스튜디오의 리스크 분산 메커니즘)

  • Yim, Jung-Su
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.11
    • /
    • pp.137-144
    • /
    • 2011
  • This study explored the risk sharing mechanism in the US TV drama industry. The hollywood system of TV production and distribution can be understood to be the result of the efforts to reduce the uncertainty and the risk of investment. Since the 1990s, the vertical integration of major studios and networks has been one of the core strategies for risk sharing. In the strategy, the most important role of networks is to schedule new series that the affiliated studios produce. Networks also provide the new series their brand value. On the other hand, the most important role of studios in the vertical integrated environment is to provide the affiliated networks the infrastructures for production and distribution, financial management, and product management. In addition, networks keep the right on the series in the secondary markets, and attempt to increase the aggressive investment on new series on the base of the rights. However, such a risky investment can be the potential burden and risk for the networks in the future. This paper shows the importance of the reasonable risk sharing in the television drama industry to the Korean TV drama industry that has experienced the conflict between networks and independent production companies.

Literature Review of Key Success Factors of Management Innovation Actions in Domestic - Focused on Six Sigma, TQM, Lean Six Sigma, ERP, TPM, BPR, Project Management, System Engineering - (국내 경영혁신 활동의 핵심 성공요인 문헌 연구 - 6시그마, TQM, 린 6시그마, ERP, TPM, BPR, Project Management, System Engineering 중심으로 -)

  • Mun, JeOk;Yoon, SungPil
    • Journal of Korean Society for Quality Management
    • /
    • v.44 no.3
    • /
    • pp.639-648
    • /
    • 2016
  • Purpose: Existing precedent studies include success factors of individual management innovation activities constantly. However, those studies have limitations about the common key success factors of individual management innovation activities. Methods: For this study, we investigate the key success factors using literature research of the most typical management innovation activities adopted and implemented by many companies in Korea, such as 6sigma, TQM, Lean 6sigma, ERP, TPM, BPR, Project Management, System Engineering. Factors emerging repeatedly was combined into common factors and inherent factors that are necessary for the success of individual management innovation activities are designated to essential factors. Results: 'Essential factors for Six Sigma' consist of 5 items. Black belt operating system, personnel management system linkage, the correct management of the data, perform improvement projects associated with financial performance financial result, linked to financial performance improvement project, project progress management. 'Essential factors of TQM' are arranged 4 items. Quality team's independence and role, goal-setting, Quality Information System, corporate's philosophy of quality first. 'Essential factors of Lean Six Sigma' are the selection of value stream which is based on the customer needs and the value creation and identify the project based on the selected value in the company. 'Essential factors of ERP' are investigated 6 items. Ongoing system maintenance and upgrades, the measurement and support of user satisfaction, the operating systems and the policies for the maintenance, IT infrastructure, change adaption condition monitoring, focusing on improving business performance. 'Essential factors for TPM' are arranged 4 items. Motivated and energetic Bottom-Up, CEO's recognition of the importance facility management, long-term perspective of necessity and ongoing patience. 'Essential factors for BPR' are the pursuit of change process and the staff's sense of crisis management. 'Essential factors for Project Management' are the strategy that reduce the risk management skills through risk management and the understanding and organized management for the project participant's needs. 'Essential factors for System Engineering' consist of 2 items. The first is the design for the best balanced system with pre-analysis about the compromise the cost, schedule and the performance. The second is the analysis of large problem into small problems which can solved. We have found the solution considering components of the interface through the systematic perspective. Conclusion: Common factors and essential factors presented in this study will properly help to introduce the individual management innovation activities for the each business sector and implement management innovation. After this study, new literature research that reflect new studies should accomplish steadily.

Strut as a Permanent System using Composite Beams (층고절감형 거더를 이용한 영구 스트러트 공법)

  • Hong, Won-Kee;Park, Seon-Chee;Kim, Jin-Min;Lee, Ho-Chan
    • KIEAE Journal
    • /
    • v.8 no.1
    • /
    • pp.87-92
    • /
    • 2008
  • Sheathing work used for excavation in a crowded downtown is generally a temporary strut method using H-piles and sheathing wall includes lagging, CIP, SCW or slurry wall. A temporary strut serving the support for sheathing wall acts to resist the earth pressure, but it shall be removed when installing the underground structure members. A traditional temporary strut might cause the stress imbalance of the sheathing wall when it is demolished, resulting in time extension and the risk of collapse. A traditional temporary strut method thus needs to be improved for schedule and cost reduction, risk mitigation and for preparation for potential civic complaint. A permanent strut method doesn't require installing and demolishing the temporary structure that will lead to reducing the time and cost and the structural risk during the demolition process. And given the girder, the part of the underground structure, serves the role of strut, it can secure the wider interval compared to the traditional method, which enables to secure the wider space for the convenience of excavation as well as enhance the constructability and efficient site management. The thesis was intended to study the composite girder designed to use the strut as permanent structure so as to reduce the excavation and floor height.

A Study on the Estimating Rate of Safety Management Cost in Building Work (건축공사 안전관리비 비율 산정 모형에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Yang, Hak-Su
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.5
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

A Study on the Selection of Critical Technology Elements(CTEs) Using Integration Relations between Technologies or Components (기술통합관계를 이용한 핵심요소기술(CTEs) 선정방안 연구)

  • Bae, Yoon-Ho;Choi, Seok-Cheol
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.1
    • /
    • pp.50-56
    • /
    • 2010
  • Military technology transition is the process of transition from the science and technology environment to systems to supply effective weapon systems and support systems to the fighters. In case of technology transition decision, immatured technologies result in increasing acquisition cost and delaying schedule toward the objective system. In this paper, we proposed a method to identify and select critical technology elements by integration relations between technologies or components, for supporting technology transition and risk management of military R&D projects.